You are on page 1of 1

The minimum testinq for GOM GementinqOperations All testing is required on rig samples and to be submitted to BP Wells Team24

hours prior to cementing operationscommence(unfess otherwse agreedwith Wells Team) (all GeneralReauirements slunies atl iob tvpes) . r All slurries incorporatinga Fluids Loss aid must have APIfluid loss determined Slurnes placed for control of Shallow Ftows (conductor or surtace pipe) or where gas migrction risk is high (predicted flow potential is high and/or static cement overbalance< 200psi against a permeablegas Dearingformations,lmust have static gel strength transition time and zero gel time determined,

Specific Rsouirements
Job Type Conductor

Slurry

Pump Time
Note 1

Compressive Operating API Strength Free FIuid Water Loss


No

Rheology

BP Settlement Test
No No No No No No Note 3

Neat Extended Surface Lead Tail lntermediate Lead

Yes Yes Yes


Yes

Yes
Note 2

No Yes

Yes
No Yes

Yes Yes Yes


Yes YeS

No No No

No
No No

No Yes No No

Yes Yes
Yes

Production Lead and Casing and Tail Drillino liners


Production Liner Plugs

Yes Yes Yes

Yes Yes Yes

No
Yes No

Yes Yes

Yes Yes

Yes
Note 3

Note 1 Extendedtesting regime applies if temperature > 40oC or slurry not Class G/H + accelerator. For deep water test slurries j t.S SC @ no less than 15oC. Less than 1.9 GS should be tested at <1OoC Note 2 Where structuralsupport or zonal isolation is requiredcompressivestrength musi be determined. When purely a filler slurry il is unnecessary. Note 3 When the hole angle exceeds 70' a BP settlement tesi is required.

Compatibilitv Testino for GOM WBMand OBM For liner jobs and where cement is pumpeddirectlyin contactwith the drillingfluid a to thickening tesl is required time usinga 95/5cement mudcontaminant. contaminated isolating on test For everywellAPI mud/spacer compatibility shouldbe performed intervals brine or water bearing bearingformationsand permeableoverpressured hydrocarbon (mudspacer formations eachsection combinations needto be testedonceperwell). only for for strength shouldbe determined a log evaluation is to be run compressive Wherea cement 95/5cement/spacer combination. OBMOnlv
Water wetting characteristicsof the spacer to be confirmed on a metal coupon test with sample of field mud for once each well.
Sept2004

LiTG/Aberdeen DarylKellingray

bzTz
CONFIDENTIAL
Exhibit No. Worldwidc Courr Inc.

4s 1 BP-HZN-2 7gMD102227 1

You might also like