You are on page 1of 4

Item 02: Concret

Column

No of
Column

ID
C1
C2
C3
C4
C5
C6
C7
C8
C9

2.00
2.00
1.00
1.00
1.00
3.00
2.00
1.00
1.00

Volume of
Concrete
(Dry) (cft)
H
10.00
150.00
10.00
166.67
10.00
75.00
10.00
75.00
10.00
83.33
10.00
225.00
10.00
83.33
10.00
104.17
10.00
83.33

Dimension
L
1.50
1.67
1.50
1.50
1.67
1.50
0.83
2.08
1.67

W
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83
0.83

Total
Cement Cost= 600 Tk/Bag
Sand Cost = 35 Tk/cft
Stone Chips = 250 Tk/cft

Total Material Cost = Cement Cost + Sand Co

=
Total Cost

349595
=
=

554706.07
554707.00

m 02: Concrete Work (Column)


Labor

Total

Cost/cum Labor Cost


6926.00 29418.37
6926.00 32687.08
6926.00 14709.19
6926.00 14709.19
6926.00 16343.54
6926.00 44127.56
6926.00 16343.54
6926.00 20429.42
6926.00 16343.54
205111.43

Wet
Volm Cement
(cft) (bag)
225.00
26.00
250.00
29.00
112.50
13.00
112.50
13.00
125.00
15.00
337.50
39.00
125.00
15.00
156.25
18.00
125.00
15.00

Materials
Sand
(cft)
64.29
71.43
32.14
32.14
35.71
96.43
35.71
44.64
35.71

183.00 448.21

ost + Sand Cost + Aggregate(Stone Chips ) Cost

Taka

54706.07
54707.00

Taka
Taka

Materials
Aggregate
(cft)
128.57
142.86
64.29
64.29
71.43
192.86
71.43
89.29
71.43
896.43

You might also like