Project : NAMAA 44 - Administraion Building Client : Namaa for Development & Real-Estate Investment Co.

Consultant : MEDAD Main Contractor : Horizon for Trading and Contracting MATERIAL SUBMITTAL LOG.
No. Subject REV. 00 REV. 01 REV. 02 REV. 03 Final Approval Expected Sub. Date Sub. DateRec. DateCodeSub. DateRec. DateCodeSub. DateRec. DateCodeSub. DateRec. DateCodeOutgoing SubmittalIncoming Comments

HVAC
1 2 3 4 5 6 7 8 9 ABSORPTION CHILLER COOLING TOWER PUMP EXPANSION TANK WATER TREAMTENT UNITS AIR HANNDLIING UNITS FAN COIL UNITS SPLIT UNIT FANS
22/07/2010 22/07/2010 22/07/2010 22/07/2010 15/08/2010 28/07/2010 28/07/2010 28/07/2010 28/07/2010 28/07/2010 28/07/2010 28/07/2010 05/08/2010 05/08/201 01/09/2010 01/09/2010 01/09/2010 01/09/2010 29/08/2010 22/08/2010 22/7/2010

9.1 SUPPLY FANS 9.2 EXHAUST FAN 9.3 JET FAN 10 AIR OUTLETS 11 ENERGY METERS 12 PIPEING , FITTING & INSULATION 12.1 CHILLED WATER PIPE & FITTING 12.2 FITTING 12.3 INSULATION 13 DUCT WORK 14 ELECTRIC WORKS (MCC) 15 CONTROL WORK

12/07/2010 12/07/2010 15/07/2010 15/07/2010 05/08/2010

12/7/2010 12/7/2010 15/7/2010 22/7/2010 25/08/2010 B

Project : NAMAA 44 - Administraion Building Client : Namaa for Development & Real-Estate Investment Co. Consultant : MEDAD Main Contractor : Horizon for Trading and Contracting MATERIAL SUBMITTAL LOG.
No. Subject REV. 00 REV. 01 REV. 02 REV. 03 Final Approval Expected Incoming Comments Sub. Date Sub. Date Rec. DateCodeSub. DateRec. Date Code Sub. DateRec. Date Code Sub. DateRec. Date Code Outgoing Submittal

PLUMBING
1 2 3 POLY PROPYLENE PIPES & FITTINGS VALVES DUCTILE PIPE AND FITTING VALVES& STRAINER 7/15/2010 7/15/2010 7/15/2010 7/15/2010 7/15/2010 7/15/2010 7/22/2010 7/22/2010 7/22/2010 8/15/2010 8/15/2010 8/15/2010 8/15/2010 7/22/2010 7/12/2010 7/12/2010 7/22/2010 7/22/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 8/24/2010 8/24/2010 8/15/2010 8/15/2010 7/22/2010 7/12/2010 7/12/2010 7/22/2010 7/22/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 8/25/2010 8/8/2010 B B 7/15/2010 7/15/2010 7/15/2010 7/15/2010 7/15/2010 7/15/2010 8/5/2010 8/15/2010 8/8/2010 A 8/8/2010 8/8/2010 8/8/2010 8/8/2010 B B B B 7/12/2010 7/25/2010 7/12/2010 7/25/2010

3.1 THREADES GATE VALVE 3.2 FLANGED GATE VALVE 3.3 CHECK VALVE 3.4 STRAINER 3.5 Pressure Reducing Valve Station 3.6 Water Meter 4 Booster PUMP Set. 4.1 Booster Pump 4.2 pressure vessel 4.3 water tanks 4.3.1 Float valve 4.3.2 automatic level indicator 4.4 FLEXBLE CONNECTION 4.5 PRESSURE GAUGE 5 6 ELECTRICAL WATER HEATER UPVC PIPE AND FITTING

6.1 UPVC PIPE 6.2 UPVC FITTING 7 SUBMERSIBLE PUMPS 7.1 sump pump 7.2 sewage ejector pump 8 PLUMBING SPECIALTIES 8.1 Floor Clean Out 8.2 Floor Drain 8.3 PLANTER DRAIN 8.4 ROOF DRAIN 8.5 Trench Drain 8.6 Trench GRATING 8.7 GULLY TRAP

No.

Subject

REV. 00 REV. 01 REV. 02 REV. 03 Final Approval Expected Incoming Comments Sub. Date Sub. Date Rec. DateCodeSub. DateRec. Date Code Sub. DateRec. Date Code Sub. DateRec. Date Code Outgoing Submittal

PLUMBING
8.8 HOSE BIBS 7/28/2010 7/28/2010

No.

Subject

REV. 00 REV. 01 REV. 02 REV. 03 Final Approval Expected Incoming Comments Sub. Date Sub. Date Rec. DateCodeSub. DateRec. Date Code Sub. DateRec. Date Code Sub. DateRec. Date Code Outgoing Submittal

PLUMBING
9 FRAME AND COVER 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/12/2010 7/12/2010 7/12/2010 7/12/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/12/2010 7/12/2010 7/12/2010 7/12/2010 9.1 SUMP PIT 9.2 INSPECTION CHEMBER 9.3 GULLY TRAP 9.4 CATCH BASIN 9.5 RETARDING CHAMBER 9.6 MANHOLE COVER 10 PLUMING FIXTURE 10.1 Water Closets 10.2 Lavatories 10.3 Urinal 10.4 Janitor Sink
9/5/2010

Project : NAMAA 44 - Administraion Building Client : Namaa for Development & Real-Estate Investment Co. Consultant : MEDAD Main Contractor : Horizon for Trading and Contracting MATERIAL SUBMITTAL LOG.
No. Subject REV. 00 REV. 01 REV. 02 REV. 03 Final Approval Expected Sub. Date Sub. Date Rec. Date CodeSub. DateRec. Date Code Sub. DateRec. Date Code Sub. DateRec. Date Code Outgoing SubmittalIncoming Comments

FIRE FIGHTING
1

FIRE EXTINGISHERS & FIRE CABINETS Fire Extinguishers


7/15/2010 7/15/2010 7/15/2010 7/15/2010 7/15/2010 7/15/2010 8/25/2010 8/25/2010 8/18/2010 A A A

1.1 FE-1 6 kg dry powder fire extinguisher 1.2 FE-3 6 kg CO2 fire extinguisher 1.3 FE-4 10 kg Automatic dry powder fire extinguisher

FIRE CABINETS
FC-1 (Fully recessed in wall -solid steel door ,sized to contain 1.4 1" fire hose reel &30m long c/w P.R.V 1" and two dry powder fire extinguisher 6 kg FC-3 (Fully recessed in wall-solid steel door with full glass 1.5 door ,sized to contain 2.5" fire hose reel &30m long and fire hose valve 2.5" & branch pipe (Naffco) 1.6 FIRE HOSE 65 mm * 30 m 1.7 65 mm BRANCH PIPE 2 7/15/2010 8/2/2010

7/15/2010

8/2/2010

7/28/2010 7/12/2010 7/12/2010 7/12/2010 8/5/2010

7/28/2010 7/12/2010 7/12/2010 7/12/2010 8/5/2010

8/18/2010

C C

BLACK STEEL PIPING & FITTINGS

2.1 Black Seamless Steel Pipes, Sch. 40 2.2a Threaded Fittings 2" & Less 2.2b Welded Fittings 21/2" & more 2.3 Hangers,Threaded Rods,Nuts , Washers,Anchor&Supports 3 3.1

8/8/2010

VALVES O.S & Y GATE VALVES


200 , 150 & 80 mm with supervisory switchs

7/28/2010

7/28/2010

3.2 WATER FLOW SWITCH 150 , 100 , 80 & 50 mm Water Flow Switch (Vane Type) 3.3 3.4 3.5 3.6 3.7 3.8 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 8/18/2010 8/16/2010 8/16/2010 8/16/2010 8/18/2010 8/18/2010 C B A B B B

TEST & DRAIN UNIT 25mm PRESSURE GAUGE +COCK VALVE AUTOMATIC AIR VALVE 25mm SWING CHECK VALVES
100mm with ball drip

HOSE VALVES BUTTERFLY VALVES


150 mm , 100mm , 80mm , 50mm

No.

Subject

REV. 00 REV. 01 REV. 02 REV. 03 Final Approval Expected Sub. Date Sub. Date Rec. Date CodeSub. DateRec. Date Code Sub. DateRec. Date Code Sub. DateRec. Date Code Outgoing SubmittalIncoming Comments

FIRE FIGHTING
4

ALARM CHECK VALVE set (6") consists of :Alarm check valve + Retard chamber + Water motor alarm 7/28/2010 7/28/2010 8/16/2010 B

5 6 6.1

FLOW METER
For 1000 gpm pumps (6") - grooved ends 7/28/2010 7/28/2010 8/16/2010 A

SPRINKLER
15 mm Chrome plated pendent concealed S. response sprinkler 68 C , k=5.6 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 7/28/2010 8/18/2010 8/18/2010 A A

6.2 15 mm Upright brass S. response sprinkler 6.3 Spare Cabint for pendent concealed sprinkler 6.4 Spare Cabint for Upright brass sprinkler 7 8 9 9.1 9.2 10 DUCTILE IRON PIPES ,FITTING & ACCESSSORIES

SIAMESE CONNECTION
Fire department connection 65mm x 65mm x 100mm

PUMPS
Horizontal Split Case Electric Driven Fire Pumps Fire Pump Controller Vertical Multi-Stage Jockey Pump Jockey Pump Controller 7/22/2010 7/22/2010 7/22/2010 7/22/2010

CARBON DIOXIDE SYSTEM (CO2)


100 Lbs.Cylinder & valve assembly,Straight siphon &Discharge head ,Plain nut &Flexible hose 3/4" Electrical control head,24VDC Pressure operated control head 2Cylinder strap,100ib Safety outlet,3/4" NPT 2400-2800psi(165-193 bars) Check valve 2" Control Panel FENWALNET 6000 (Addresseble) Strobe- horn unit NS-241575W-AR 6" alarm bell Flashing lamp Manual release station Fenwal 3300 Discharge nozzles Optical smoke detector Warning signs Directional valve Heat detector Flame detector 8/15/2010 8/15/2010 8/15/2010 8/15/2010 8/15/2010 8/15/2010 8/15/2010 8/15/2010 8/15/2010 8/15/2010 8/15/2010 8/15/2010 8/15/2010 8/15/2010 8/15/2010 8/15/2010 8/15/2010 8/30/2010 8/30/2010

11 Diesel Fire Pump

No.

Subject

REV. 00 REV. 01 REV. 02 REV. 03 Final Approval Expected Sub. Date Sub. Date Rec. Date CodeSub. DateRec. Date Code Sub. DateRec. Date Code Sub. DateRec. Date Code Outgoing SubmittalIncoming Comments

FIRE FIGHTING

Project : CEDAR GLASS EGYPT Client :CEDAR GLASS EGYPT Consultant : MASSOUD - KIM Main Contractor : Horizon for Trading and Contracting SHOP DRAWINGS LOG
No. Drawing No. Drawing Title Expected Sub. Date REV. 00 Sub. Date Rec. DateCode

HVAC 1- OFFICE BUILDING


1 2 3 4 5 6 8 7

SHD-OFF.-G-A/C-A-01-(A/C-101)(A01) SHD-OFF.-1ST.F.-A/C-A-01-(A/C-102)(A01) SHD-OFF.-2ND.F.-A/C-A-01-(A/C-102)(A01) SHD-OFF.-3RD.F.-A/C-A-01-(A/C-102)(A01) SHD-OFF.-R.F.-A/C-A-01-(A/C-103)(A01) SHD-OFF.-SCHD.-A/C-A-01-(A/C-104)((A01) SHD-OFF.-R.D.-A/C-A-01(A01) SHD-DET.-A/C-(A01)

GROUND FLOOR- Part (A) FIRST FLOOR- Part (A) SECOND FLOOR- Part (A) THIRD FLOOR- Part (A) ROOF FLOOR- Part (A) HVAC-SCHEDULE HVAC-SPLIT RISER DIGRAM HVAC-DETAILS

2- RESTAURANT BUILDING
1 2 3 4

SHD-REST.-G-A/C-A-01-(A/C-202)(A0) SHD-REST.-1ST.F-A/C-A-01-(A/C-202)(A0) SHD-REST.-SCHD.-A/C-A-01-(A/C-203)(A01) SHD-REST.-A.R.D-A/C-A-01-(A/C-203)(A01)

GROUND & FIRST FLOOR- Part (A) ROOF FLOOR & SECTIONS- Part (A) HVAC-SCHEDULE HVAC-AIR RISER DIAGRAM

3- SECURITY BUILDING
1 3 8

SHD-SEC.-A/C-A-01-(A/C-202)(A0) SHD-SEC.-SCHD.-A/C-A-01-(A/C-202)(A01) SHD-SEC.-R.D.-A/C-A-01(A01)

GROUND & FIRST FLOOR- Part (A) HVAC-SCHEDULE HVAC-SPLIT RISER DIGRAM

4- FACTORY: 4A-HVAC FACTORY LAYOUT


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (SHD-OUT-FACT.-A/C)-(A-01)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-02)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-03)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-04)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-05)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-06)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-07)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-08)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-09)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-10)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-11)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-12)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-13)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-14)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-15)-(A/C-301)-(CUST.) (SHD-OUT-FACT.-A/C)-(A-16)-(A/C-301)-(CUST.) HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT HVAC WORK- FACTORY LAYOUT

4B-HVAC FACTORY ROOF


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (SHD-R.F.-FACT.-A/C)-(A-01)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-02)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-03)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-04)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-05)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-06)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-07)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-08)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-09)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-10)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-11)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-12)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-13)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-14)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-15)-(A/C-302)-(CUST.) (SHD-R.F.-FACT.-A/C)-(A-16)-(A/C-302)-(CUST.) HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN HVAC WORK-ROOF PLAN

SHD-FACT.-SCHD.-A/C-A-01-(A/C-303)(A01)

HVAC-SCHEDULE-FACTORY

Project : CEDAR GLASS EGYPT Client :CEDAR GLASS EGYPT Consultant : MASSOUD - KIM Main Contractor : Horizon for Trading and Contracting SHOP DRAWINGS LOG
No. Drawing No. Drawing Title REV. 00 Expected Sub. Date Sub. Date Rec. DateCode

PLUMBING 1- FACTORY: 1A-OUTSIDE FACTORY NETWORK


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

(SHD-OUT-FACT.-DR.)-(A-01)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-02)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-03)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-04)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-05)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-06)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-07)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-08)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-09)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-10)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-11)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-12)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-13)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-14)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-15)-(DR-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-16)-(DR-01)-(CUST.)

OUTSIDE Drainage NETWORK System LAYOUT FOR GENERAL PROJECT LAYOUT OUTSIDE Drainage NETWORK System LAYOUT FOR GENERAL PROJECT LAYOUT OUTSIDE Drainage NETWORK System LAYOUT FOR GENERAL PROJECT LAYOUT OUTSIDE Drainage NETWORK System LAYOUT FOR GENERAL PROJECT LAYOUT OUTSIDE Drainage NETWORK System LAYOUT FOR GENERAL PROJECT LAYOUT OUTSIDE Drainage NETWORK System LAYOUT FOR GENERAL PROJECT LAYOUT OUTSIDE Drainage NETWORK System LAYOUT FOR GENERAL PROJECT LAYOUT OUTSIDE Drainage NETWORK System LAYOUT FOR GENERAL PROJECT LAYOUT OUTSIDE Drainage NETWORK GENERAL PROJECT LAYOUT OUTSIDE Drainage NETWORK GENERAL PROJECT LAYOUT OUTSIDE Drainage NETWORK GENERAL PROJECT LAYOUT OUTSIDE Drainage NETWORK GENERAL PROJECT LAYOUT OUTSIDE Drainage NETWORK GENERAL PROJECT LAYOUT OUTSIDE Drainage NETWORK GENERAL PROJECT LAYOUT System LAYOUT FOR System LAYOUT FOR System LAYOUT FOR System LAYOUT FOR System LAYOUT FOR System LAYOUT FOR

OUTSIDE Drainage NETWORK System LAYOUT FOR GENERAL PROJECT LAYOUT OUTSIDE Drainage NETWORK System LAYOUT FOR GENERAL PROJECT LAYOUT

1B- FACTORY BUILDING-FURNACE


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 (SHD-FURN-FACT.-DR.)-(A-01)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-02)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-03)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-04)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-05)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-06)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-07)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-08)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-09)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-10)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-11)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-12)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-13)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-14)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-15)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-16)-(DR-02)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-17)-(DR-02)-(CUST.) PLUMBING WORK-FURNACE BUILDING-GROUND & BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND & BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND BASEMENT PLAN & & & & &

PLUMBING WORK-FURNACE BUILDING-GROUND & BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND & BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND & BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND & BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND & BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND & BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND & BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND & BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND & BASEMENT PLAN PLUMBING WORK-FURNACE BUILDING-GROUND & BASEMENT PLAN

1C- FACTORY BUILDING-FURNACE-ROOF


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (SHD-FURN-FACT.-DR.)-(A-01)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-02)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-03)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-04)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-05)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-06)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-07)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-08)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-09)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-10)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-11)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-12)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-13)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-14)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-15)-(DR-03)-(CUST.) (SHD-FURN-FACT.-DR.)-(A-16)-(DR-03)-(CUST.) PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN PLUMBING WORK-FURNACE BUILDING-ROOF PLAN

2- SECURITY BUILDING
1 (SHD-SECU..-DR.)-(A-01)-(GN-01-4808)-(A1) PLUMBING WORK-SECURITY BUILDING

(SHD-SEPEC..-DR.)-(A-01)-(ST-01)-(A1)

SEPTEC TANK

(SHD-DET...-DR.)-(A-01)

PLUMBING WORK-DETAILS

Project : CEDAR GLASS EGYPT Client :CEDAR GLASS EGYPT Consultant : MASSOUD - KIM Main Contractor : Horizon for Trading and Contracting SHOP DRAWINGS LOG
No. Drawing No. Drawing Title REV. 00 REV. 01 Expected Sub. Date Sub. DateRec. DateCodeSub. Date

FIRE FIGHTING 1- FACTORY: 1A-OUTSIDE FACTORY NETWORK


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (SHD-OUT-FACT.-F.F.)-(A-01)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-02)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-03)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-04)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-05)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-06)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-07)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-08)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-09)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-10)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-11)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-12)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-13)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-14)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-15)-(FF-01)-(CUST.) (SHD-OUT-FACT.-F.F.)-(A-16)-(FF-01)-(CUST.) FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK FIRE FIGHTING OUT SIDE NETWORK 11-Jul-10 12-Jul-10 13-Jul-10 14-Jul-10 15-Jul-10 16-Jul-10 17-Jul-10 18-Jul-10 19-Jul-10 20-Jul-10 21-Jul-10 22-Jul-10 23-Jul-10 24-Jul-10 25-Jul-10 26-Jul-10

1B- FACTORY BUILDING-FURNACE


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 (SHD-FURN-FACT.-F.F.)-(A-01)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-02)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-03)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-04)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-05)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-06)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-07)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-08)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-09)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-10)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-11)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-12)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-13)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-14)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-15)-(FF-02)-(CUST.) (SHD-FURN-FACT.-F.F.)-(A-16)-(FF-02)-(CUST.) FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING FIRE FIGHTING WORK FURNACE BUILDING 11-Jul-10

2- FM200
1 2 3 4 SHD-SEC.FM200-FUR.-FACT.-F.F.)-(A-01) SHD-SEC.FM200-FUR.-FACT.-F.F.)-(A-02) SHD-SEC.FM200-FUR.-FACT.-F.F.)-(A-03) SHD-SEC.FM200-FUR.-FACT.-F.F.)-(A-04) FM200 System-SECTION FM200 System-SECTION FM200 System-SECTION FM200 System-SECTION

5 6 7 8

SHD-FM200-FUR.-FACT.-F.F.)-(A-01) SHD-FM200-FUR.-FACT.-F.F.)-(A-02) SHD-FM200-FUR.-FACT.-F.F.)-(A-03) SHD-FM200-FUR.-FACT.-F.F.)-(A-04)

FM200 System-PLAN & ISOMETRIC FM200 System-PLAN & ISOMETRIC FM200 System-PLAN & ISOMETRIC FM200 System-PLAN & ISOMETRIC

3- OFFICE BUILDING-FURNACE
1 2 3 4 5 6 (SHD-G-OFF-F.F.)-(A-01)-(FF-01)-(A01) (SHD-1ST-OFF-F.F.)-(A-01)-(FF-02)-(A01) (SHD-2ND-OFF-F.F.)-(A-01)-(FF-03)-(A01) (SHD-3RD-OFF-F.F.)-(A-01)-(FF-04)-(A01) (SHD-R.F-OFF-F.F.)-(A-01)-(FF-05)-(A01) (SHD-F.R.D.-OFF-F.F.)-(A-01) FIRE FIGHTING WORK-GROUND FLOOR(OFFICE BUILDING) FIRE FIGHTING WORK-FIRST FLOOR(OFFICE BUILDING) FIRE FIGHTING WORK-SECOND FLOOR(OFFICE BUILDING) FIRE FIGHTING WORK-THIRD FLOOR(OFFICE BUILDING) FIRE FIGHTING WORK-ROOF(OFFICE BUILDING) FIRE FIGHTING WORK-RISER DIAGRAM(OFFICE BUILDING)

4- RESTRAURANT & LAB.R.


1 (SHD-G&1ST-REST-F.F.)-(A-01)-(FF-01/FF-02)-(A01) FIRE FIGHTING WORK-GROUND & FIRST FLOOR(RESTRAUNT & LAB.R.)

5- DETAILS
6 (SHD-DET.-F.F.)-(A-01) FIRE FIGHTING WORK-DETAILS

Project : CEDAR GLASS EGYPT Client :CEDAR GLASS EGYPT Consultant : MASSOUD - KIM Main Contractor : Horizon for Trading and Contracting SHOP DRAWINGS LOG-coordination
No. Drawing No. Drawing Title Expected Sub. Date REV. 00 Sub. Date Rec. DateCode

1- OFFICE BUILDING
1 2 3 4

(SHD-G-CORD.-TRAD.-A-01)(A01) (SHD-1ST-CORD.-TRAD.-A-01)(A01) (SHD-2ND-CORD.-TRAD.-A-01)(A01) (SHD-3RD-CORD.-TRAD.-A-01)(A01)

GROUND FLOOR -COORDINATION TRADES- Part (A) FIRST FLOOR -COORDINATION TRADES- Part (A) SECOND FLOOR -COORDINATION TRADES- Part (A) THIRD FLOOR -COORDINATION TRADES- Part (A)

2- RESTAURANT
1

SHD-G-A/C-A-01-(A/C-202)(A0)

GROUND & FIRST FLOOR -COORDINATION TRADES- Part (A)

3- FACTORY: 3AOUTSIDE FACTORY NETWORK


1 2 3 4 5 6 7 8 9 (SHD-OUT-FACT.-CORD.-TRAD.)-(A-01)-(CUST.) (SHD-OUT-FACT.-CORD.-TRAD.)-(A-02)-(CUST.) (SHD-OUT-FACT.-CORD.-TRAD.)-(A-03)-(CUST.) (SHD-OUT-FACT.-CORD.-TRAD.)-(A-04)-(CUST.) (SHD-OUT-FACT.-CORD.-TRAD.)-(A-05)-(CUST.) (SHD-OUT-FACT.-CORD.-TRAD.)-(A-06)-(CUST.) (SHD-OUT-FACT.-CORD.-TRAD.)-(A-07)-(CUST.) (SHD-OUT-FACT.-CORD.-TRAD.)-(A-08)-(CUST.) (SHD-OUT-FACT.-CORD.-TRAD.)-(A-09)-(CUST.) OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES

3BFACTORY BUILDING-FURNACE
1 2 3 4 5 6 7 8 9 (SHD-FURN-FACT.-CORD.-TRAD.)-(A-01)-(CUST.) (SHD-FURN-FACT.-CORD.-TRAD.)-(A-02)-(CUST.) (SHD-FURN-FACT.-CORD.-TRAD.)-(A-03)-(CUST.) (SHD-FURN-FACT.-CORD.-TRAD.)-(A-04)-(CUST.) (SHD-FURN-FACT.-CORD.-TRAD.)-(A-05)-(CUST.) (SHD-FURN-FACT.-CORD.-TRAD.)-(A-06)-(CUST.) (SHD-FURN-FACT.-CORD.-TRAD.)-(A-07)-(CUST.) (SHD-FURN-FACT.-CORD.-TRAD.)-(A-08)-(CUST.) (SHD-FURN-FACT.-CORD.-TRAD.)-(A-09)-(CUST.) OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES OUT SIDE FACTORY NETWORKLAYOUT-COORDINATION FOR ALL TRADES

4- DETAILS
6 (SHD-DET.-CORD.-TRAD.)-(A-01) GENERAL WORK-DETAILS

Project : CEDAR GLASS EGYPT Client :CEDAR GLASS EGYPT Consultant : MASSOUD - KIM Main Contractor : Horizon for Trading and Contracting SHOP DRAWINGS LOG
No. Drawing No. Drawing Title REV. 00 Expected Sub. Date Sub. Date Rec. DateCode

WATER SUPPLY 1- FACTORY: OUTSIDE WATER SUPPLY NETWORK


1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

(SHD-OUT-FACT.-DR.)-(A-01)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-02)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-03)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-04)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-05)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-06)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-07)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-08)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-09)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-10)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-11)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-12)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-13)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-14)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-15)-(WS-01)-(CUST.) (SHD-OUT-FACT.-DR.)-(A-16)-(WS-01)-(CUST.)

OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT OUT SIDE WATER SUPPLY NETWORK System LAYOUT FOR OUT SIDE PROJECT LAYOUT

(SHD-DET.-WS.)-(A-01)

WATER SUPPLY-DETAILS

2- water tank:
1 2 3 3

(SHD-TANK1-WT.)-(A-01)-(WT-01)-(CUST.) (SHD-TANK2-WT.)-(A-01)-(WT-02)-(CUST.) (SHD-TANK3-WT.)-(A-01)-(WT-03)-(CUST.) (SHD-TANK4-WT.)-(A-01)-(CUST.)

WATER WATER WATER WATER

TANK TANK TANK TANK

DETAIL DETAIL DETAILS DETAILS