Power Scenario in Bangladesh

M Ashraful Islam Dept of Mech Engg, BUET aislam@me.buet.ac.bd

October 15, 2008

ME403, MA ISlam

Power Scenario in Bangladesh

October 15, 2008

ME403, MA ISlam

Power Scenario in Bangladesh

Share of Total Primary Energy Supply* in 2005 Bangladesh

24 187 ktoe

October 15, 2008

ME403, MA ISlam

Power Scenario in Bangladesh

October 15, 2008

ME403, MA ISlam

Power Scenario in Bangladesh

October 15, 2008

ME403, MA ISlam

Power Scenario in Bangladesh

October 15, 2008

ME403, MA ISlam

Power Scenario in Bangladesh

October 15, 2008

ME403, MA ISlam

Power Scenario in Bangladesh

October 15, 2008

ME403, MA ISlam

Power Scenario in Bangladesh

October 15, 2008

ME403, MA ISlam

Power Scenario in Bangladesh

October 15, 2008

ME403, MA ISlam

10

Power Scenario in Bangladesh

October 15, 2008

ME403, MA ISlam

11

Power Scenario in Bangladesh

October 15, 2008

ME403, MA ISlam

12

Power Scenario in Bangladesh

West Zone

October 15, 2008

ME403, MA ISlam

13

Power Scenario in Bangladesh

Present Scenario Installed Capacity


BPDB IPP TOTAL 3985 MW 1260 MW 5245 MW 66 UNIT 37 UNIT 103 UNIT

October 15, 2008

ME403, MA ISlam

14

Power Scenario in Bangladesh

History
Electricity utilization in this region (Bangladesh) started in 1901 when a private generator was installed at the residence of the then Nawab of Dhaka. Mr. Bolton, British citizen, switched on the first electricity in Ahsan Monjil on 7 December 1901. Electricity distribution system under private ownership was begum by DEVCO, a subsidiary of Octttavian Steel Company in the 1930s and Dhanmondi power house was setup for commercial distribution of power.

October 15, 2008

ME403, MA ISlam

15

History

Power Scenario in Bangladesh

In the year 1947, power generation and distribution of this part of the country were in the hands of some private companies. The power supply to then 17 provincial districts was within the township in a limited way.The generation voltage was 400 volts. Power used to be supplied to most of the districts during nighttime only. Only exception was Dhaka City where power used to be supplied by two 1500 kW generators and the generation voltage was 6.6 kV and this was the highest supply voltage. There was no long distance transmission lines. In aggregate the generation capacity of the country was 21 MW.
October 15, 2008 ME403, MA ISlam

16

History

Power Scenario in Bangladesh

In 1948, Electricity Directorate was created in order to plan and improve power supply situation. In 1959, Water and Power Development Authority (WAPDA) was created and the power sector really started working satisfactorily. In 1960, Electricity Directorate was merged with WAPDA. The basic philosophy was to give more autonomy to an organization for development of this basic infrastructure.

October 15, 2008

ME403, MA ISlam

17

History

Power Scenario in Bangladesh

At that time (1960) relatively higher capacity plants were built at Siddhirganj, Chittagong and Khulna (highest plant size was only 10 MW Steam Turbine at Siddirganj). At the same time, Kaptai dam was under construction under Irrigation department. Unit size of Kaptai was 40 MW, which for that time was considered to be a large power plant. Side by side construction of Dhaka-Chittagong 132 KV transmission line was in progress. Construction of Kaptai dam and commissioning of Dhaka-Chittagong 132 KV transmission line in the year 1962 may be taken as milestone of power development of this country.
October 15, 2008 ME403, MA ISlam

18

History

Power Scenario in Bangladesh

In 1972, Bangladesh Power Development Board (BPDB) was created to boost the power sector. A different approach and a new model was considered for undertaking a comprehensive scheme. Thus the Government created Rural Electrification Board (REB) in October 1977. Later in 1991 Dhaka Electric Supply Authority (DESA) was created basically to operate and develop distribution system in and around Dhaka (including the metropolitan city) and bring about improvement of customer service, collection of revenue and lessen the administrative burden of BPDB.

October 15, 2008

ME403, MA ISlam

19

Power Scenario in Bangladesh

PRESENT GENERATION CAPABILITY As stated in Daily Generation Report MAXIMUM DEMAND SERVED SO FAR TRANSMISSION LINES (230 KV) TRANSMISSION LINES (132 KV) TRANSMISSION LINES (66 KV) GRID SUB-STATION CAPACITY (230 / 132 KV) GRID SUB-STATION CAPACITY (132/33 KV) DISTRIBUTION LINES (33 KV & BELOW) CONSUMER NUMBER
October 15, 2008 ME403, MA ISlam

4130 MW 734 Route KM 3018 Route KM 167 Route KM 5050 MVA 8259 MVA 46,599 KM 15,18,891

17-09-2007 FY-2006 FY-2006 FY- 2006 FY- 2006 FY-2006 FY-2006 FY-2006
20