Evacuation officers came to the factory with their SEWAGE EVACUATION LORRY. Started their operation by 11:20am and ended it by 12:40pm. Both the Engineering and Production toilets were evacuated.
Evacuation officers came to the factory with their SEWAGE EVACUATION LORRY. Started their operation by 11:20am and ended it by 12:40pm. Both the Engineering and Production toilets were evacuated.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
Evacuation officers came to the factory with their SEWAGE EVACUATION LORRY. Started their operation by 11:20am and ended it by 12:40pm. Both the Engineering and Production toilets were evacuated.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as DOC, PDF, TXT or read online from Scribd
REPORT ON SEWAGE EVACUATION OF THE ADMINISTATIVE OFFICE TOILET.
This is to inform you that the Evacuation officers came to the factory with their sewage evacuation lorry around 11:00am, started their operation by 11:20am and ended it by 12:40pm.The evacuation lorry was inspected before operation started and after to check any traces of leakage; obviously no leakages during the operation. Both the Engineering and Production toilets were evacuated.