CONSTRUCTION QUALITY MANAGEMENT
ASSIGNMENT FOR CONSTRUCTION QUALITY Management
Assignment:You have been selected as a project manager for a prestigious high rise building in Mumbai which will be housing very rich personalities from industry and film world. yoJr company management has asked you to formalize Quality Management System (QN1S) for interior finishes, Plumbing and prevention of rainwater seepage so that the overall quality standard and image of company is raised.
Quality: Dr.Joseph M Juran has defined quality as fitness for use.Quality is viewed as one that requires every member of the organization to provide the next person in the process with an acceptable product or service. This means that everyone is responsible to perform a task in such a manner that the product can be used immediately and in the most efficient manner possible. As per ISO 9000 quality is the totality of feature and characteristics a product or service that bears on its ability to safely stated or implied needs. There is an urgent need for observance of quality in all aspects of construction via quality of materials, quali Documentation Requirement: 4.2.1 General: Contractor India Limited has implemented Quality System as per requirements of ISO 9001-2000, including 1. Quality Manual (QM) 2. Quality System procedures and other procedures 3. Quality Plan (QP) for this project. 4. Work Procedures (Method of Statement) 5. SHE Plan 6. Manufacturing Quality Plan (MQP)
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 1
CONSTRUCTION QUALITY MANAGEMENT
Field Quality Plan Quality plan is prepared for this project as per quality requirement for ensuring conformance to laid down specifications
MANAGEMENT RESPONSIBILITY Managements Commitment: CONTRACTOR management (HO & Site) shall: Be in constant contact with site & encourage site to complete the project as per Clients requirement. Management has been established the quality objectives as per Quality Plan for Site. Conduct management reviews of the site once in three months. Ensure that the resources required for the completion of the project are available on time. ty of workmanship and proper balance in the quality attained vis a vis the quality desired.
STANDARDS AND SPECIFICATIONS FOR MAKING AND TRANSPORTING CONCRETE The quality of construction depends upon right materials used, the correct methods followed and produce end product of acceptable performance. The means of quality control are tests, inspection, supervision and analysis of data etc. Quality tests are conducted in laboratories and inspection & supervision are carried out on the site and the data analysis is done by experts in office. SPECIFICATIONS The project authorities prepare the process of working out specifications of various facilities where concrete will be used. However, the standards and specifications for concrete and its various ingredients are universally standardized and they are required to be in conformity with same. Indian Standards IS for concrete and its basic ingredients viz cement, coarse and fine aggregates, water admixtures and various aspects of concreting its placement and final acceptance should be as per IS specifications. The quality control of concrete comprises of the following four functions:
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 2
CONSTRUCTION QUALITY MANAGEMENT
i. ii. iii. iv. Control of ingredients of concrete viz. cement, coarse and fine aggregates, water and admixtures. Concrete mix proportioning of concrete mix design to attain the required strength specifications. Concrete production and placement operations. Acceptance
The responsibility of all the four functions is shared by contractor, the department or client and the quality control staff. INSPECTION Inspection is the act of physical verification of the subject work on the site and under normal day to day working conditions. The inspection for quality is done by quality control inspectors who are posted at all active sites and who should be persons at deputy engineer and above levels. They are member of the quality control team and unrelated to the production process directly. Once quality standards and other things are laid out inspection becomes a routine matter. Inspection stages are as follow: i. ii. iii. iv. v. vi. vii. viii. ix. x. Material inspection at suppliers end Material inspection at the stage of receipt Material inspection at the stage of issue Inspection of the process at the time of initial setting of machine / equipment Inspection of the trial run batch Inspection while the execution is in progress Inspection of finished process Inspection before erection and commissioning Inspection of commissioning Inspection of machinery and equipment commissioned
CHECKLIST Following items must be checked by Quality control engineer. 1. PRELIMINARY
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 3
CONSTRUCTION QUALITY MANAGEMENT
i. ii. iii. iv. v. Plans and specifications availability at sites Organization chart, job descriptions and work assignments Permissible tolerance of measurements Provisions of records and reports Contractors plant, calibrations, equipment organisation and methods.
2. PROPORTIONING i. ii. iii. iv. v. Tests of aggregates Proportioning of mix Mix computations Grading of mixed aggregates, batch quantities , yield Air content
3. MATERIALS i. ii. iii. iv. v. vi. vii. viii. ix. x. General ( applies to all materials) Identification, quantities ( used on hand ) ,acceptability, uniformity, storage conditions, handling methods, waste, schedule of testing Cement Sampling for laboratory test Protection from dampness Aggregates Acceptability tests Gradation , organic matter, deleterious substances,soundness,resistance to abrasion, other tests Control test Moisture, absorption , specific gravity, unit weight, voids undesirable
4. STOCKPILING i. ii. Water Admixture
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 4
CONSTRUCTION QUALITY MANAGEMENT
iii. iv. v. vi. vii. Reinforcing steel Size, bending, surface condition Accessories Fixtures Other materials
5. BEFORE CONCRETING i. ii. Lines and grades Excavation, foundations location , dimensions, shape, drainage, preparation for surfaces
6. FORMWORK i. ii. iii. iv. v. vi. vii. Specified type of forms Location Alignment , provision for settlement Stability ( bearing ,shores, ties and spaces) Inspection of openings Preparation of surfaces Final clean up
7. GANGWAY AND LADDERS i. ii. iii. iv. Working platforms , location width, guardrails Scaffoldings of adequate strength securely supported, properly braced Suitable guards on all gangway and stairs Ladders securely fixed
8. PLANT AND MACHINERY i. ii. iii. Availability of spare concrete mixers,vibrators and other machines Adequate electric and petromax lamps for concreting at night Adequate quantity of tarpaulin to cover concrete in case of rains
9. BATCHING AND MIXING OF CONCRETE
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 5
CONSTRUCTION QUALITY MANAGEMENT
i. For each batch, check the quantity of coarse aggregate, fine aggregate , cement and water, quantity of water being corrected from the viewpoints of dry wet conditions of the coarse and the fine aggregate Periodical checking of accuracy, serviceable conditions and cleanliness of all the measuring equipments Checking that water / cement ratio is maintained at the stipulated value. Further control over the amount of water used shall be exercised in terms of slump/compaction factor value Physical checking of the quantities of the constituents per batch periodically Checking of workability of concrete at frequent intervals Checking cleanliness of the mixer machine drum Checking the working of the mixer as per the rating of the mixer ,yielding concrete of uniform colour and consistency Checking cleanliness and adequacy of chairs in the area of concreting Checking that concrete is placed and compacted before the expiry of initial setting time of cement and left undisturbed afterwards Checking that concrete is placed in even layers, each layer being compacted before placing the next layer Ensuring that concreting is carried out continuously up to the construction joint Ensuring that while concreting an old work, the surface is chipped, cleaned with wire brush and wetted with a coat of cement slurry, before laying new concrete
ii. iii.
iv. v. vi. vii. viii. ix. x. xi. xii.
10.EMBEDDED PARTS i. ii. iii. iv. Inspection of embedded parts and embedment of lugs Position and level of embedded parts Precautionary measures to keep the embedded parts in position Position , depth and size of bolt holes
11.REINFORCEMENT IN PLACE i. ii. Size (diameter,lenghth,bends and anchorage) Location ( number of bars, minimum clear spacing,mimimum cover)
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 6
CONSTRUCTION QUALITY MANAGEMENT
iii. iv. v. vi. vii. viii. ix. x. xi. xii. xiii. Splicing Stability ( binding by wire, chairs and spacers) Cleanliness ( no loose rust, no oil, paint dried mortar etc) Fixtures ( location, stability, cleanliness) Opening not shown on plans Calibration of batching devices Conditions of mixer, speed of operation Provision for continuous placement Provision for curing Provision for protection against sun,rain,hot or cold weather Adequate tools and men for compaction, finishing and curing
12.CONCRETING i. Working conditions Weather, preparations completed, specified interval since placement, lighting for night work, covering and protection ii. Batching Cement, aggregates, water, admixtures Check batching devices Check yield of concrete iii. Mixing Minimum time, batches delayed in mixer, maximum time, loading, number of revolutions of drum, water used, mixing capacity of drum, amount of concrete iv. Control of consistency a. Observations of concrete being placed,tests,adjustments of water or admixtures in mix b. Monitoring of air content c. Concrete temperature check previous
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 7
CONSTRUCTION QUALITY MANAGEMENT
d. Conveying e. No segregation of materials, no excessive stiffening or drying out, time limits v. Placing uniform and dense concrete Continuous operation, preparation of contact surfaces, mortar bedding, vertical drop, no dropping against forms or reinforcement, little or no flow after depositing, depth of layers, water gain, rock pockets, removal of temporary ties and spacers, disposal of rejected batches, placing concrete under water vi. Contraction joints a. Location b. Forming or tooling c. Dowels of ties (if any ) in place and aligned vii. Construction and hinge joints a. Location, preparation of surfaces b. Dowels or ties (if any) in place and aligned c. Expansion and isolation joints d. Joint filler material,location,alignment,stability,freedom interference with subsequent movement viii. from
Finishing of formed surfaces shallow surfaces, layer of mortar, water gain, no over working first floating, alignment of surface, final hard trowelling, plastic shrinkage cracks Finishing of formed surfaces condition of surfaces upon removal of forms (honeycomb peeling, ragged tie holes, ragged from lines), repair of defects, surface treatment, no surface drying Schedule of testing
ix.
x.
13.AFTER CONCRETING i. ii. iii. Protection from damage impact, overloading of surfaces Time of removal of forms Curing surface continuously moist, time of beginning curing, length of curing period, concreting in cold and hot weather required precautions
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 8
CONSTRUCTION QUALITY MANAGEMENT
iv. v. vi. Joints clean and seal Tests of concrete Records and reports a. Records,materials,mix computations, batching and mixing, placing and curing b. Reports, daily, summary c. Diary d. Photographs, video recording PRESERVATION OF PRODUCT: All the material received at store is preserved at store. Material is accounted and entered in stores ledgers. The care is taken to store the material at appropriate place. They are identified appropriately. Main execution material is preserved as following:Following are the main products being used in the main works. a) Cement* b) Reinforcement* c) Structural Steel * d) Admixture* e) Paint Materials marked with *asterisks at the end are free issue materials. a) Cement: Cement shall be stored in closed godown as per Indian standard practices (IS 4082) and the same cement shall be issued to site as per the requirement. The cement older than six months will be rejected from its use. (i) Cement will be issued on the basis of approved construction drawings allowing for wastage as indicated below: (ii) (iii) Allowable wastage over theoretical consumption - 3% If the Contractor fails to return the surplus materials out of those supplied by the Client or if the wastages of free issue materials are more than the
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 9
CONSTRUCTION QUALITY MANAGEMENT
allowed wastages indicated above, then in addition to any other liability that the Contractor may incur, the Contractor shall pay to the Client rate which he paid including cost of taxes, duties and freights. Cement will be issued on weighment basis. Modus Operandi to be adopted shall be as given below: To arrive at the average weight of each consignment, 10% sample weighment of cement bags as well as bulker, at the time of issue from the stores, shall be done on platform weighing machines. Half of the sample bags may be selected by the Contractor and the other half by Employer. The average net weight of the whole consignment (including sample bags), shall be deemed to be 50 kg. of cement per bag, if the average weight (including the weight of bag) is between 49.0 kg. and 52.0 kg. (both limits included). In case the average weight (including the weight of bag) is "less than 49.0 or more than 52.0 kg., the average weight shall be suitably adjusted for increase and decrease over the prescribed limits of 49.0 kg. and 52.0 kg. respectively and the total weight of all the bags (including of sample bags) in the consignment shall be arrived at in accordance with the average weight arrived at after the adjustment as above. Following tabular examples illustrate the above methodology: Assume a lot of 200 bags. Average weight of sample Range in Kg Average wt. bag Total Issue wt. (for the lot of 200 bags)
bags (incl. wt. of bag) per of bag) 49.0 Kg to 52.0 Kg Less than 49.0 More than 52.0
including weight of cement bag (taken as 500 gm per bag) 49.1 Kg or 51.9 Kg
(excluding wt.
50 Kg.
10,000 Kg.
48.7 Kg. 52.3 Kg.
49.7 Kg. * 50.3 Kg. **
9,940 Kg. 10,060 Kg.
*(49.0 - 48.7 = 0.3)*(52.3 - 52.0 = 0.3)
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 10
CONSTRUCTION QUALITY MANAGEMENT
(50- 0.3=49.7)(50.0 + 0.3 =50.3)
b) Reinforcement Steel: Reinforcement should be stored diameter wise and stacked over the wooden sleepers or pedestals. Tags will be used to identify each diameter of reinforcement. Reinforcement steel shall be issued to the Contractor to its Steel yard by the Client, on the basis of construction drawings issued to the Contractor by the Employer, B ar Bending S chedules prepared by the Contractor & duly approved by Employer allowing for wastage as indicated below. The reinforcement steel shall be issued to the Contractor on the basis of weight, such weights being calculated as follows:i) All reinforcement steel (in coils or straight length) shall be issued on the basis of actual weighment done at Site or in the near vicinity. ii) Alternatively reinforcement steel shall be issued on the basis of
Sectional weight" as per IS: 1752. iii) The actual weighment shall be done on weighing equipment available at the Site or in the near vicinity or, in the event of non-availability of weighing equipment, on the basis of random length/bundle weights as decided by the Project Manager and jointly recorded in a register, on day to day basis or on each indent basis. The reinforcement steel shall be issued to the Contractor in such diameters and lengths which are presently rolled in the country or as may be available in the Site stores of the Employer. iv) Allowable wastage over theoretical consumption- 5.0 %( 1% invisible wastage & 4% returnable scrap (visible wastage), rolling margin shall not be considered). v) Scrap are the pieces of lengths less than 3 m, whose weights shall be determined on the basis of actual weighment. All scrap generated shall be
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 11
CONSTRUCTION QUALITY MANAGEMENT
returned to the Client and shall be considered under allowable wastages vi) If the Contractor fails to return the surplus materials out of those supplied by the Employer or if the wastages of free issue materials are more than the allowed wastages indicated above. The Contractor shall pay to the Client the price paid by the Client including cost of taxes, duties and freights.
vii) Cut pieces are the pieces of lengths 3 m and above. For the cut pieces of lengths 3 m and above, returned credit shall be given for the full quantity to arrive at the Actual issue made to the Contractor. The return of the cut pieces by the Contractor shall be on the basis of weight arrived as in the same manner as for the issue of material at the time of issue c) STRUCTURAL STEEL: Structural Steel shall be issued to the Contractor to its Steel Yard by the Client, on the basis of fabrication drawings/design drawings issued to the Contractor by the Project Manager, allowing for wastage as per provisions elsewhere in this Section of SCC. The structural steel shall be issued to the Contractor on the basis of weight, such weights being calculated as follows Steel plates: i) ii) iii) All steel plates shall be issued on the basis of actual Alternatively steel plates shall be issued on the basis of The actual weighment shall be done on weighing equipment
weighment done, at Site or in the near vicinity. Sectional Weight as per SP: 6 for plates. available at the Site or in the near vicinity or, in the event of non-availability of weighing equipment, on the basis of random length/bundle weights as decided by the Project Manager and jointly recorded in a register, on day to day basis or on each indent basis. Structural Steel (other than plates): All structural steel (other than plates) shall be issued on the basis of the
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 12
CONSTRUCTION QUALITY MANAGEMENT
Sectional Weight" as per SP: 6, irrespective of the section involved. i) The structural steel shall be issued to the Contractor in such sections and length which is presently rolled in the country or as may be available in the site stores of the Employer. ii) In case of issue of those sections for which unit weight is not given in the relevant Indian Standards, the unit weights, as furnished by the Supplier of steel shall, be considered. In absence of any unit weight furnished by the Supplier, a representative unit weight shall be found out at Site by Project Manager by selecting a few samples and actually weighing them. Allowable wastage over theoretical consumption - 5% (1% invisible wastage & 4% returnable scrap (visible wastage), rolling margin shall not be considered). 1. Plates: Pieces of plates less than 1500 sq.cm. in area / less than 10cm in width shall be classified as scrap and stacked separately. Cutting edges / pieces of plates less than 40mm in width / less than 3kg. in weight shall be classified as Rolling/melting scrap. 2. Structural Steel (excluding plates): Pieces of Structural Steel less than
2.0 M in the length shall be classified as scrap and stacked separately. If the Contractor fails to return the surplus materials out of those supplied by the Employer or if the wastages of free issue materials are more than the allowed wastages indicated above, then Client will recover the amount by considering the purchase rate including cost of taxes, duties and freights. Cut Pieces: Plates: Pieces of plates equal or more than 1500 sq.cm. in area with a minimum width of 10 cm shall be termed as cut pieces and stacked separately. The cut pieces of plates returned shall be rectangular in shape.
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 13
CONSTRUCTION QUALITY MANAGEMENT
Structural Steel (excluding plates): Pieces of Structural Steel equal to or more than 2.0 M in length shall be termed as cut pieces and stacked separately. The return of the cut pieces by the Contractor shall be on the basis of weight arrived as in the same manner as for the issue of material at the time of issue. d) e) Admixture: Admixture shall be stored in Closed Godown and same shall be issued to site as per requirement. Paint: Paint shall be stored in closed go down and shall be issued to site as per requirement.
QUALITY ASSURANCE Quality assurance refers to the managerial process which determine the organisations design, objectives and resources, the project team, funding agencies, performance standards and feedback on the projects performance, appropriate actions to deal with deviations and all steps necessary for promoting quality awareness at all levels and in all parts of the project organisation. A typical quality assurance programme addresses itself to the following: i. ii. iii. iv. v. vi. vii. viii. ix. x. xi. Organisation structure of the project team and quality assurance department Responsibilities and powers of the various personnel involved Identification of the coordinating personnel Quality and its programmes Quality education and awareness Quality circles Training Setting up of MIS for quality Resolution of technical differences and disputes Preparation of quality assurance manuals and their checklists Vendor survey procedure
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 14
CONSTRUCTION QUALITY MANAGEMENT
xii. Vendor surveillance procedure
QUALITY ASSURANCE ORGANISATION/ UNIT AT SITE At construction site generally a Quality control engineer is responsible for the quality assurance and quality control. He has mainly four functions as follow: i. ii. iii. iv. Setting up of standards and specifications Evaluating materials, processes and outputs through appropriate tests, inspection etc Appraising failures to these standard and acting when standards are not being adhered to Planning improvements in the standards and specifications.
Quality control engineers functions include the following: i. ii. iii. iv. v. vi. vii. viii. ix. x. Development of specifications Interaction with project designers Reliability and development testing Process capability studies QC of incoming materials Vendor QC and vendor development Quality planning for control of construction process Inspection and testing during construction Interaction with services engineering Records and procedures QC record accumulation procedure Document control procedure In built drawing control procedure Non conformance control procedure
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 15
CONSTRUCTION QUALITY MANAGEMENT
LIST OF METHOD OF STATEMENT / JOB PROCEDURE 1. CIVIL WORK Sl. No. METHOD OF STATEMENT FOR CHIMNEY WORK
01
Method of Statement for Excavation.
02
Method of Statement for PCC.
03
Method of Statement for RCC.
04
Method of Statement for Block Work.
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 16
CONSTRUCTION QUALITY MANAGEMENT
05
Method of Statement for Plastering.
INSPECTION OR CHECKS REQUIRED FOR CONSTRUCTION ACTIVITIES Sl. No. 1 a) b) c) d) Description Type Class Freq. Ref. Doc Annex
Earth Work Nature of Soil / Rock Initial Ground Level Dimension of Excavation Pit Side slopes during Excavation Bed level of Pit Shuttering Dimension, Shape, Alignment, Bracing Level & Height Physical B Each Pour Apr. Drg. Visual Measurement Measurement Measurement B A B B Random 100 % 100 % Random Apr. Drg. Apr. Drg. Apr. Drg. Apr. Drg.
e) 2 a)
Measurement
100 %
Apr. Drg.
b)
Measurement
Each Pour
Apr. Drg.
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 17
CONSTRUCTION QUALITY MANAGEMENT
c) Cleaning & Applying Shutter Oil Reinforcement Bar bending Schedule Measurement A 100 % Apr. Drg. & Check list Apr. Drg. & Check List Measurement B 100 % Check List
3 a)
b)
Cover, Spacing, Spacers, Chairs, Laps
Visual
100 %
REQUEST FOR JOINT INSPECTION
To ---------------------------------------------------------------------------------------The following work is now / will be ready for inspection and for the next stage of work we request you kindly inspect the same for further carrying out the work. 1) Location 2) Ref. Doc. 3) Date & Time Inspection to be done 4) Details of work to Inspected : : : :
A. Further work may continue B. The following modifications are to be carried out and shown to me before start of further work.
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 18
CONSTRUCTION QUALITY MANAGEMENT
Signature of Client Rep. CONTRACTOR Rep.
Signature
of
STANDARD CONSISTENCY OF CEMENT
Trail
Weight of Cement
Water reqd. % by Wt. Of Cement
Amount of Water added
Vicat Reading
1 2 3 4 5 6 7
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 19
CONSTRUCTION QUALITY MANAGEMENT
Standard Consistency Percentage (p%) =
CONTRACTOR
Client
INITIAL & FINAL SETTING TIME OF CEMENT Weight of Cement Taken Amount of water added : :
0.85p by wt. Of cement (p-consistency of cement) Time at which water is added (T1) Time when the needle penetrates the Test block to a depth of 33-35 mm (T2) INITIAL SETTING TIME: Time elapsed for the cement paste to loose Its plasticity (T2-T1) FINAL SETTING TIME Time at which the needle makes an impression On the mould for 0.5mm (T3) Time elapsed for the cement paste to loose Its plasticity completely INITIAL SETTING TIME (Mins) FINAL SETTING TIME (Mins) The Vicat apparatus shall conform to IS 5531 1976 : : : : : :
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 20
CONSTRUCTION QUALITY MANAGEMENT
CONTRACTOR COMPRESSIVE STRENGTH OF CEMENT Standard Consistency (p) Weight of the cement taken Weight of the standard sand taken Water (p/4 + 3.0 %) added by combined wt. Of cement & sand added Compressive strength of cement Of mortar cubes (N/mm) Area of Mortar cube REPORT Date Age of Cube Crushing Load (N) Compressive Strength (N/mm) : 7.06 x 7.06 : : : : :
Client
Average Comp. Strength (N/mm)
3 Days
7 Days
28 Days
3 Days Compressive Strength 7 Days Compressive Strength
: :
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 21
CONSTRUCTION QUALITY MANAGEMENT
28 Days Compressive Strength :
AGGREGATE SIEVE ANALYSIS REPORT SOURCE OF SUPPLY: ___________________ TYPE OF AGGREGATE ________________
WEIGHT OF SAMPLE: ____________KG. DATE OF TESTING ________________ Weight (Kg) Retained Cum. Weight Retained % Retained
IS Sieve size 63 mm 40 mm 25 mm 20 mm 16 mm 12.5 mm 10 mm 4.75 mm 2.36 mm 1.18 mm 600 micron 300 micron 150 micron <150 micron
% Passing
Remarks
CONTRACTOR SPECIFIC GRAVITY OF AGGREGATE
Client
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 22
CONSTRUCTION QUALITY MANAGEMENT
Weight of empty container Weight of container + Aggregate w2 w3 w4 (w2 w1) w1 : : : : :
Weight of container + Aggregate + Water Weight of Container + Water Weight of Aggregate Weight of Equal Volume of Water Specific Gravity w2-w1 (w4 w1) (w3 w2) SPECIFIC GRAVITY
(w4-w1)-w3-w2: :
CONTRACTOR
Client
WATER ABSORPTION OF AGGREGATE
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 23
CONSTRUCTION QUALITY MANAGEMENT
Wet weight of Aggregate (w1 in kg) Weight of empty cylinder (w2 in kg) Weight of cylinder + dry aggregate (w23 in kg) Weight of dry aggregate (w3 w2) kg Water absorption (%) : :
: : :
(w1) (w3-w2) X 100 (w3 w2)
: WATER ABSORPTION :
CONTRACTOR
Client
MOISTURE CONTENT OF AGGREGATE
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 24
CONSTRUCTION QUALITY MANAGEMENT
Weight of the sample taken (w1 in gms) Weight of the sample dried to Saturated surface dry condition (w2 in gms) Moisture Content (M) : w1 w2 X 100 w2 : MOISTURE CONTENT : : :
CONTRACTOR
Client
DENSITY OF AGGREGATE Capacity of the container (lit) :
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 25
CONSTRUCTION QUALITY MANAGEMENT
Net Weight of the aggregate (kg) (material without compaction) Dry rodded bulk density (kg/lit) () : Weight of the aggregate (kg) (material without compaction) Loose bulk density (Kg/lit) : : % of voids : G- x 100 G Where G = Specific gravity of the aggregate = Dry rodded bulk density in (kg/lit) DRY RODDED BULK DENSITY LOOSE BULK DENSITY % OF VOIDS CONTRACTOR TEST FOR CLAY LUMPS IN AGGREGATE Client : : : : :
Weight of the sample taken (w in gms)
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 26
CONSTRUCTION QUALITY MANAGEMENT
Weight of the sample after removing clay lumps (R in gms) : WR L = ----------------- x 100 W :
Where L = Percentage of clay lumps W = Weight of the sample R = Weight of the sample after removing clay lumps
PERCENTAGE OF CALY LUMPS
CONTRACTOR
Client
TEST FOR AGGREGATE IMPACT VALUE
Weight of oven dried sample passing through 12.5 mm sieve and retained on 10.0 mm sieve taken (w1 in gms) :
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 27
CONSTRUCTION QUALITY MANAGEMENT
Weight of fraction passing 2.36 mm IS sieve After 15 blows of free fall by 14 kg. Hammer From a height of 380 mm (w2 in gms) :
Aggregate impact value
w2 ------------ x 100 w1
: AGGREGATE IMPACT VALUE :
CONTRACTOR
Client
AGGREGATE ABRASION VALUE
Weight of oven dried sample taken As per grading (w1 in gms) After rotation in Los Angeles abrasion : :
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 28
CONSTRUCTION QUALITY MANAGEMENT
Testing machine, Wt. Of material coarser Than 1.7 mm IS Sieve (w2 in gms)
Percentage of wear
w1 - w2 ---------------- x 100 w1 :
PERCENTAGE OF WEAR
CONTRACTOR
Client
AGGREGATE CRUSHING VALUE
Total weight of the material taken (w1 in gms): (Material in a surface dry condition, passing through 12.5 mm sieve and retained on
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 29
CONSTRUCTION QUALITY MANAGEMENT
10.0 mm sieve taken) Weight of fraction passing through 2.36 mm IS sieve (w2 in gms) :
(After the application of load to 40 T @ 4T per minute)
Aggregate crushing value
w2 ------------ x 100 w1 :
AGGREGATE CRUSHING VALUE
CONTRACTOR
Client
FINENESS VALUE OF FINE AGGREGATE
Cumulative % of wt. of material Fineness modulus of sand : Retained from sieve analysis 100
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 30
CONSTRUCTION QUALITY MANAGEMENT
: : : FINENESS MODULUS OF SAND : _______________ =
CONTRACTOR
Client
BULKING OF SAND
Level of moist fine aggregate (h1 in cms) In measuring cylinder
Saturated sand level
(h2 in cms)
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 31
CONSTRUCTION QUALITY MANAGEMENT
In measuring cylinder
% of bulking
h1 h2 ------------------ x 100 h2
: :
PERCENTAGE OF BULKAGE
CONTRACTOR
Client
CHECK LIST FOR EXCAVATION Description Yes / No Remarks
Sl. No 1 2 3
Approval of Drawings Layout of Excavation Initial Level check
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 32
CONSTRUCTION QUALITY MANAGEMENT
4 5 7 8 9 10 Man Power Machine power / Capacity Disposal Area Transportation Final Level Check Record for Following c) Type of Soil 11 12 Safety Measures Quality Plan of Project
CONTRACTOR
Client
CONCRETE POUR CARD NAME OF WORK: NAME OF STRUCTURE DRAWING NO. DATE LOCATION Sl. No A 1 BEFORE POUR Center lines Check List CONCREGE GRADE CEMENT CONTENT SLUMP QUANTITY CEMENT CONSUMPTION Result of Checks CONTRACTOR Check Sign JSW Check Sign Remarks
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 33
CONSTRUCTION QUALITY MANAGEMENT
2 Accuracy, Strength & Finish of Form work & Staging 3 4 5 6 7 8 9 10 11 12 B 13 14 15 Placement of Rebars Cover to Rebars Location of Construction Joints Soffit / Pour Levels Position of Embedments Adequacy of Materials Adequacy of Mixers Adequacy of Test Cube Moulds Adequacy of Vibrator Adequacy of Illumination AFTER SHUTTERING REMOVAL Level lines of Soffit Honey Combs / Cracks Adequacy of Curing
Note: Each item shall be checked and initialed by concerned personnel, each pour shall have separate pour card in triplicate for distribution to Client (Site office and planning) and for Office Copy, Any deviation in any aspect shall be recorded in Remarks column CONTRACTOR Client
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 34
CONSTRUCTION QUALITY MANAGEMENT
PLAN FOR INSPECTION TESTING OF INCOMING RAW MATERIAL Clas s/ Res pon sibili ty A1
Sl. No
Materi al
Characteristics to be tested & inspected
Test Method
Ref. No.
Lot
Sam plin g Size
Frequency
Reco rd / Anne x.
Reinforce ment Steel
Tolerance of Diameter
Physical
IS 1852 IS 1786
@ Truck
Cracks, Flaws, Foreign Material
Visual
IS 1852 IS 1786
@ Truck
A1
Composition & Properties
Chemical & Physical
IS 1852 IS 1786
@ Consignment
A1
Cement
Fineness, Sp. Gr., Physical Density Initial & Final set times Consistency, Comp.
IS 4112
@ Consignment / Batch
A1
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 35
CONSTRUCTION QUALITY MANAGEMENT
Strength 3 Aggregat e Sieve analysis, Sp. Gr. Density, Moisture Content, Abrasion & Impact Values, Flakiness, Bulkage Physical IS 383 Per 300 Cum A1
CONTRACTOR
Client
CEMENT INSPECTION REPORT Sl. No. 1 Delivery Weight 2 3 4 5 Arrival Date on Site Truck License Plate Initial & Final Set Standard Consistency @ Truck @ Truck @ 2 months @ 2 months Voucher @ Truck Description Frequency Checked Remarks
(Manufacturing name, Grade,
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 36
CONSTRUCTION QUALITY MANAGEMENT
6 Compressive Strength # 7 days & 28 days @ Each Batch / 2 Months
CONTRACTOR
Client
INCOMING AGGREGATE INSPECTION REPORT
Sl. No. 1
Description
Frequency
Checked
Remarks
Delivery Voucher (Source, Size, Quantity)
@ Truck
2 3 4 5
Arrival Date on Site Truck License Plate Size & Grading Cleanliness
@ Truck @ Truck @ Fortnightly @ Fortnightly
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 37
CONSTRUCTION QUALITY MANAGEMENT
CONTRACTOR
Client
INCOMING STEEL INSPECTION REPORT
Sl. No. 1
Description
Frequency
Checked
Remarks
Delivery (Manufacturer, Quantity)
Voucher Diameter,
@ Truck
2 3 4
Arrival Date on Site Truck License Plate Visual Checks (Cracks,
@ Truck @ Truck @ Truck
Scales, Foreign Material) 5 Sample for Tests @ Consignment
For physical & chemical tests samples shall be sent to external testing laboratory.
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 38
CONSTRUCTION QUALITY MANAGEMENT
CONTRACTOR
Client
EXCAVATION REGISTER Dimensions Sl. No. Date Location Volume of Length Breadth Depth Excavatio n Remark s
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 39
CONSTRUCTION QUALITY MANAGEMENT
CONTRACTOR Client
CONCRETE REGISTER
Sl. N o Date Location
Con. Grade of Concrete Cement Kg/Cum Qty (Cum )
Cement Consumption Theoretical (bags) Actual (bags)
No. of Cubes Taken Remarks
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 40
CONSTRUCTION QUALITY MANAGEMENT
CONTRACTOR
Client
CUBE TESTING RESULTS
Compressive Strength
Re Sign mar ks C
Date of Casti ng Locati on
Grade of Concre te
Cub e Mar k
Date of Testi ng
Age of Cub e
Place of Testi ng
Wt. Of Cub e Dial Readi ng N/ mm
2
O N Ave. Stren gth T R A CT O R SC
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 41
CONSTRUCTION QUALITY MANAGEMENT
CONTRACTOR
Client
NAME OF WORK : NAME OF STRUCTURE LOCATION DRAWING NO. DATE CEMENT CONSUMPTION STARTING TIME COMPLETION TIME
CONCREGE GRADE MIX PROPORTION WITH W/C RATIO CEMENT CONTENT ADMISTURE APPROVED SLUMP QUANTITY NO. OF CUBES IDENTIFICATION RATE OF POUR &
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 42
CONSTRUCTION QUALITY MANAGEMENT
Results of Check CONTRACT Sl. No Check List OR Check A 1 2 BEFORE POUR Center lines Accuracy, Strength & Finish of Form work & Staging 3 4 5 6 7 8 9 10 11 12 Placement of Rebars Cover to Rebars Location of Construction Joints Soffit / Pour Levels Position of Embedments Adequacy of Materials Adequacy of Mixers Adequacy of Test Cube Moulds Adequacy of Vibrator Adequacy of Illumination Sig n Client Check Sig n Remarks
CONTRACTOR
Client
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 43
CONSTRUCTION QUALITY MANAGEMENT
CUBE TESTING RESULTS Compressive Strength Age of Cube Wt. Of Cube Dial Readin g Comp. Streng th N / mm2 Ave. Strength
Contract orDate of Casting Cube Mark
Date of Testi ng
CONTRACTOR BIBLIOGRAPHY / REFERENCE 1. Construction Quality Management, Published by NICMAR ,2008
Client
2. Total Quality Management by Parag Diwan,Published by Golden Books Centre Sdn.Bhd.Kuala lampur,1999
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 44
CONSTRUCTION QUALITY MANAGEMENT
ASSIGNMENT ON CONSTRUCTION QUALITY MANAGEMENT
Page 45