PROPOSED BILL OF QUANTTY FOR A THREE BEDROOM FLAT s/m Description SUBSTRUCTURE PLANT Allow for bringing to site

and removing from site all plants requires for this section of work Qty unit Rate Amount

EARTH WORK Excavate trench for foundation to receive concrete footing and column base Level and compacting of bottom of foundation Apply deildrex Anti termite treatment to side and bottom Backfilled side of excavation with excavated material Imported Laterite filling to make up bed for concrete 300mm thick Broken block hardcore filling 150mm thick 73 73 M3 M2 550 150 40,150 10,950

286 37 9 127

M2 M3 M3 M2

60 110 120 550

17,160 4,070 1,080 69,850

To colection

CONCRETE WORK Plain in-situ concrete in foundation (1:3:6) in foundation Reinforced concrete in foundation (1:2:4) in foundation Column base column beam plain in-situ concrete bed (1:2:4) 150mm thick Reinforcement 6mm diameter 12mm diameter

17

M3

7,500

127,000

2 1 6 24

M3 M3 M3 M3

8,000 8,000 8,000 8,000

16,000 8,000 480,000 192,000

115 95

kg kg

2000 600

BLOCK WORK Vibrated sandcrete hallow block work 230mm in foundation Sawn formwork to side of concrete 155 174 M2 M 1,700 300 263,500

To collection B To collection A To summary

SUPERSTRUCTURE CONCRETE WORK Reinforce in-situ concrete in Column Lintel Head course Reinforcement 6mm diameter 12mm diameter BLOCK WORK Vibrated sandcrete hallow block work 230mm in foundation Sawn formwork to side of concrete To summary ROOFING SHEET Use Long span aluminium roofing Roofing sheet Ridge cover Eave angle Gutter valley Gutter flashing To summary 257 55 57 19 10 M2 M M M M 1,800 900 900 1,200 800 462,600 49,500 51,300 22,800 8,000 265 400 M2 M 1,700 300 450,000 330 280 kg kg 200 140 2 6 3 M3 M3 M3 8,000 8,000 8,000 16,000 480,000 24,000

CARPENTRY AND JOINERY 50 x 150mm timber 50 x 100mm timber 50 x 75mm timber 50 x 50mm timber Ceiling material Plaster of Paris (POP) ceiling Wooden ceiling WARDRIBES Provide the sum of N80,000.00 for the supply and fixing of polished mansonia ply wood finished kitchen cabinet complete with all necessary accessories and kitchen fittings Allow the provisional sum of N130,000.00 for supply and fixing of polished mansonia Ply wood finished wardrobe with hinge door complete with all necessaries accessories (4nos) 58 M2 M2 2,800 1,650 58 144 76 190 M M M M 550 480 350 240

sum

80,000

sum

100,000

To summary

METAL WORK Supply and fix the following aluminium white coated casement window frame with top fixed light and tinted sheet glass complete with lugs plugged to head, cill or jamb in concrete or block pointed in neat cement include sliding insect proofing panel on a third tract Window size 1200 x 1500mm Window size 600 x 600mm Window size 1200x1200 Supply and installed single leaf single swing special door 900 x 2100mm Ditto single leaf single swing American steel doors 2100x1200 BURGLARY PROOF Allow the sum of N70, 000.00 for the supply and fixing of 16mm diameter smooth wrought iron burglary welded in pattern executed complete. 2 3 8 nos nos 18,00 6,000 15,000

8 1

nos nos

9,000 25,000

sum

70,000

To summary

SERVICES Low wash down w.c suite complete with color glass pan and p-trap plastic seat and cover nine litres cistern with all value and fittings. 2 550 x 400mm color glass hand basin with 18mm hot and cool water pillar taps and plug, waste overflow connected to 40mm bottle trap Color stainless steel bath complete. 700 x 700 x 150mm deep shower tray complete with all fittings Electric water heater 50 litres capacity Toilet roll holder 150 long screwed to wall Towel rail 600mm long screwed to wall Stainless steel kitchen sink single bowl single drainer plugged to block. PIPE WORKS Allow the sum of N80,000.00 for fixing all the pipe work in connection with plumbing installation nos 17,500

2 2 2 2 2 2 1

nos nos nos nos nos nos nos

16,000 28,000 7,500 20,000 1,200 2,200 6,500

sum

80,000

To summary

ELECTRICAL WORK Allow the sum of 150,000.00 for the supply and fixing of electrical pipe work, fittings and builder work in connection with electrical instillation executed complete FINISHING 300 x 300 unglazed vitrify ceramic floor tiles laid on screeded bed (measure separately) pointed in cement mortar. 75mm high skirting ditto Granite floor finish lay on screeded bed (measure separately) pointed in cement mortar. 75mm high skirting ditto Cement and sand (1:4) screeded bed average 40mm thick to receive ceramic and granite floor finish (measure separately) Wall finished Internal and external Cement and sand (1:4) rendering fair and smooth 25mm thick on wall for Surface 150 to300mm thick M2 M 350 200

sum

150,000

127

M2 M

3,000 600

381,000

M2 M

7,500 900

M2

550

To collection

25mm thick special rendering/dressing to form window hood Color ceramic wall tiles jointed and painted in cement to wall 18mm thick cement and sand screeded backing to receive wall tile PAINTING AND DECORATION Prepare and apply 2 coats of texcote paint on:

22

M2

250

123

M2

2,800

400 Wall externally 78 Surface 150 to 300mm wide Prepare and apply 3 coats of emulsion paint on: 206 Wall internally 66 Surface 150 to 300mm wide Prepare and apply 2 coats gloss paint on: 55 Fascia board not exceeding 350mm girth Spray painting to soffit of external ceiling with gloss paint To collection B To collection A To summary

M2 M

650 140

M2 M

450 140

M M2

290 400

SUMMARY EARTH WORK SUPERSTRUCTURE ROOFING CARPENTRY AND JOINARY METAL WORK SERVICES ELECTRICAL WORK FINISHING TOTAL ADD 10% GRAND TOTAL