ESTIMATE FOR MAKING GOOD TO ROOF LEAKAGE AND RECONSTRUCTION OF SOAKAWAY FOR MR. ASIAMAH
ROOFING Demolishing and alteration works A Carefully take down existing micro concrete roof tiles and store for re-use (Total area 187 sq. m) Carefully takedown existing micro concrete ridge cap and remove debris from site (Total lenght 32 m.) Allow for making good to timber in roof carcassing Approved colour Micro concrete roofing tiles laid on hardwood purlins in accordance with manufacturer's instruction Ditto 250mm girth ridge cap ROOFING To Summary
Item
1,450.00
Item Item
180.00 1,400.00
C D
187 32
m m
13.00 18.00
SOAKAWAY F Carefully demolish existing 150mm thick blockwall soakaway and remove debris from site (Total lenght 12 sq m.) Carefully demolish existing 100mm thick concrete slab and remove debris from site (Total lenght 12 sq m.) Solid sandcrete blockwork in cement and sand mortar (1:4) as described in: H J K 150mm Honey comb walls Supply and lay boulders in soakaway Connect septic tank to soakaway 12 6 Item m m 35.00 98.00 420.00 588.00 150.00
Item
200.00
Item
150.00
SOAKAWAY To Summary
1,508.00
CONSTRUCTION OF ADDITIONAL UPVC SEPTIC TANK Excavation A Excavate pit to not exceeding 2m deep commencing at ground level. 150mm thick sand spread in pit to make up level Backfill selected excavated materials around foundation Remove surplus excavated materials from site. UPVC Septic tank with fillters E Supply and install 5000 litres capacity UPVC septic tank including all necessary accessories
29 12 9 20
m m m m
B C D
3,800.00
3,800.00
4,628.10
SOAKAWAY
1,508.00
4,628.10
TOTAL
12,273.10