Gujarat

Case I: Charges for 5MW at 11KV Industrial Consumer Availing Intra - State Open Access for 1 month SR. NO. Case 1 1 PARTICULARS CHARGES CALCULATION TOTAL (RS) CHARGES FOR 1 MONTH Charges for 5MW at 11KV Industrial consumer Availing Intra-State Open Access for 1 month Total Power Transferred In a Month (Units) 3600000 Transmission Charges (Rs/Mw/Day 603.00 3015.00 Transmission Loss of % in Kind * (in%) 4.09% 123.31 Net Transmission Charges Wheeling Charges (Ps/KWh) 13.48 16176.00 Wheeling Loss of % in kind *(in%) 10.01% 1619.22 Net Wheeling Charges Operating Charges (SLDC Charges) (per day) 2000.00 2000.00 Reactove Energy Charges Drawal of KVARH (Assume 5000 KVARH) 10 500 Cross Subsidy Cahrges (Rs per KWH) 0.51 61200 Additional Surcharge Interconnection Charges Standby Charges Parallel Operation charges Other Charges OA Application Registration Fee OA Agreement Fee (Not Applicable for STOA) 5000.00 5000.00 Net Open Access Charges Total Effective Open Access Charges per Unit (Rs./Unit) (To be applicable to Discom) Case 2: Tariff for Consumer Taking Power from Licensee (5MW at 11KV) 1 2 3 4 5 6 Monthly Consumption Energy charges (Monthly) (Rs per Unit) Demand Charges (Monthly) (KVA per month) (Rs) Subsidy by Governmenet (15% E.D.) Any other Charges (Peak Charges for 8 hours) Total Charges per Month Effective Charges per unit (Rs./Unit) 4.150 2.370 15% 0.750 Total 120000.00 498000.00 284400.00 74700 30000.00 887100.00 7.3925 3600000 14940000 8532000 2241000 900000 26613000.00 7.3925

3138.31

94149.4050

3 4 5 6 7 8 9 10

17795.22 2000.00 500 61200

533856.5280 60000.0000 15000.0000 1836000.0000

5000.00 89633.53

5000.00 2544005.93 0.706668315

You might also like