Project Pastel - Schedule

MAY

Monday

Tuesday

Wednesday

Thursday

Friday

Saturday

Sunday

1
Meeting design, lighting and costume. 11am, student lounge.

2
Casting. All day 9am-6pm.

3
Production meeting 10:15am, all crew to meet in student lounge.

4
Studio 2pm-5pm. Blocking script with stand ins. Planning set design space, lighting, cameras. Pat, Rob and Tom meet to discuss script 5pm onwards.

6
Director and head of cameras (Rob and Tom) to meet to complete shot list & storyboard. (Time TBC)

8
Building of A frames for boards. Meet at reception 4pm.

9
Rehearsals/ blocking with costumes. (Time TBC)

10
Production meeting 10:15am, all crew meet in student lounge.

11
TV Studio 2pm-5pm

12

13
2nd unit location shoot, Margate. Crew due to arrive at 8:30/9:00am.

14

15

16
Tech Rehearsals 6pm-9pm. (TBC)

17
Props to be collected at 6pm. Design team to meet and dress the set.

18 Studio shoot day. 25 Assignment hand-in

19

20

21

22

23

24