You are on page 1of 4

201112

11

22

Phelps Architecture,
33
44
55
66
77
1
2
Construction,
and
Engineering

1 1 2 2 3 3 4 4 5 5 6 6 KK
7 7 8 8 9 9101011111212AA

-
www.
dcps.dc.gov/profiles

1 2 3 4 5 6 K
7 8 9 10 11 12 A

AP English
Art Club
Robotics Class/Team
AP US History
AP Art
Greenhouse/Horticulture Club
Creative Writing Club
Academic Competitions: History,
Science, FIRST Robotics, Cyber
Forensics, SkillsUSA
Debate Team
Drama Club

Girls Lacrosse
Girls Cheerleading
Boys and Girls Basketball
Girls Volleyball
Boys and Girls Cross-Country
Boys and Girls Indoor/Outdoor
Track
Boys and Girls Soccer
Boys Baseball
Girls Softball

LEED Team
Cyber Forensics Team
Shakespeare Scholars Club
Orchestra/Band
Dance/Modeling Club
Art Club
"Sophisticated Gents"
Readers to Leaders
High Tea Society
Phelps Geek Squad

This school does not have an improvement status under No Child Left Behind (NCLB).

(201011)
Kaya Henderson

9-11

(201112)

704 26th St NE, Washington, DC 20002


(202) 729-4360 | (202) 442-8438
Michael Johnson | michael.johnson4@dc.gov
www.dcps.dc.gov/DCPS/phelps
8:45 a.m. 3:15 p.m.

MM

8 5

Enrollment:
n
n
n
n
n
n
n

300

: 92%
/: 4%
: 0%
: 2%

/: 0%
/: 0%
: 2%

: 3%
: 70%
: 8%
: N/A

2 0111 2

Phelps Architecture, Construction, and Engineering High School

100

2010
2011

43%
53%
46%

2010
2011

47%

44%

2010
2011

8%
6%
12%

2010
2011

8%
10%

District of Columbias Comprehensive Assessment System


(DC CAS) - (DC CAS Alt)

62%

13%

2011
2010

2009
2010

2010
2011

2012
9

N/A

20112010

2009
2010

Advanced
Placement

2010 N/A
2011
9%

Advanced Placement345

30%
80

2009
2011

0100

81
80

2010 N/A
2011

88%

83%

(IMPACT) ,

100

2010
2011

83%
59%
56%

2010
2011

910

49%
48%

46%

2010
2011

51%

70
70
65%

51%

2 0111 2

Phelps Architecture, Construction, and Engineering High School

2010
2011

96%
94%

2009
2011

83
65

2010 3%
2011 0%
2010 0
2011 0

1005 (Tier 5)

11

4%

0100

73

90%

2010
2011

82%
81%

2009
2011

100
74

2009
2011 N/A

88

0100

73

0
Foreign language
enrollment

2010
2011

Individualized Education
Plan timeliness

2010
2011

0
100

66
68

94%

100

100
94%

The percentage of students enrolled in one or more foreign language courses.

99%

100%
100%

The percentage of special education students whose Individualized Education Plan (IEP)
meetings were held on-time.

2 0111 2

Phelps Architecture, Construction, and Engineering High School

Associated General Contractors


of Metropolitan DC

K
A

American Institute of Architects


of DC

Architecture & Design


Carpentry
Electrical

Architect of the Capitol

Engineering (PLTW)

Truland Systems Corporation

Heating, Ventilation, AC

Cisco

Cisco Networking

Ameresco

Plumbing

Grainger

Welding and Sheet Metal

5
6

Turner Construction

Office of Naval Research

National Highway Traffic Safety


Administration

Title I

S41M
(Spingarn High School Line)
X1, X3 (Benning Road-Potomac Park Line)
X2 (Benning Road-H Street Line)
X8 (Maryland Ave Line)

www.dcps.dc.gov/
DCPS/volunteer.

www.dcps.dc.gov/profiles.

-
201110172012262012
514

www.dcps.dc.gov/DCPS/studentsuccess.

www.
dcps.dc.gov regularly,
www.dcps.dc.gov/DCPS/enews

You might also like