Earthing Network at Nestle Wartsila plant Project Work Progress Report

Sr. No. Date Project Acitivity QTY Unit

2nd june, 12

REMARKS

Work commencement date (28th March) - 30th April, 12


1 2 28th March, 12 29 March, 12 2nd - 4th April, 12 1 2 5th April, 12 6th April, 12 I I II 3 4 5 7th April, 12 8th April, 12 9th April, 12 I II 6 10th April, 12 I II III 7 11th April, 12 I II III 8 9 12th April, 12 13th April, 12 I II 10 14th April, 12 I Work awarded Caintainer Mobilization Material mobolization 95 mm2 bare conductor laid 95 mm2 bare conductor laid TA / XB / RA cad-weld joints TA / XB / RA cad-weld joints 95 mm2 Y/G cable installed TA / XB / RA cad-weld joints 95 mm2 bare conductor laid 95 mm2 Y/G cable installed TA / XB / RA cad-weld joints 95 mm2 Y/G cable installed 50 mm2 Y/G cable installed TA / XB / RA cad-weld joints 50 mm2 Y/G cable installed TA / XB / RA cad-weld joints 5 2 no work mtr 49 5 11 24 6 10 15 5 mtr Nos. mtr mtr Nos. mtr mtr Nos. no work 132.075 45 15 10 mtr mtr Nos. Nos. Sunday

11 12 13 14 15 16 17 18 19 20 21

15th April, 12 16th April, 12 17th April, 12 18th April, 12 19th April, 12 20th April, 12 21st April, 12 22nd April, 12 23rd April, 12 24th April, 12 25th April, 12 I II III IV I

95 mm2 bare conductor laid burried -

Sunday no work no work no work no work no work no work Sunday no work no work

95 mm2 bare conductor laid 95 mm2 Y/G cable installed TA / XB / RA cad-weld joints Earthing rad (19mm dia 3m long) -

78.7 5 7 2

mtr mtr Nos. Nos. no work no work no work Sunday

22 23 24 25 26

26th April, 12 27th April, 12 28th April, 12 29th April, 12 30th April, 12 I

TA / XB / RA cad-weld joints

Nos.

1st May - 31st May, 12


27 28 29 30 1st May, 12 2nd May, 12 3rd May, 12 4th May, 12 I II III IV 31 5th May, 12 I II III IV V VI 32 33 34 35 36 6th May, 12 7th May, 12 8th May, 12 9th May, 12 10th May, 12 I II 37 11th May, 12 I II III IV V VI PVC conduit 2'' PVC conduit 4'' PVC conduit 6'' PVC socket 6'' PVC bend 2'' PVC bend 4'' PVC bend 6'' PVC End cap 2'' PVC End cap 4'' PVC End cap 6'' 95 mm2 bare conductor laid 95 mm2 Y/G cable installed PVC conduit 2'' PVC socket 2'' PVC bend 2'' PVC End cap 2'' 95 mm2 bare conductor laid 95 mm2 Y/G cable installed 8.225 4 14.2 5 5 5 30 6.4 meter meter meter Nos. Nos. Nos. meter meter 28 5 23 3 5 2 6 5 2 6 meter meter meter Nos. Nos. Nos. Nos. Nos. Nos. Nos. Sunday no work no work no work Labour Day no work no work

38

12th May, 12

VII I II III IV

39 40 41 42

13th May, 12 14th May, 12 15th May, 12 16th May, 12

I II III I II III IV

43 44

17th May, 12 18th May, 12

45 46 47 48 49

19th May, 12 20th May, 12 21st May, 12 22nd May, 12 23rd May, 12

I II III

50 51 52 53 54 55 56 57

24th May, 12 25th May, 12 26th May, 12 27th May, 12 28th May, 12 29th May, 12 30th May, 12 31st May, 12

I II I II I II I II

TA / XB / RA cad-weld joints 95 mm2 bare conductor laid 95 mm2 Y/G cable installed TA / XB / RA cad-weld joints Earthing rad (19mm dia 3m long) 95 mm2 bare conductor laid 50 mm2 Y/G cable installed TA / XB / RA cad-weld joints 95 mm2 bare conductor laid 95 mm2 Y/G cable installed 50 mm2 Y/G cable installed TA / XB / RA cad-weld joints 95 mm2 Y/G cable installed TA / XB / RA cad-weld joints Earthing rad (19mm dia 3m long) 95 mm2 Y/G cable installed TA / XB / RA cad-weld joints 95 mm2 Y/G cable installed TA / XB / RA cad-weld joints 95 mm2 bare conductor laid TA / XB / RA cad-weld joints 95 mm2 bare conductor laid TA / XB / RA cad-weld joints -

7 15 4.3 4 1

Nos. meter meter Nos. Nos. Sunday no work no work

32 6.5 6 6 1 3.5 2

meter meter Nos. no work meter meter meter Nos. no work Sunday no work no work

8 3 1

meter Nos. Nos. no work no work

4 1 4 1 4 1 4 1

meter Nos. meter Nos. meter Nos. meter Nos.

Sunday Sunday

no work no work

Summary
Sr. Items No.
1 2 3 4 7 8 9 10 10a 10b 10c 11 11a 11b 11c 12 12a 12b 12c 13 13a 13b 13c 95mm2 bare conductor layed. 95mm2 Y/G insulated cable 50mm2 Y/G insulated cable TA / XB / RA cad-weld joints Earthing rods Earth bar 1200 x 100 x 10 mm Earth bar 300 x 100 x 10 mm PVC conduit layed. 6 inch. 4 inch. 2inch. PVC conduit socket. 6 inch. 4 inch. 2inch. PVC conduit bend. 6 inch. 4 inch. 2inch. PVC conduit end cap. 6 inch. 4 inch. 2inch.

Unit
m m m Nos. Nos. Nos. Nos. m m m Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos. Nos.

QTY Installed
366 119.7 30 78 4 0 0 23 5 42.2 3 0 5 6 2 10 6 2 10

QTY BOQ
750 1200 120 170 4 1 5 46 12 49 5 2 6 10 3 12 10 3 12

% intalled
48.80 9.98 25.00 45.88 100.00 0.00 0.00 50.00 41.67 86.12 60.00 0.00 83.33 60.00 66.67 83.33 60.00 66.67 83.33

Remarks