Professional Documents
Culture Documents
Invoice Serang Ok
Invoice Serang Ok
: Re-instal : 3 02RKB014 PO Site type : RBS Type : Team ITC : 4 02RKB073 PO Site type : RBS Type : Team ITC :
SITE NAME CIPINING 4505839949 Shelter 2206 / 900 - BBS REVI PASIR KACAPI 4505839949 Shelterless 2206 / 900 - BBS REVI Nobi rbs-bbs GEDANG 4505839949 Shelter 2206 / 900 - BBS REVI SAJIRA 4505839949 Shelter 2206 / 900 REVI
AREA Serang
SOW
VI
1.1 4.1
SUB SOW Dismantle 1 Cab NSN Outdoor, Install 1 RBS 22x6 900, 1 RBS 22x6 1800, Antenna feeder system RBS IMPLEMENTATION NEW SITE - MACRO BTS with Power System Replacement (Swap) RBS Cabinet (Indoor only) 1 to 1
site site
Dismantle 1 Cab NSN Outdoor, Install 1 RBS 22x6 900, 1 RBS 22x6 1800, Antenna feeder system RBS IMPLEMENTATION NEW SITE - MACRO BTS with Power System Replacement (Swap) RBS Cabinet (Indoor only) 1 to 1
site site
Dismantle 1 Cab NSN Outdoor, Install 1 RBS 22x6 900, 1 RBS 22x6 1800, Antenna feeder system RBS IMPLEMENTATION NEW SITE - MACRO BTS with Power System Replacement (Swap) RBS Cabinet (Indoor only) 1 to 1
site site
Dismantle 1 Cab NSN Outdoor, Install 1 RBS 22x6 900, 1 RBS 22x6 1800, Antenna feeder system RBS IMPLEMENTATION NEW SITE - MACRO BTS with Power System Replacement (Swap) RBS Cabinet (Indoor only) 1 to 1
site site
6,453,000
3,100,000.0
6,453,000
6,453,000
6,453,000
25,812,000