The Badarpur Thermal Power Station has an installed capacity of 705 MW.

It is situated in south east corner of Delhi on Mathura Road near Faridabad. It was the first central sector power plant conceived in India, in 1965. It was originally conceived to provide power to neighbouring states of Haryana, Punjab, Jammu and Kashmir, U.P., Rajasthan, and Delhi. But since year 1987 Delhi has become its sole beneficiary. It was owned and conceived by Central Electric Authority. Its construction was started in year 1968, and the First unit was commissioned in 26 July 1973. The coal for the plant is derived from the Jharia Coal Fields. This was constructed under ownership of Central Electric Authority, later it was transferred to NTPC. It supplies power to Delhi city. It is one of the oldest plant in operation. Its 100 MW units capacity have been reduced to 95 MW. These units have indirectly fired boiler, while 210 MW units have directly fired boiler. All the turbines are of Russian Design. Both turbine and boilers have been supplied by BHEL. The boiler of Stage-I units are of Czech. design. The boilers of Unit 4 and 5 are designed by combustion engineering (USA). The instrumentation of the stage I units and unit 4 are of The Russian design. Instrumentation of unit5 is provided by M/S Instrumentation Ltd. Kota, is of Kent design. In 1978 the management of the plant was transferred to NTPC, from CEA. The performance of the plant increased significantly, and steadily after take over by NTPC till 2006, but now the plant is facing various issues. Being an old plant, Badarpur Thermal Power Station (BTPS) has little automation. Its performance is deteriorating due to various reasons, like aging, poor quantity and quality of cooling water etc. It receive cooling water from Agra Canal, which is an irrigation canal from Yamuna river. Due to rising water pollution, the water of Yamuna is highly polluted. This polluted water when goes into condenser, adversely affect life of condenser tubes, resulting in frequent tube leakages. This dirty water from tube leakages, gets mixed into feed water cycle causes numerous problems, like frequent boiler tube leakages, and silica deposition on turbine blades. Apart from poor quality, the quantity of water supply is also erratic due to lack of co-ordination between NTPC and UP irrigation which manages Agra Canal. The quality of the coal supplied has degraded considerably. At worst times, there were many unit tripping owing to poor quality. The poor coal quality also put burdens on equipment, like mills and their performance also goes down.The coal for the plant is fetched from far away, that makes the total fuel cost double of coal cost at coalmine. This factor, coupled with low efficiency due to aging and old design makes electricity of the plant costlier. Presently the management is headed by Mr. N. K. Kothari, General manager.
[2]

Installed capacity[edit]
Stage Unit Number Installed Capacity (MW) Date of Commissioning Status

First

95

July, 1973

Running

First

95

August, 1974

Running

Stage

Unit Number

Installed Capacity (MW)

Date of Commissioning

Status

First

95

March, 1975

Running

Second

210

December, 1978

Running

Second t 5

210

Decebmber, 1981

Running