You are on page 1of 1

LOGBOOK TASK 3: (1) Select an appropriate term from the list of words and complete the engine preparation

checklist on-board document. (2) Tick the form boxes of this real document. ENGINE OPERATIONS PREPARATIONS FOR SEA ENGINE PREPARATION CHECKLIST
N 1 Inform the Bridge that the engine will be unattended.* Select on Manual status for the fixed pressure water-spraying 2 system pump* 3 Verify the communications between steering and the Bridge 4 Select the corresponding operation as per vessels condition 5 ............. the air ........... automation 6 Draining manoeuvring air ........., circuit and instrumentation Put in service other/s ............ Generator in parallel and select 7 "Blocked Load". 8 Standby status of the general service ........... 9 Verify bow thruster (s), steering gear(s) and CPP(s) oil levels 10 Turn engine with turning gear and start just with air 11 ........... Main Engine at minimum RPM (at least 30 minutes) 12 Pass the Propulsion System Control to the Bridge 13 Test propeller ........... ahead and astern 14 Visually check all the propulsion equipment 15 Operational test of the bow thruster(s) 16 Verify communication between steering gear and the Bridge 17 ............ gear visual check and working test Knowledgement of the .. Officer.......... of emergency and 18 communication systems 19 Verify soundings . ......... and tanks levels ........... mooring winches and windlass ........... tanks (fore and 20 aft) 21 Synchronize . the clock on the bridge with that in the ECR 22 Inform the Bridge on the completion of the verifications Select on automatic status the fixed pressure water-spraying 23 system pump* 24 Inform the Bridge that the Engine will be unattended .* Pass the engine ............. panel control to the 25 responsible ...........*
Synchronize ECR water-spraying top compensation pumps inform compressors bottles

Yes

No

N/A

unattended alarms Officer soundings operation steering thruster sea-chest pitch start verify Diesel attended

You might also like