hours prior to cementing operationscommence(unfess otherwse agreedwith Wells Team) (all GeneralReauirements slunies atl iob tvpes) . r All slurries incorporatinga Fluids Loss aid must have APIfluid loss determined Slurnes placed for control of Shallow Ftows (conductor or surtace pipe) or where gas migrction risk is high (predicted flow potential is high and/or static cement overbalance< 200psi against a permeablegas Dearingformations,lmust have static gel strength transition time and zero gel time determined,
Specific Rsouirements
Job Type Conductor
Slurry
Pump Time
Note 1
Rheology
BP Settlement Test
No No No No No No Note 3
Yes
Note 2
No Yes
Yes
No Yes
No No No
No
No No
No Yes No No
Yes Yes
Yes
No
Yes No
Yes Yes
Yes Yes
Yes
Note 3
Note 1 Extendedtesting regime applies if temperature > 40oC or slurry not Class G/H + accelerator. For deep water test slurries j t.S SC @ no less than 15oC. Less than 1.9 GS should be tested at <1OoC Note 2 Where structuralsupport or zonal isolation is requiredcompressivestrength musi be determined. When purely a filler slurry il is unnecessary. Note 3 When the hole angle exceeds 70' a BP settlement tesi is required.
Compatibilitv Testino for GOM WBMand OBM For liner jobs and where cement is pumpeddirectlyin contactwith the drillingfluid a to thickening tesl is required time usinga 95/5cement mudcontaminant. contaminated isolating on test For everywellAPI mud/spacer compatibility shouldbe performed intervals brine or water bearing bearingformationsand permeableoverpressured hydrocarbon (mudspacer formations eachsection combinations needto be testedonceperwell). only for for strength shouldbe determined a log evaluation is to be run compressive Wherea cement 95/5cement/spacer combination. OBMOnlv
Water wetting characteristicsof the spacer to be confirmed on a metal coupon test with sample of field mud for once each well.
Sept2004
LiTG/Aberdeen DarylKellingray
bzTz
CONFIDENTIAL
Exhibit No. Worldwidc Courr Inc.
4s 1 BP-HZN-2 7gMD102227 1