From:Peijs, Jasper Sent:TueApr06 08:11:03 2010 To: Daly,Mike(SJS) Subjecl Weekly wellupdate lmportance: Normal Attachments: lpagers_v2.

pdf; Weekly Exploration Drilling Report April5th.doc Mike, Good u'eek ourwells. for
Macondo - discovery Hodoahasmadeup a lot of groundand shouldbe into secondary Ml5 targetthis week Fragataand Mocassinare silently running along. Fragatawill seea secondary target in the suprasalt Crelaeous week. llris Even Tuckerlookslike it is readyto drill ahead, with BOP problems fixed hopefully give you a better

Beenrvorking with the teans 1oimprove the flow of information. The new feel for the geologiccontext.I will updatethe TD eachrveek. Regards, Jaspcr Peijs

ExecutiveAssistant lMike Daly f1.1,020.'l496.4(126 plrorrc: 96.157 | rnobile:I I+ l)11-/t,53512() : I 4-1.1J20.7,i 3 | email: Beijqi@bp,eqq | {a:i l3Pplt | | Si.Janres's Square. floorI l,orrr"krrr, 5tlr SVvIY+PD| [Jniled I{inp-dorn

b3Kh
Exhibit No. Worldwide Court

CONFIDENTIAL

BP- HZN- 21 79MD100007060


BP-HZN-2 79MD100007060 1

WeeklyExplorationDrilling ReportApril 06 F Fragata-l: (waterdepth2484m) progressing ahead plan. of Drilledto 4,125m. Ready run 16" liner.Top Cretaceous to post encountered at3965m.Secondary salttargetexpected at 4185m(Caracarachannel). 5875m.Likely resultwithin PTD the next 30 days. goodprogress week,drilled F Hodoa:(waterdepth1078m) this liner. Now only B daysbehind to 49l0md andran 1l-314" pre-drillPmean. Next section testthe secondary will Aquitanian Ml5 target. This is now deeper thanoffset Primarvtarsetis the O70.PTD is controlfrom Raven. 6 160m (water TD, Macondo: Current depth5,08l') discovery. roughly 18255'md. Reached M56 targetandencountered -100' of payversus predicted. of uncertainty on Lots 95' (no upside ... volumes wirelineyet)andsome as F temperatures coolerthanpredicted so porosities are couldbe better (losses) whatlookslike pay F well is currently in stopped F if possible wouldlike to testthe M54/55secondary we 1000ft. targetwhichwill requiredrilling another planis to getthe well stable, F Forward TOOHto switch out BHA, TIH anddrill ahead. PTD 19,650'. in Mocassin: afterhaving 18",drillingahead saltat set 13,130' Base at21,000'. md. salt F Tucker:BOP appears be tixed.Currently to runningin hole readyto drill out. Current well TD is 24,986'(belowsalt). E12 tarset 28.608'md. at

CONFIDENTIAL

79M DL00007066 B P- HZN- 21


BP-HZN-217MD100007066 9