Description Excavation Footing Qty

Unit

Rate

Nos

Estimate of Work B

Cum

PCC 1:4:8 PCC above footing column deductions base deduction Qty Cum

RCC 1:11/2:3 Footings Panels Columns intermediate column groove deduction Qty

Cum

Shuttering Panels Columns sides sides column end footing sides footing back fiiting front( conservative) Qty Concertina Coil with angle and wire 6 Reinforcement Steel Sqm

Rmt Kg

7 Transportation and fixing cost 8 Cost of back filling with earth deduct column

MT cum

9 Panel to column joint 10 Sand Filling

No.

cum

Total cost for 45m

Cost per Running meter

Estimate of Work H/D

Qty -

Amount -

Estimate of Work
S.N. 1 a. b. 2 a. b. 3 a. b. c. d RCC Footings Plinth Beam Padestal Column upto NGL CUM CUM CUM CUM F1 C1 C2 C1 C2 PCC Footings Plinth Beam CUM CUM F1 Discription Exavation Footings Plinth Beam CUM CUM F1 Unit Refrence Nos Length Width

e 4 a.

Top Tie beam Reinforcement Footings F1 Footing Beam Footing Beam

CUM

KG KG KG KG

Sort Span Long Span 12 Dia 16 Dia Stirrups 12 Dia Stirrups

Plinth Beam

Kg

Column c1 Column c2

KG KG

12dia stirrups 20dia stirrups inner stirrups 10 Dia Stirrups

Top Tie Beam

Kg

5 a.

Shuttring Footing SQM SQM F1

SQM SQM b c Plinth Beam Padestal sides SQM SQM SQM SQM SQM SQM SQM SQM CUM CUM SQM SQM SQM

C1 C2 C1 C2

Column sides upto NGL

e 6 a b 7 8 Brick Work

Top Tie Beam Total Wall Sapportings

DPC@50mm Plaster a Total wall Plaster b Sapportings Cement Paint a Total wall Paint b Sapportings

SQM SQM

ate of Work
Height/Depth Quantity Sub Total Rate Amount Per running meter