22ND MAR2004
Team leader: VIKAS SETHI Team members: K.K.S ,P.C., R.S.D., N.M., V.T.
Annual Cost of Poor quality: Rs. 4.5 L (Year: Apr 2003 Mar 2004)
Slide Number: 2
22ND MAR2004
Project - Helmet Lock Assy. Not Working Cost of Poor Quality Breakup Rework cost = Rs 2.50 / pc Processing cost = NIL Material cost = Rs 20 / pc Intangible Savings Customer Satisfaction Smooth assembly line flow
Slide Number: 3
22ND MAR2004
Phase 1- Definition
Problem definition Response definition Instruments to be used R&R study details Potential sources of variation from FMEA s/Brain storming
Slide Number: 4
22ND MAR2004
Problem Statement
Response to be measured
Lock Operation (Attribute )
Specification
Assy. should get locked when load is applied on cap button
22ND MAR2004
Slide Number: 6
22ND MAR2004
BODY BAR SLIDER SLIDER SPRING RETURN SPRING SLIDER PLATE BACK
ND MAR2004 CAP 22BUTTON
Slide Number: 7
Cap button
Slide Number: 8
22ND MAR2004
ND
MAR2004
22ND MAR2004
22ND MAR2004
Since Good remains Good & Bad remains Bad , it was concluded that Assembly & Body Helmet Lock are not the cause of Problem, the other components used in assy are the cause of problem. 22 MAR2004
Slide Number: 12
ND
Components were interchanged in the same order to see the change in the Response. 22 MAR2004
Slide Number: 13
ND
Slide Number: 14
Phase 2 Measure and Analyze Collection of Data using C. Search Since the parts were interchanged the result was:
Good remained good & bad remained bad on interchange of Plate Back Good remained good & bad remained bad on interchange of Slider Good remained good & bad remained bad on interchange of Plate back + Slider Good remained good & bad remained bad on interchange of Bar Slider. Good turned bad & bad turned good on interchange of Inner Cylinder This proves that all the components are ok, the only the inner cylinder is causing the problem .
Slide Number: 15
22ND MAR2004
Funneling
Assy , body
Y( Lock operation)=f( x- assy. ,body plate back , slider, I/C, Bar slider )
Inner cylinder
Slide Number: 16
22ND MAR2004
22ND MAR2004
22ND MAR2004
S. No. 35 44 12 2 26 95 49 19 5 58 65 72
Dia 12.45 12.41 12.44 12.44 12.44 12.43 12.4 12.42 12.42 12.43 12.45 12.43 12.42
Dim 6.6 6.5 6.59 6.52 6.54 6.56 6.56 6.51 6.54 6.58 6.56 6.6 6.57
Dim 19.7 19.6 19.65 19.66 19.63 19.65 19.68 19.7 19.8 19.85 19.72 19.74 19.76
Dim 2.1 2 2.05 1.95 2.04 1.98 1.96 2.1 2.1 2.1 2.12 2.12 2.1
21.80 21.60 21.70 21.61 21.67 21.63 21.64 21.80 21.90 21.95 21.84 21.86 21.86
Phase 2 Measure and Analyze Collection of Data & analysis Dia 12.45
12.40( B ) 12.41 ( B ) 12.42(G) 12.42(G) 12.42(G) 12.43(B) 12.43(G) 12.43(G) 12.44 ( B ) 12.44(B) 12.44(B) 12.45(G)
COUNT = 3
Slide Number: 20
22ND MAR2004
12.45
Phase 2 Measure and Analyze Collection of Data & analysis Dim 6.6
6.5 ( B ) 6.51 ( G ) 6.52 ( B ) 6.54 ( B ) 6.54 ( G ) 6.56 ( B ) 6.56 ( B ) 6.56 ( G ) 6.57 ( G ) 6.58 ( G ) 6.59 ( B ) 6.6 ( G ) 6.6
COUNT = 2
Slide Number: 21
22ND MAR2004
21.80 21.6 ( B ) 21.61 ( B ) 21.63 ( B ) 21.64 ( B ) 21.67 ( B ) 21.7 ( B ) 21.8 ( G ) 21.84 ( G ) 21.86 ( G ) 21.86 ( G) 21.9 ( G ) 21.95 ( G)
22ND MAR2004
Funneling
Assy , body
Y( Lock operation)=f( x- assy. ,body plate back , slider, I/C, Bar slider )
Inner cylinder
Slide Number: 23
22ND MAR2004
22ND MAR2004
ROOT CAUSE
19.7-0.1 2.1-0.1
Slide Number: 25
22ND MAR2004
B VS C DONE. Assumption : the dim 19.7 & 2.1 will lead to distinct separation between good & bad 3 Bs Selected Dim 21.95 3 Cs Selected Dim 21.6 C B Bad Bad Bad Good Good Good
Slide Number: 26
22ND MAR2004
Funneling
Assy , body
Plate, slider, bar
Y( Lock operation)=f( x- assy. ,body plate back , slider, I/C, Bar slider )
Inner cylinder
B V/S C
Slide Number: 27
22ND MAR2004
Phase 3 Improvement
Inner Cylinder dimensions revised in drawing. Identification of Interim & Permanent actions to correct the cause identified in Phase 2 Implementation of the actions
Slide Number: 28
22ND MAR2004
Phase 3 Improvement
Lot segregation done & 45 pcs. Rejected / 4000 pcs. O.K pcs Fed on line & found locking operation O.K. 22580 pcs. made till 9/3/04 with modified die pieces are found to be O.K.
Slide Number: 29
22ND MAR2004
Phase 3 Improvement
Horizontal Deployment
All the above actions are planned for other varieties of Inner cylinder.
Slide Number: 30
22ND MAR2004
Phase 4 - Control
Implemented controls to make sure that the actions taken in Phase-3 are done for ever Updation of FMEA and Control Plans based on the analysis done in Phase-2
Slide Number: 31
22ND MAR2004
Phase 4 - Control
Die modified as per the drawing . Supplier to maintain the dim & send inspection report for in process inspection/ dock audit . In process inspector will monitor the dimension, & give the feed back to DOE team on daily basis to highlight the dimensional variation, if any.
Slide Number: 32
22ND MAR2004