WATER STANDPIPE MONITORING READING

WSP 1

Project : Alert Level : ± 3.0 m


C0 3 Work Suspension Level: ± 6.0m

Installation Depth : 6m

Date Elapsed Ground Pipe Top Measured GWT Current change Cumulative Remarks
No Monitored Time Level Level Reading of GWT of GWT
(D/M/Y) (Days) (RL m) (RL m) (m) (RL m) (m) Change (m)
1 20/12/2008 320.500 320.900 4.00 316.900 Initial
2 27/12/2008 7 320.500 320.900 3.92 316.980 0.08 0.08
3 03/01/2009 14 320.500 320.900 3.95 316.950 -0.03 0.05
4 06/01/2009 17 320.500 320.900 4.01 316.890 -0.06 -0.01
5 13/01/2009 24 320.500 320.900 4.07 316.830 -0.06 -0.07
6 20/01/2009 31 320.500 320.900 4.13 316.770 -0.06 -0.13
7 03/02/2009 45 320.500 320.900 4.35 316.550 -0.22 -0.35
8 10/02/2009 52 320.500 320.900 3.40 317.500 0.95 0.60
9 17/02/2009 59 320.500 320.900 3.38 317.520 0.02 0.62
10 24/02/2009 66 320.500 320.900 4.25 316.650 0.87
-0.87 0.25
-0.25
11 03/03/2009 73 320.500 320.900 4.60 316.300 -0.35 -0.60
12 10/03/2009 80 320.500 320.900 3.95 316.950 0.65 0.05
13 17/03/2009 87 320.500 320.900 3.98 316.920 -0.03 0.02
14 25/03/2009 95 320.500 320.900 4.03 316.870 -0.05 -0.03
15 31/03/2009 101 320.500 320.900 4.03 316.870 NIL -0.03
16 07/04/2009 108 320.500 320.900 3.90 317.000 0.13 0.10
17 14/04/2009 115 320.500 320.900 4.10 316.800 -0.20 -0.10
18 21/04/2009 122 320.500 320.900 4.10 316.800 NIL -0.10
19 28/04/2009 129 320.500 320.900 4.20 316.700 -0.10 -0.20
20 05/05/2009 136 320.500 320.900 4.10 316.800 0.10 -0.10
21 12/05/2009 143 320.500 320.900 4.08 316.820 0.02 -0.08
22 13/05/2009 144 320.500 320.900 4.12 316.780 -0.04 -0.12

Ground Level GWT Pipe Top Level (Datum)

324.00

322.00
Ground Water Table ( RL m)

320.00

318.00

316.00

314.00

312.00

310.00
0
10
20
30
40
50
60
70
80
90
100
110
120
130
140
150
160
170
180
190
200
210
220
230
240
250
260
270
280
290
300
310
320
330
340
350
360
370
380
390
400
410
420
430
440
450
460
470
480

Elapsed Time (day)


INCLINOMETER READING
I-1

Project :
C0 3 Alert Level : ± 50 mm
Work Suspension Level: ± 70 mm

Date Monitored 13/01/09 20/01/09 03/02/09 10/02/09 17/02/09 24/02/09 03/03/09 Remarks
Max.movement (mm) -12.92mm 1.72mm -12.10mm 2.14mm -11.24mm 2.92mm -16.24mm 3.04mm -12.46mm 2.44mm -10.96mm 2.86mm -9.26mm 2.88mm
Depth of Max.Move(m) 1.0m Dep 15.0m Dep 1.0m Dep 15.0m Dep 1.0m Dep 1.0m Dep 1.0m Dep 1.0m Dep 1.0m Dep 15.0m Dep 1.0m Dep 3.0m Dep 1.0m Dep 15.0m Dep

DEPTH A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180
(m) A B A B A B A B A B A B A B
0
1 -12.92 0.88 -12.10 1.48 -11.24 2.92 -16.24 3.04 -12.46 1.52 -10.96 2.26 -9.26 2.16
2 -12.04 0.70 -11.22 1.42 -10.36 2.54 -12.52 2.06 -11.86 1.76 -10.52 2.26 -8.96 2.12
3 -11.48 1.06 -10.80 1.72 -9.90 2.74 -12.26 2.52 -11.86 2.14 -10.72 2.86 -9.24 2.80
4 -10.64 1.04 -10.00 1.60 -9.16 2.38 -11.24 1.56 -10.70 1.22 -9.66 1.76 -8.22 1.72
5 -9.88 0.68 -9.38 1.14 -8.56 2.00 -10.60 0.78 -10.18 0.62 -9.24 0.96 -7.90 0.86
6 -8.70 0.96 -8.16 1.20 -7.66 1.94 -9.06 1.08 -8.74 1.08 -7.84 1.44 -6.52 1.58
7 -7.96 0.74 -7.56 0.94 -7.08 1.60 -8.66 0.58 -8.46 0.56 -7.70 0.88 -6.56 1.06
8 -6.38 0.58 -5.98 0.88 -5.74 1.38 -6.74 0.74 -6.54 0.86 -5.82 1.16 -4.72 1.40
9 -6.08 0.54 -5.74 0.66 -5.40 1.22 -6.60 0.58 -6.46 0.92 -5.86 1.22 -4.88 1.24
10 -5.56 0.54 -5.28 0.56 -4.92 1.14 -6.10 0.82 -6.00 0.84 -5.48 1.14 -4.58 1.26
11 -4.90 0.54 -4.68 0.54 -4.38 1.12 -5.38 0.58 -5.32 0.44 -4.94 0.80 -4.14 0.78
12 -3.68 0.92 -3.52 0.86 -3.32 1.50 -3.82 0.96 -3.70 0.92 -3.36 1.28 -2.58 1.28
13 -2.90 0.68 -2.84 0.68 -2.60 1.04 -3.04 0.76 -3.02 0.64 -2.80 1.04 -2.08 1.00
14 -1.44 1.44 -1.38 1.72 -1.44 1.68 -1.32 1.86 -1.22 1.76 -1.08 2.26 -0.40 2.22
15 0.92 1.72 1.24 2.14 0.42 1.62 2.00 2.40 2.30 2.44 2.58 2.74 3.18 2.88
16 0.58 0.68 0.78 0.98 0.32 0.66 1.14 1.10 1.26 1.08 1.38 1.16 1.66 1.30
INCLINOMETER READING
I-1

Project :
C0 3 Alert Level : ± 50 mm
Work Suspension Level: ± 70 mm

Date Monitored 10/03/09 17/03/09 23/03/09 31/03/09 07/04/09 14/04/09 21/04/09 Remarks
Max.movement (mm) -10.52mm 2.86mm -10.50mm 2.94mm -10.26mm 3.22mm -11.24mm 2.94mm -10.50mm 3.20mm -9.62mm 3.24mm -9.00mm 3.52mm
Depth of Max.Move(m) 1.0m Dep 15.0m Dep 1.0m Dep 15.0m Dep 1.0m Dep 15.0m Dep 1.0m Dep 15.0m Dep 1.0m Dep 15.0m Dep 1.0m Dep 15.0m Dep 3.0m Dep 15.0m Dep

DEPTH A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180
(m) A B A B A B A B A B A B A B
0
1 -10.52 0.28 -10.50 0.62 -10.26 0.42 -11.24 1.74 -10.50 0.72 -9.62 -1.22 -8.76 2.52
2 -10.16 0.06 -10.10 0.78 -9.62 0.68 -10.72 1.62 -10.06 0.90 -9.38 -1.20 -8.66 2.42
3 -10.40 0.96 -10.22 1.62 -9.88 1.52 -10.74 2.44 -10.20 1.76 -9.62 0.02 -9.00 2.94
4 -9.38 0.22 -9.08 0.96 -8.84 0.96 -9.54 1.74 -9.12 1.24 -8.54 -0.08 -8.10 2.24
5 -9.14 -0.28 -8.84 0.28 -8.74 0.40 -9.26 1.18 -8.88 0.90 -8.38 -0.80 -8.00 1.62
6 -7.24 0.42 -6.74 0.72 -6.74 0.94 -7.24 1.58 -6.80 1.44 -6.38 -0.44 -6.14 2.08
7 -7.22 -0.02 -6.74 0.12 -6.74 0.46 -7.34 0.94 -6.90 0.84 -6.60 -1.34 -6.52 1.20
8 -5.22 0.46 -4.68 0.60 -4.72 0.86 -5.20 1.32 -4.90 1.34 -4.56 -0.44 -4.48 1.54
9 -5.44 0.52 -4.98 0.48 -4.98 0.96 -5.48 1.28 -5.14 1.58 -4.86 0.02 -4.78 1.22
10 -5.16 0.70 -4.74 0.52 -4.66 1.04 -5.12 1.30 -4.84 1.76 -4.60 0.54 -4.52 1.12
11 -4.80 0.26 -4.42 0.24 -4.44 0.58 -4.80 0.82 -4.56 1.14 -4.46 0.38 -4.30 0.62
12 -3.12 0.96 -2.74 0.76 -2.72 1.20 -2.94 1.54 -2.70 1.28 -2.56 0.64 -2.48 1.38
13 -2.64 0.78 -2.32 0.66 -2.32 1.12 -2.40 1.32 -2.22 0.94 -2.18 0.78 -2.04 1.08
14 -0.96 2.12 -0.66 2.04 -0.64 2.42 -0.62 1.98 -0.52 2.10 -0.50 1.88 -0.24 2.58
15 2.96 2.86 3.26 2.94 3.42 3.22 3.56 2.94 3.74 3.20 3.88 3.24 4.12 3.52
16 1.56 1.22 1.70 1.38 1.74 1.36 1.86 1.30 2.00 1.50 2.12 1.38 2.18 1.56
INCLINOMETER READING
I-1

Project :
C0 3 Alert Level : ± 50 mm
Work Suspension Level: ± 70 mm

Date Monitored 28/04/09 05/05/09 12/05/09 19/05/09 Remarks


Max.movement (mm) -11.34mm 3.42mm -9.72mm 3.72mm -10.72mm 3.36mm -10.14mm 3.78mm
Depth of Max.Move(m) 1.0m Dep 15.0m Dep 3.0m Dep 15.0m Dep 1.0m Dep 15.0m Dep 1.0m Dep 15.0m Dep

DEPTH A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180
(m) A B A B A B A B A B A B A B
0
1 -11.34 -0.04 -9.64 1.62 -10.72 0.38 -10.14 0.48
2 -10.96 0.22 -9.40 1.58 -10.40 0.36 -9.94 0.64
3 -11.04 1.32 -9.72 2.60 -10.56 1.60 -10.14 1.70
4 -9.94 0.58 -8.70 1.88 -9.38 0.88 -9.10 1.08
5 -9.64 -0.02 -8.50 1.28 -9.08 0.26 -8.80 0.38
6 -7.54 0.76 -6.60 1.52 -7.02 0.70 -6.76 0.98
7 -7.64 -0.02 -6.88 0.76 -7.20 0.04 -6.90 0.32
8 -5.48 0.56 -4.86 1.18 -5.08 0.66 -4.78 0.92
9 -5.74 0.58 -5.14 1.18 -5.36 0.70 -5.18 1.14
10 -5.40 0.64 -4.88 1.38 -5.06 0.92 -4.92 1.32
11 -5.14 0.02 -4.68 0.70 -4.88 0.16 -4.74 0.50
12 -3.12 0.98 -2.72 1.38 -2.88 0.92 -2.70 1.32
13 -2.64 0.80 -2.30 1.16 -2.38 0.74 -2.24 1.14
14 -0.82 2.32 -0.48 2.72 -0.60 2.24 -0.46 2.66
15 3.84 3.42 4.22 3.72 4.20 3.36 4.48 3.78
16 2.04 1.50 2.28 1.68 2.26 1.44 2.42 1.98
Inclinometer Reading
I-1

Excavation activity
Project : A+ Alert Level : ± 50 mm
C0 3 Work Suspension Level: ± 70 mm
    B‐ B+
A‐

A Direction Movement Trend B Direction Movement Trend

A- Displacement (mm) A+ B- Displacement (mm) B+

-80
-70
-60
-50
-40
-30
-20
-10

10
20
30
40
50
60
70
80
-80
-70
-60
-50
-40
-30
-20
-10

0
10
20
30
40
50
60
70
80
0

0 0

1
1

2 2

3
3

4
4

5
5

6
6

7
7
epth (m)
Depth (m)

8
8
Depth

9
9

10
10

11
11

12
12

13
13

14
14

15
15

16
16

17
17 20/12/08
20/12/08 27/12/2008 27/12/2008
03/01/09
03/01/09 06/01/09 06/01/09
13/01/09
13/01/09 20/01/09 20/01/09
03/02/09
03/02/09 10/02/09 10/02/09
17/02/09
17/02/09 24/02/09 24/02/09
03/03/09
03/03/09 10/03/09 10/03/09
17/03/09
17/03/09 23/03/09 23/03/09
31/03/09
31/03/09 07/04/09 07/04/09
14/04/09
14/04/09 21/04/09 21/04/09
ALERT LEVEL(±50mm)
ALERT LEVEL(±50mm) SUSPENSION LEVEL(±70mm) SUSPENSION LEVEL(±70mm)
28/04/09
28/04/09 05/05/09 05/05/09
12/05/09
12/05/09 19/05/09 19/05/09
INCLINOMETER READING
I-2

Project :
C0 3 Alert Level : ± 50 mm
Work Suspension Level: ± 70 mm

Date Monitored 20/01/09 03/02/09 10/02/09 17/02/09 24/02/09 03/03/09 10/03/09 Remarks
Max.movement (mm) 3.16mm -1.46mm 3.44mm 0.84mm 1.84mm -0.70mm 2.78mm -0.82mm 3.16mm -1.04mm 3.36mm 0.62mm 4.84mm -1.20mm
Depth of Max.Move(m) 1.5m Dep 3.5m Dep 1.5m Dep 8.5m Dep 1.5m Dep 1.5m Dep 1.5m Dep 1.5m Dep 1.5m Dep 1.5m Dep 1.5m Dep 8.5m Dep 1.5m Dep 1.5m Dep

DEPTH A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180
(m) A B A B A B A B A B A B A B
0
0.5 1.36 0.04 2.58 0.56 -0.30 0.48 0.94 0.46 1.16 -0.04 1.28 0.14 2.90 -0.20
1.5 3.16 -1.38 3.44 0.62 1.84 -0.70 2.78 -0.82 3.16 -1.04 3.36 -0.42 4.84 -1.20
2.5 2.42 -1.08 2.80 0.66 1.16 -0.08 1.94 -0.22 2.38 -0.52 2.58 0.22 3.88 -0.84
3.5 2.40 -1.46 2.70 0.50 1.26 -0.56 1.90 -0.70 2.38 -0.86 2.52 0.04 3.68 -1.12
4.5 2.32 -0.92 2.52 0.48 1.42 0.04 1.98 -0.12 2.52 -0.10 2.56 0.22 3.60 -0.64
5.5 2.06 -0.62 2.30 0.54 1.22 0.18 1.64 0.02 2.14 0.00 2.20 0.34 3.18 -0.46
6.5 1.88 -0.46 2.14 0.56 1.12 0.26 1.40 0.28 1.90 0.08 1.98 0.42 2.82 0.00
7.5 1.40 -0.08 1.64 0.54 0.70 0.14 0.82 0.22 1.36 0.22 1.42 0.24 2.20 0.16
8.5 0.76 0.26 1.04 0.84 0.06 0.60 0.02 0.60 0.56 0.56 0.72 0.62 1.36 0.64
9.5 0.58 0.26 0.80 0.80 0.02 0.56 -0.14 0.26 0.42 0.34 0.58 0.62 1.02 0.70
10.5 0.96 0.20 0.54 0.74 0.78 0.40 0.60 0.12 1.32 0.24 1.42 0.30 1.70 0.46
11.5 1.12 -0.04 0.32 0.54 1.44 0.02 1.84 -0.28 1.92 -0.14 1.90 -0.08 2.12 -0.06
INCLINOMETER READING
I-2

Project :
C0 3 Alert Level : ± 50 mm
Work Suspension Level: ± 70 mm

Date Monitored 17/03/09 25/03/09 31/03/09 07/04/09 14/04/09 21/04/09 28/04/09 Remarks
Max.movement (mm) 3.06mm 1.26mm 2.78mm 0.74mm 4.52mm 0.76mm 3.22mm -2.84mm 2.60mm 1.22mm 2.54mm 0.68mm 3.42mm -0.98mm
Depth of Max.Move(m) 1.5m Dep 8.5m Dep 1.5m Dep 8.5m Dep 2.0m Dep 9.0m Dep 1.5m Dep 0.5m Dep 1.5m Dep 8.5m Dep 11.5m Dep 8.5m Dep 1.5m Dep 0.5m Dep

DEPTH A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180
(m) A B A B A B A B A B A B A B
0
0.5 1.22 0.92 0.18 -0.36 2.26 0.12 0.72 -2.84 0.84 -0.26 -0.34 -0.66 1.18 -0.98
1.5 3.06 -0.36 2.78 -0.66 4.52 0.08 3.22 -2.18 2.60 0.02 1.94 -0.54 3.42 -0.72
2.5 2.26 0.26 2.02 0.06 3.64 0.50 2.44 -1.62 1.92 0.36 1.28 0.10 2.64 -0.16
3.5 2.18 -0.06 2.00 -0.50 3.46 0.00 2.34 -1.82 1.94 -0.14 1.34 -0.10 2.60 -0.30
4.5 2.24 0.26 2.08 -0.06 3.40 0.44 2.34 -1.14 2.04 0.22 1.58 0.16 2.68 0.22
5.5 1.94 0.52 1.78 0.02 2.92 0.46 2.06 -0.72 1.78 0.36 1.42 0.08 2.32 0.34
6.5 1.72 0.86 1.60 0.36 2.56 0.60 1.82 -0.32 1.60 0.90 1.30 0.26 2.02 0.44
7.5 1.20 0.90 1.14 0.38 1.90 0.56 1.30 -0.14 1.06 1.04 0.86 0.32 1.44 0.48
8.5 0.46 1.26 0.42 0.74 1.00 0.76 0.54 0.10 0.30 1.22 0.14 0.68 0.54 0.76
9.5 0.34 0.52 0.32 0.56 0.74 0.70 0.44 0.04 0.24 0.82 0.06 0.46 0.40 0.66
10.5 1.26 0.48 1.36 0.36 1.74 0.36 1.66 -0.16 1.56 0.38 1.54 0.30 1.88 0.38
11.5 1.94 -0.10 2.14 -0.30 2.46 -0.20 2.42 -0.12 2.50 0.02 2.54 -0.36 2.86 -0.24
INCLINOMETER READING
I-2

Project :
C0 3 Alert Level : ± 50 mm
Work Suspension Level: ± 70 mm

Date Monitored 05/05/09 12/05/09 19/05/09 Remarks


Max.movement (mm) 2.88mm -0.64mm 3.38mm -1.54mm 3.22mm 1.48mm
Depth of Max.Move(m) 1.5m Dep 1.5m Dep 1.5m Dep 0.5m Dep 11.5m Dep 8.5m Dep

DEPTH A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180 A0-A180 B0-B180
(m) A B A B A B A B A B A B A B
0
0.5 0.76 -0.44 1.02 -1.54 0.76 0.60
1.5 2.88 -0.64 3.38 -1.06 3.06 0.16
2.5 2.16 -0.20 2.58 -1.04 2.26 0.48
3.5 2.14 -0.34 2.50 -1.28 2.22 0.14
4.5 2.26 -0.12 2.56 -0.86 2.38 0.72
5.5 2.02 -0.24 2.28 -0.76 2.12 0.84
6.5 1.78 -0.04 2.00 -0.26 1.86 0.98
7.5 1.22 -0.16 1.42 -0.08 1.30 1.02
8.5 0.38 0.26 0.58 0.18 0.42 1.48
9.5 0.30 0.26 0.50 -0.04 0.28 1.08
10.5 1.84 -0.06 1.98 -0.34 2.00 0.56
11.5 2.82 -0.48 2.96 -0.50 3.22 -0.36
Inclinometer Reading
I-2
Excavation activity
A+
Project : Alert Level : ±50mm
C0 3 B‐ B+ Work Suspension Level: ± 70 mm
A‐

A Direction Movement Trend B Direction Movement Trend

A- Displacement (mm) A+ B- Displacement (mm) B+

-80
-70
-60
-50
-40
-30
-20
-10

10
20
30
40
50
60
70
80
-80
-70
-60
-50
-40
-30
-20
-10

10
20
30
40
50
60
70
80

0
0

0 0

2 2

4 4
Depth (m)
Depth (m)

6 6

8 8

10 10

12 12
03/01/09 27/12/08
13/12/08 20/12/08
06/01/09 13/01/09
27/12/08 03/01/09

20/01/09 03/02/09 06/01/09 13/01/09

10/02/09 17/02/09 20/01/09 03/02/09

24/02/09 03/03/09 10/02/09 17/02/09

24/02/09 03/03/09
10/03/09 17/03/09
10/03/09 17/03/09
ALERT LEVEL(±50mm) SUSPENSION LEVEL(±70mm)
ALERT LEVEL(±50mm) SUSPENSION LEVEL(±70mm)
25/03/09 31/03/09
25/03/09 31/03/09
07/04/09 14/04/09
07/04/09 14/04/09
21/04/09 28/04/09
21/04/09 28/04/09
05/05/09 12/05/09 05/05/09 12/05/09

19/05/09 19/05/09
SETTLEMENT POINT/ ROD READING
SM 1 TO 20 (Road 2)

Project :
C0 3 Alert Level : 50mm
Work Suspension Level : 70mm

DATE INITIAL 24/02/09 DIFF 03/03/09 DIFF 10/03/09 DIFF 17/03/09 DIFF 25/03/09 DIFF 31/03/09 DIFF
READING (mm) (mm) (mm) (mm) (mm) (mm) Remarks
No. PTS. NO.
1 SM 1 319.8889 319.8890 0.1 319.8903 1.4 319.8900 1.1 319.8901 1.2 319.891 1.8 319.891 2.0
2 SM 2 322.4818 322.4820 0.2 322.4826 0.8 322.4830 1.2 322.4838 2.0 322.483 1.4 322.484 2.0
3 SM 3 324 0110
324.0110 324 0113
324.0113 03
0.3 324 0118
324.0118 08
0.8 324 0116
324.0116 06
0.6 324 0123
324.0123 13
1.3 324 012
324.012 13
1.3 324 014
324.014 25
2.5
4 SM 4 315.5129 315.5126 -0.3 315.5119 -1.0 315.5120 -0.9 315.5118 -1.1 315.511 -1.5 315.512 -0.8
5 SM 5 320.1370 320.1364 -0.6 320.1361 -0.9 320.1365 -0.5 320.1338 -3.2 320.135 -1.6 320.136 -0.8
6 SM 6 324.8118 324.8099 -1.9 324.8095 -2.3 324.8084 -3.4 324.8099 -1.9 324.809 -2.7 324.811 -1.1
7 SM 7 328.6183 328.6184 0.1 328.6173 -1.0 328.6172 -1.1 328.6176 -0.7 328.618 -0.8 328.617 -1.1
8 SM 8 330.1371 330.140 2.6 330.138 0.7
9 SM 9 332.0192 332.020 0.8 332.021 1.8
10 SM 10 325.2698 325.270 0.5 325.271 1.2
11 SM 11
12 SM 12
13 SM 13
14 SM 14
15 SM 15
16 SM 16
17 SM 17
18 SM 18
19 SM 19
20 SM 20

Note: (I) - Initial Reading (RI) - Reinitilize Reading


Positive (+) indicate the heaving of the ground
Negative ((-)) indicate the settlement of the ground
SETTLEMENT POINT/ ROD READING
SM 1 TO 20 ( Road 2)

Project :
C0 3 Alert Level : 50mm
Work Suspension Level : 70mm

DATE INITIAL 07/04/09 DIFF 14/04/09 DIFF 21/04/09 DIFF 28/04/09 DIFF 05/05/09 DIFF 12/05/09 DIFF Remarks
READING (mm) (mm) (mm) (mm) (mm) (mm)
No. PTS. NO.
1 SM 1 319.8889 319.8905 1.6 319.8909 2.0 319.8906 1.7 319.8901 1.2 319.8909 2.0 319.8909 2.0
2 SM 2 322.4818
322 4818 322 4828
322.4828 1.0
1 0 322.4825
322 4825 0.7
0 7 322 4821
322.4821 0.3
0 3 322.4830
322 4830 1.2
1 2 322.4820
322 4820 0.2
0 2 322.4817
322 4817 -0.1
-0 1
3 SM 3 324.0110 324.0119 0.9 324.0117 0.7 324.0116 0.6 324.0111 0.1 324.0120 1.0 324.0117 0.7
4 SM 4 315.5129 315.5129 0 315.5120 -0.9 315.5132 0.3 315.5124 -0.5 315.5128 -0.1 315.5123 -0.6
5 SM 5 320.1370 320.1361 -0.9 320.1361 -0.9 320.1368 -0.2 320.1365 -0.5 320.1366 -0.4 320.1365 -0.5
6 SM 6 324.8118 324.8097 -2.1 324.8116 -0.2 324.8109 -0.9 324.8091 -2.7 324.8093 -2.5 324.8108 -1.0
7 SM 7 328.6183 328.6182 -0.1 328.6173 -1.0 328.6178 -0.5 328.6182 -0.1 328.6174 -0.9 328.6179 -0.4
8 SM 8 330.1371 330.1403 3.2 330.1385 1.4 330.1364 -0.7 330.1386 1.5 330.1363 -0.8 330.1367 -0.4
9 SM 9 332.0192 332.0195 0.3 332.0210 1.8 332.0203 1.1 332.0195 0.3 332.0201 0.9 332.0208 1.6
10 SM 10 325.2698 325.2696 -0.2 325.2692 -0.6 325.2693 -0.5 325.2689 -0.9 325.2692 -0.6 325.2687 -1.1
11 SM 11
12 SM 12
13 SM 13
14 SM 14
15 SM 15
16 SM 16
17 SM 17
18 SM 18
19 SM 19
20 SM 20

Note: (I) - Initial Reading (RI) - Reinitilize Reading


Positive (+) indicate the heaving of the ground
Negative (-) indicate the settlement of the ground
SETTLEMENT POINT/ ROD READING
SM 1 TO 20 (Road 2)

Project :
C0 3 Alert Level : 50mm
Work Suspension Level : 70mm

DATE INITIAL 19/05/09 DIFF DIFF DIFF DIFF DIFF DIFF Remarks
READING (mm) (mm) (mm) (mm) (mm) (mm)
No. PTS. NO.
1 SM 1 319.8889 319.8901 1.2
2 SM 2 322 4818
322.4818 322 4818
322.4818 0
3 SM 3 324.0110 324.0093 -1.7
4 SM 4 315.5129 315.5120 -0.9
5 SM 5 320.1370 320.1364 -0.6
6 SM 6 324.8118 324.8101 -1.7
7 SM 7 328.6183 328.6175 -0.8
8 SM 8 330.1371 330.1382 1.1
9 SM 9 332.0192 332.0201 0.9
10 SM 10 325.2698 325.2699 0.1
11 SM 11
12 SM 12
13 SM 13
14 SM 14
15 SM 15
16 SM 16
17 SM 17
18 SM 18
19 SM 19
20 SM 20

Note: (I) - Initial Reading (RI) - Reinitilize Reading


Positive (+) indicate the heaving of the ground
Negative (-) indicate the settlement of the ground
Heaving / Settlement Vs Time For SM 1 to 20 (Road 2)
SM 1

80.0 SM 2

SM 3

SM 4
60.0 SM 5

SM 6

SM 7
40.0
SM 8

SM 9
Settlement/ Heaving (mm))

SM 10
20.0
SM 11

SM 12

0.0 SM 13

SM 14

SM 15
-20.0 SM 16

SM 17

SM 18
-40.0
SM 19

SM 20

Alert
-60.0
Alert

Susepsnsion

-80.0 Susepsnsion
24/02/09

03/03/09

10/03/09

17/03/09

24/03/09

31/03/09

07/04/09

14/04/09

21/04/09

28/04/09

05/05/09

12/05/09

19/05/09