PROWELD SERVICES LTD STEEL STR.

FAB WORK PROGRESS REPORT

WORK ELEMENTS (COLUMN LINE/ SECTIONS 1 MAIN PIPE RACK EXT 366a,367a,372a,362 SUBTOTAL

PREV.TONS/SECS

TODAY

CUMM

REMARK

45.31 45.31

2 MAIN PIPE RACK H SUBTOTAL 3 NORTH SLEEPER EXT PIPE RACK SEC C &D SUBTOTAL 4 SOUTH SLEEPER EXT PIPERACK SEC E &F SUBTOTAL 24.43 24.43

10.44 10.44

6.59

10.4 10.4

5 MISC PLATFORM1 0.52 0.52

PROWELD SERVICES LTD STEEL STR. FAB WORK PROGRESS REPORT

WORK ELEMENTS (COLUMN LINE/ SECTIONS 5.268041 MAIN PIPE RACK EXT 5.494845 366a,367a,372a,363 5.721649 SUBTOTAL

PREV.TONS/SECS

TODAY

CUMM

REMARK

-6.476107554 -8.828117798

PROWELD SERVICES REPORT STEEL STR. FAB WORK PROGRESS REPORT PROGRESS REPORT

DATE: 13TH dec 2010

S/N

WORK ELEMENTS (COLUMN LINE/SECTIONS 1 MAIN PIPE RACK EXT 366a ,367a,372a,362 SUBTOTAL MAIN PIPE RACK H SUBTOTAL NORTH SLEEPER EXT PIPE RACK SEC C & D SUBTOTAL SOUTH SLEEPER EXT PIPE RACK SEC E & F SUBTOTAL MISC PLATFORM1 SUBTOTAL MISC PLATFORM4 SUBTOTAL TOTAL FAB.AS @11/12 /10

PREV.TONS/SECS

TODAY

CUMM

REMARK

45.31 45.31

24.43 24.43

10.44 10.44

6.59

10.4 10.4

0.52 0.52

19.44 19.44 110.57 6.59 117.16

Total