You are on page 1of 2

Name of Project: Repair and Retopping of Garage Roof Slab

Location: PHILAMLIFE Village, Las Pias


DETAILED ESTIMATE
ITEM NO.
I.

SPECIFICATION
Repair & Retopping of Garage Roof Slab

QUANTITY
UNIT
48.00 sq.m

Material Cost:
Portland Cement
Fine Sand
Concrete Bond
Sahara, 5 kg
Steel Brush
4" PVC Elbow
4" PVC Pipe
1/4" thk 4' x 8' Ficem Board
PVC Solvent Cement,100cc
6" Stainless Strainer
CWNails
II.

Mobilization and Demobilization

20.00
60.00
4.00
20.00
3.00
3.00
2.00
1.00
1.00
1.00
1.00

bags
sacks
gal
bags
pcs
pc
pcs
pc
can
pc
kg

1.00 lot

UNIT COST

AMOUNT

@
@
@
@
@
@
@
@
@
@
@

220.00
60.00
250.00
50.00
65.00
45.00
800.00
470.00
170.00
200.00
90.00

P
P
P
P
P
P
P
P
P
P
P

5,000.00 P
Subtotal = P

TOTAL COST
LABOR COST

P
P

17,860.00
7,144.00

GRANDTOTAL

25,004.00

AMOUNT IN WORDS: TWENTY FIVE THOUSAND FOUR PESOS ONLY.

Submitted by:

Joel A. Malazarte
PRESIDENT/CHAIRMAN

AMOUNT

4,400.00
3,600.00
1,000.00
1,000.00
195.00
135.00
1,600.00
470.00
170.00
200.00
90.00
5,000.00
17,860.00
17,860.00
7,144.00

25,004.00

You might also like