0% found this document useful (0 votes)
114 views7 pages

Production Efficiency Report

This document summarizes production details for a skirt over multiple dates: - The production target is 10,000 skirts by April 30th with an initial efficiency of 40% for sewing on the first day. - Quality inspection is done using AQL 1.0 with pre-final inspection occurring after 80% of skirts are packed. - Daily and cumulative production numbers are provided for each process (cutting, sewing, etc.) along with remaining balance to hit the target. The target is achieved by April 25th with 80 skirts completed ahead of schedule.

Uploaded by

Afif A. Luqmana
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
114 views7 pages

Production Efficiency Report

This document summarizes production details for a skirt over multiple dates: - The production target is 10,000 skirts by April 30th with an initial efficiency of 40% for sewing on the first day. - Quality inspection is done using AQL 1.0 with pre-final inspection occurring after 80% of skirts are packed. - Daily and cumulative production numbers are provided for each process (cutting, sewing, etc.) along with remaining balance to hit the target. The target is achieved by April 25th with 80 skirts completed ahead of schedule.

Uploaded by

Afif A. Luqmana
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd

Style :

SMV :
Target/day/line :
Manpower :

Process
Cutting
Sewing

Skirt
61.81
466
60 operators/line

25-Mar-13
26-Mar-13
TODAY
TODATE
BALANCE TODAY
TODATE
BALANCE
3334
3334
6666
3334
6668
3332

line 1
line 2
Washing
Finishing
Packing
Pre Final Inspection
Final Inspection
Shipping

The efficiency for sewing line in first day : 40%


The inspection is based on AQL 1.0
Pre Final Inspection is done after 80% packed

27-Mar-13
TODAY
TODATE
BALANCE
3332
10000
0

TODAY

186
186
373

10-Apr-13
TO DATE BALANCE

186
186
373

4814
4814
9627

TODAY

466
466
932

11-Apr-13
TO DATE BALANCE

652
652
1305

4348
4348
8695

Production R

TODAY

466
466
932

12-Apr-13
TO DATE BALANCE

1118
1118
2237

3882
3882
7763

TODAY

466
466
932
1000

15-Apr-13
TO DATE BALANCE

1584
1584
3169
1000

3416
3416
6831
9000

TODAY

466
466
932
1000

16-Apr-13
TO DATE BALANCE

2050
2050
4101
2000

2950
2950
5899
8000

Production Report

DATE
TODAY

466
466
932
1000

17-Apr-13
TO DATE BALANCE

2516
2516
5033
3000

2484
2484
4967
7000

TODAY

466
466
932
1000
1429

18-Apr-13
TO DATE BALANCE

2982
2982
5965
4000
1429

2018
2018
4035
6000
8571

TODAY

466
466
932
1000
1429

19-Apr-13
TO DATE BALANCE

3448
3448
6897
5000
2858

1552
1552
3103
5000
7142

TODAY

466
466
932
1000
1429

22-Apr-13
TO DATE BALANCE

3914
3914
7829
6000
4287

1086
1086
2171
4000
5713

TODAY

466
466
932
1000
1429

23-Apr-13
TO DATE BALANCE

4380
4380
8761
7000
5716

620
620
1239
3000
4284

TODAY

466
466
932
1000
1429

24-Apr-13
TO DATE BALANCE

4846
4846
9693
8000
7145

154
154
307
2000
2855

TODAY

154
154
307
1000
1429

25-Apr-13
TO DATE BALANCE

5000
5000
10000
9000
8574
80

0
0
0
1000
1426

TODAY

1000
1426

26-Apr-13
TO DATE BALANCE

10000
10000

TODAY

29-Apr-13
TO DATE BALANCE

0
0
80

TODAY

30-Apr-13
TODATE BALANCE

10000