No 1 Application Complete in all respect Form -Signed by Competent Authority -Installed capacity indicated -IS No. and variety clearly indicated -Details of previous licence( if ex- licensee) indicated 2 Self Evaluation- Complete in all respect cum-Verification Report 3 Verification By Chartered Engineers Report -Qualification and discipline of CE satisfactory -Verification complete in all respects -Is recommendation satisfactory 4 Contact Report Contact Reports ( if any ) Enclose contact reports for all the visits 5 Test Reports - Tested for all requirements - Details of parameters not tested ( if any )
- Passes in all requirements
- Passes in the requirements of raw materials ( if applicable) 6 Authorised Authority Letter, if application form Person & other documents are not signed by member of the management of applicant (Proprietor/ Partner/Director) 7 Status of Unit Manufacturing status is clearly SSI Certificate/Chartered stated as large/small scale in order to Accountant/ Certificate give concession in marking fee. from or any other agency. 8 STI Acceptance of STI is for the latest To be collected during BIS version visit also 9 Marking Fee Acceptance of latest marking fee To be collected during BIS with complete details (i.e. not signed visit also on blank proforma 10 Brand Name(s) Declaration of Brand Names/Trade Copies of agreements with Marks owners of Regd. Brands/ trade marks to be submitted for each brand. 11 Manufacturing Availability of complete facilities manufacturing facilities 12 Testing facilities Availability of complete testing facilities 13 Calibration of Copies of calibration certificates for instruments all instruments from NABL accredited laboratories/manufactures 14 Quality Control Competence of Q.C personnel is Enclose firm’s declaration Personnel clearly reported in the Verification regarding availability of Report and/or subsequent reports regular full-time testing personnel 15 Consent Letter Firm’s request for permitting OSL Enclose firm’s request, for testing in testing to be considered only for consent letter from OSL and Outside Lab tests having frequencies Monthly & permission of the C.A. above 16 Raw material Details of raw materials, test Enclose Test Certificates of certificates, etc. raw materials 17 Manufacturing Should consist from raw material to Process despatch point 18 Process flow Intermediate control points clearly chart indicated 19 Lay out plan of Location of laboratory clearly factory indicated in lay out plan 20 Proformae Proformae of all the records for raw Enclose copies of proformae maintained by material, production , testing etc. the firm maintained by the firm 21 Declarations - Declaration regarding availability of Enclose declarations which adequate power and water are applicable - Declaration regarding shifting of plant and machinery - Declaration regarding manufacturing of sample in firm’s premises - Other declarations
22 Inspection Details of inspection Charges for all
Charges the visits paid to the firm
23 Testing Charges Details of testing charges if samples