You are on page 1of 24

STATEMENT C (For 2008-2009) P.W.

PUNE REGION
Carriage of Material over distance exceeding 0.50 Km. including loading and unloding.
Leads in Av. speed No.of
Km's
Qty.of
Cost of
Qty.of
Cost of Cost of
Hire
KMS.
Kms./Hrs. Trips
Done
Diesel
Diesel
Mobile Oil Mobile Oil 6
Charges
Ltr.
@
Ltr.
@
Mazdoor of Truck.
L
S
N=8/2(L/S2NL+6
37.91
140.00
166.00
1274.00
1
2
3
4
5
6
7
8
9
10

Petrol
Diesel
Engine Oil
Total
Add 10% Total of
cost
overhead
Rs.
charges.
(6+8+9+10)
(11+12)
11
12
13

53.35 per Ltr.


37.91 per Ltr.
140.00 per Ltr.
(Cost per Lead
Trip
in
Kms.
col. 13/3
14
15

0.50

15.00

7.50

13.50

4.50

170.60

0.096

13.50

996.00

1274.00

2454.10

245.41

2699.50

359.93

0.50

1.00

16.00

7.11

20.22

6.74

255.54

0.144

20.22

996.00

1274.00

2545.76

254.58

2800.34

393.80

1.00

1.50

16.50

6.77

26.31

8.77

332.44

0.188

26.31

996.00

1274.00

2628.75

262.87

2891.62

427.17

1.50

2.00

17.00

6.48

31.90

10.63

403.17

0.228

31.90

996.00

1274.00

2705.07

270.51

2975.58

459.46

2.00

2.50

17.25

6.20

37.01

12.34

467.70

0.264

37.01

996.00

1274.00

2774.71

277.47

3052.18

492.11

2.50

3.00

17.50

5.96

41.74

13.91

527.51

0.298

41.74

996.00

1274.00

2839.26

283.93

3123.18

524.25

3.00

3.50

17.75

5.74

46.16

15.39

583.33

0.330

46.16

996.00

1274.00

2899.49

289.95

3189.44

555.91

3.50

4.00

18.00

5.54

50.31

16.77

635.72

0.359

50.31

996.00

1274.00

2956.03

295.60

3251.63

587.10

4.00

4.50

18.25

5.36

54.22

18.07

685.16

0.387

54.22

996.00

1274.00

3009.38

300.94

3310.32

617.85

4.50

5.00

18.50

5.19

57.93

19.31

732.04

0.414

57.93

996.00

1274.00

3059.97

306.00

3365.97

648.18

5.00

6.00

18.75

4.88

64.54

21.51

815.53

0.461

64.54

996.00

1274.00

3150.06

315.01

3465.07

710.34

6.00

7.00

19.00

4.61

70.48

23.49

890.69

0.503

70.48

996.00

1274.00

3231.18

323.12

3554.30

771.66

7.00

8.00

19.30

4.37

75.98

25.33

960.17

0.543

75.98

996.00

1274.00

3306.15

330.62

3636.77

831.46

8.00

9.00

19.60

4.17

81.06

27.02

1024.38

0.579

81.06

996.00

1274.00

3375.44

337.54

3712.98

890.36

9.00

10.00

20.00

4.00

86.00

28.67

1086.75

0.614

86.00

996.00

1274.00

3442.75

344.28

3787.03

946.76

10.00

15.00

25.00

3.64

115.09

38.36

1454.37

0.822

115.09

996.00

1274.00

3839.46

383.95

4223.40

1161.44

15.00

20.00

25.00

3.08

129.08

43.03

1631.10

0.922

129.08

996.00

1274.00

4030.18

403.02

4433.20

1440.79

20.00

215

STATEMENT C (For 2008-2009) P.W.PUNE REGION


Carriage of Material over distance exceeding 0.50 Km. including loading and unloding.
Leads in Av. speed No.of
Km's
Qty.of
Cost of
Qty.of
Cost of Cost of
Hire
KMS.
Kms./Hrs. Trips
Done
Diesel
Diesel
Mobile Oil Mobile Oil 6
Charges
Ltr.
@
Ltr.
@
Mazdoor of Truck.
L
S
N=8/2(L/S2NL+6
37.91
140.00
166.00
1274.00
1
2
3
4
5
6
7
8
9
10

Petrol
Diesel
Engine Oil
Total
Add 10% Total of
cost
overhead
Rs.
charges.
(6+8+9+10)
(11+12)
11
12
13

53.35 per Ltr.


37.91 per Ltr.
140.00 per Ltr.
(Cost per Lead
Trip
in
Kms.
col. 13/3
14
15

25.00

25.00

2.67

139.33

46.44

1760.71

0.995

139.33

996.00

1274.00

4170.04

417.00

4587.05

1720.14

25.00

30.00

25.00

2.35

147.18

49.06

1859.82

1.051

147.18

996.00

1274.00

4277.00

427.70

4704.70

1999.50

30.00

35.00

30.00

2.40

174.00

58.00

2198.78

1.243

174.00

996.00

1274.00

4642.78

464.28

5107.06

2127.94

35.00

40.00

30.00

2.18

180.55

60.18

2281.49

1.290

180.55

996.00

1274.00

4732.04

473.20

5205.24

2385.74

40.00

45.00

30.00

2.00

186.00

62.00

2350.42

1.329

186.00

996.00

1274.00

4806.42

480.64

5287.06

2643.53

45.00

50.00

30.00

1.85

190.62

63.54

2408.74

1.362

190.62

996.00

1274.00

4869.36

486.94

5356.29

2901.33

50.00

60.00

30.00

1.60

198.00

66.00

2502.06

1.414

198.00

996.00

1274.00

4970.06

497.01

5467.07

3416.92

60.00

70.00

30.00

1.41

203.65

67.88

2573.42

1.455

203.65

996.00

1274.00

5047.07

504.71

5551.77

3932.51

70.00

80.00

30.00

1.26

208.11

69.37

2629.76

1.486

208.11

996.00

1274.00

5107.86

510.79

5618.65

4448.10

80.00

90.00

30.00

1.14

211.71

70.57

2675.36

1.512

211.71

996.00

1274.00

5157.08

515.71

5672.78

4963.69

90.00

100.00

30.00

1.04

214.70

71.57

2713.04

1.534

214.70

996.00

1274.00

5197.73

519.77

5717.51

5479.28

100.00

125.00

40.00

1.10

281.86

93.95

3561.80

2.013

281.86

996.00

1274.00

6113.66

611.37

6725.02

6094.55

125.00

150.00

40.00

0.94

288.35

96.12

3643.82

2.060

288.35

996.00

1274.00

6202.17

620.22

6822.39

7248.79

150.00

175.00

40.00

0.82

293.18

97.73

3704.81

2.094

293.18

996.00

1274.00

6267.99

626.80

6894.79

8403.03

175.00

200.00

40.00

0.73

296.91

98.97

3751.94

2.121

296.91

996.00

1274.00

6318.85

631.89

6950.74

9557.26

200.00

Note ;

1.No. of trips in working of 8 hours N =8/2(L/S)+1


2.In col. 4 of Kms. Done allowance of 6 KMS. is considered.
3.Consumptionof Mobile Oil - 1Ltr. per 140 Kms. of travel (oil rate is Rs.140/Ltr.)
4.Mazdoor for Loading /Unloding RS. 166./Day
5.Higher charges of Truck Rs. 1274/day
6.L.F. - PAY LOAD factor/Trip

216

STATEMENT -C 1(2008-2009) PUNE REGION


Lead in
Kms.

Cost
per
Trip

Lime,Murum ,
Building Rabish
Unit Cum
Fuel
L.F. 6.00
Compo.

Earth
Unit Cum
L.F. 4.80

Fuel
Compo.

Manure of
Sludge
Unit Cum
Fuel
L.F. 5.45
Compo.

Excavvated
ock
Ro
Unit Cum
L.F. 3.00

Fuel
Compo.

10

0.50

359.93

59.99

4.50

74.99

5.63

66.04

4.95

119.98

9.00

1.00

393.80

65.63

7.11

82.04

8.89

72.26

7.83

131.27

14.22

1.50

427.17

71.20

9.72

88.99

12.15

78.38

10.70

142.39

19.43

2.00

459.46

76.58

12.32

95.72

15.40

84.31

13.56

153.15

24.63

2.50

492.11

82.02

14.92

102.52

18.65

90.30

16.42

164.04

29.84

3.00

524.25

87.37

17.52

109.22

21.90

96.19

19.29

174.75

35.04

3.50

555.91

92.65

20.11

115.81

25.14

102.00

22.14

185.30

40.23

4.00

587.10

97.85

22.71

122.31

28.39

107.72

25.00

195.70

45.42

4.50

617.85

102.98

25.30

128.72

31.63

113.37

27.85

205.95

50.60

5.00

648.18

108.03

27.89

135.04

34.86

118.93

30.70

216.06

55.78

6.00

710.34

118.39

33.08

147.99

41.34

130.34

36.41

236.78

66.15

7.00

771.66

128.61

38.26

160.76

47.82

141.59

42.12

257.22

76.51

8.00

831.46

138.58

43.43

173.22

54.29

152.56

47.81

277.15

86.86

9.00

890.36

148.39

48.60

185.49

60.75

163.37

53.50

296.79

97.20

10.00

946.76

157.79

53.75

197.24

67.19

173.72

59.18

315.59

107.50

15.00

1161.44

193.57

79.13

241.97

98.91

213.11

87.11

387.15

158.25

217

Lead in
Kms.

Cost
per
Trip

Lime,Murum ,
Building Rabish
Unit Cum
Fuel
L.F. 6.00
Compo.

Earth
Unit Cum
L.F. 4.80

Fuel
Compo.

Manure of
Sludge
Unit Cum
Fuel
L.F. 5.45
Compo.

Excav
Ro
Unit Cum
L.F. 3.00

20.00

1440.79

240.13

104.88

300.16

131.10

264.36

115.46

480.26

25.00

1720.14

286.69

130.63

358.36

163.28

315.62

143.81

573.38

30.00

1999.50

333.25

156.38

416.56

195.47

366.88

172.16

666.50

35.00

2127.94

354.66

181.25

443.32

226.57

390.45

199.55

709.31

40.00

2385.74

397.62

206.88

497.03

258.60

437.75

227.76

795.25

45.00

2643.53

440.59

232.51

550.74

290.63

485.05

255.97

881.18

50.00

2901.33

483.55

258.13

604.44

322.66

532.35

284.18

967.11

60.00

3416.92

569.49

309.38

711.86

386.73

626.96

340.60

1138.97

70.00

3932.51

655.42

360.63

819.27

450.79

721.56

397.03

1310.84

80.00

4448.10

741.35

411.88

926.69

514.86

816.16

453.45

1482.70

90.00

4963.69

827.28

463.14

1034.10

578.92

910.77

509.87

1654.56

100.00

5479.28

913.21

514.39

1141.52

642.98

1005.37

566.30

1826.43

125.00

6094.55

1015.76

638.61

1269.70

798.26

1118.27

703.05

2031.52

150.00

7248.79

1208.13

765.95

1510.16

957.44

1330.05

843.25

2416.26

175.00

8403.03

1400.50

893.30

1750.63

1116.63

1541.84

983.45

2801.01

200.00

9557.26

1592.88

1020.65

1991.10

1275.81

1753.63

1123.65

3185.75

218

vated
ock
Fuel
Compo.
10
9.00
14.22
19.43
24.63
29.84
35.04
40.23
45.42
50.60
55.78
66.15
76.51
86.86
97.20
107.50
158.25

219

vated
ock
Fuel
Compo.
10
209.75
261.26
312.76
362.51
413.76
465.01
516.26
618.76
721.27
823.77
926.27
1028.77
1277.22
1531.91
1786.60
2041.30

220

STATEMENT -C1 (2008-2009) PUNE REGION

Lead in
Kms.

Cost
per
Trip

Sand,Stone below 40
mm Normal size,
Brick, Sider agree
Timber
Unit Cum
Fuel
L.F.5.00
Compo.
3
4

Stone aggrigates 40 mm
Normal size,and
Above

Concrete Block
(Form)

Soling Stone

Unit Cum
L.F. 4.62
5

Fuel
Compo.
6

Unit Cum
L.F. 4.25
7

Fuel
Compo.
8

Unit Cum
L.F. 6.00
9

Fuel
Compo.
10

0.50

359.93

71.99

5.40

77.91

5.84

84.69

6.35

59.99

4.50

1.00

393.80

78.76

8.53

85.24

9.23

92.66

10.04

65.63

7.11

1.50

427.17

85.43

11.66

92.46

12.62

100.51

13.72

71.20

9.72

2.00

459.46

91.89

14.78

99.45

16.00

108.11

17.39

76.58

12.32

2.50

492.11

98.42

17.90

106.52

19.38

115.79

21.06

82.02

14.92

3.00

524.25

104.85

21.02

113.47

22.75

123.35

24.73

87.37

17.52

3.50

555.91

111.18

24.14

120.33

26.12

130.80

28.40

92.65

20.11

4.00

587.10

117.42

27.25

127.08

29.49

138.14

32.06

97.85

22.71

4.50

617.85

123.57

30.36

133.73

32.86

145.38

35.72

102.98

25.30

5.00

648.18

129.64

33.47

140.30

36.22

152.51

39.37

108.03

27.89

6.00

710.34

142.07

39.69

153.75

42.96

167.14

46.70

118.39

33.08

7.00

771.66

154.33

45.91

167.03

49.68

181.57

54.01

128.61

38.26

8.00

831.46

166.29

52.12

179.97

56.40

195.64

61.31

138.58

43.43

9.00

890.36

178.07

58.32

192.72

63.11

209.50

68.61

148.39

48.60

10.00

946.76

189.35

64.50

204.93

69.81

222.77

75.88

157.79

53.75

15.00

1161.44

232.29

94.95

251.39

102.76

273.28

111.71

193.57

79.13

219

Lead in
Kms.

Cost
per
Trip

Sand,Stone below 40
mm Normal size,
Brick, Sider agree
Timber
Unit Cum
Fuel
L.F.5.00
Compo.
3
4

Stone aggrigates 40 mm
Normal size,and
Above

Soling Stone

Concrete Block
(Form)

Unit Cum
L.F. 4.62
5

Fuel
Compo.
6

Unit Cum
L.F. 4.25
7

Fuel
Compo.
8

Unit Cum
L.F. 6.00
9

Fuel
Compo.
10

20.00

1440.79

288.16

125.85

311.86

136.20

339.01

148.06

240.13

104.88

25.00

1720.14

344.03

156.75

372.33

169.65

404.74

184.42

286.69

130.63

30.00

1999.50

399.90

187.65

432.79

203.09

470.47

220.77

333.25

156.38

35.00

2127.94

425.59

217.50

460.59

235.39

500.69

255.89

354.66

181.25

40.00

2385.74

477.15

248.26

516.39

268.67

561.35

292.07

397.62

206.88

45.00

2643.53

528.71

279.01

572.19

301.95

622.01

328.24

440.59

232.51

50.00

2901.33

580.27

309.76

627.99

335.23

682.66

364.42

483.55

258.13

60.00

3416.92

683.38

371.26

739.59

401.79

803.98

436.77

569.49

309.38

70.00

3932.51

786.50

432.76

851.19

468.35

925.30

509.13

655.42

360.63

80.00

4448.10

889.62

494.26

962.79

534.91

1046.61

581.48

741.35

411.88

90.00

4963.69

992.74

555.76

1074.39

601.47

1167.93

653.84

827.28

463.14

100.00

5479.28

1095.86

617.26

1185.99

668.03

1289.24

726.19

913.21

514.39

125.00

6094.55

1218.91

766.33

1319.17

829.36

1434.01

901.56

1015.76

638.61

150.00

7248.79

1449.76

919.15

1569.00

994.75

1705.60

1081.35

1208.13

765.95

175.00

8403.03

1680.61

1071.96

1818.84

1160.13

1977.18

1261.13

1400.50

893.30

200.00

9557.26

1911.45

1224.78

2068.67

1325.52

2248.77

1440.91

1592.88

1020.65

220

STATEMENT -C1 (2008-2009) PUNE REGION

Lead in
Kms.

Cost
per
Trip

Steel, Cement,Stone
block,G.I.C.I.C.C.&A.C.
Pipes below mm/dia.steel
&plate Glass in packs and
distemper A.C.sheet &
fitting iron sheet
Unit M .Tonne
Fuel
L.F.7.00
Compo.
3
4

Tar bitumen, Roofing


Felt &Flooring
Asphalt etc.

Steam Coal (Form)

Mating , Thating
Bamboos & Ballies
Ceilings, Boards
Rubber ,PVC pipes

Unit M .Tonne
L.F. 4.50
5

Fuel
Compo.
6

Unit M .Tonne
L.F. 5.50
7

Fuel
Compo.
8

Unit M .Tonne
L.F.3.00
9

Fuel
Compo.
10

0.50

359.93

51.42

3.86

79.99

6.00

65.44

4.91

119.98

9.00

1.00

393.80

56.26

6.09

87.51

9.48

71.60

7.76

131.27

14.22

1.50

427.17

61.02

8.33

94.93

12.95

77.67

10.60

142.39

19.43

2.00

459.46

65.64

10.56

102.10

16.42

83.54

13.44

153.15

24.63

2.50

492.11

70.30

12.79

109.36

19.89

89.47

16.28

164.04

29.84

3.00

524.25

74.89

15.02

116.50

23.36

95.32

19.11

174.75

35.04

3.50

555.91

79.42

17.24

123.53

26.82

101.07

21.94

185.30

40.23

4.00

587.10

83.87

19.46

130.47

30.28

106.75

24.77

195.70

45.42

4.50

617.85

88.26

21.69

137.30

33.73

112.34

27.60

205.95

50.60

5.00

648.18

92.60

23.90

144.04

37.19

117.85

30.42

216.06

55.78

6.00

710.34

101.48

28.35

157.85

44.10

129.15

36.08

236.78

66.15

7.00

771.66

110.24

32.79

171.48

51.01

140.30

41.74

257.22

76.51

8.00

831.46

118.78

37.23

184.77

57.91

151.18

47.38

277.15

86.86

9.00

890.36

127.19

41.66

197.86

64.80

161.88

53.02

296.79

97.20

10.00

946.76

135.25

46.07

210.39

71.67

172.14

58.64

315.59

107.50

221

Lead in
Kms.

Cost
per
Trip

Steel, Cement,Stone
block,G.I.C.I.C.C.&A.C.
Pipes below mm/dia.steel
&plate Glass in packs and
distemper A.C.sheet &
fitting iron sheet
Unit M .Tonne
Fuel
L.F.7.00
Compo.
3
4

Tar bitumen, Roofing


Felt &Flooring
Asphalt etc.

Steam Coal (Form)

Mating , Thating
Bamboos & Ballies
Ceilings, Boards
Rubber ,PVC pipes

Unit M .Tonne
L.F. 4.50
5

Fuel
Compo.
6

Unit M .Tonne
L.F. 5.50
7

Fuel
Compo.
8

Unit M .Tonne
L.F.3.00
9

Fuel
Compo.
10

15.00

1161.44

165.92

67.82

258.10

105.50

211.17

86.32

387.15

158.25

20.00

1440.79

205.83

89.89

320.18

139.84

261.96

114.41

480.26

209.75

25.00

1720.14

245.73

111.97

382.25

174.17

312.75

142.50

573.38

261.26

30.00

1999.50

285.64

134.04

444.33

208.50

363.54

170.59

666.50

312.76

35.00

2127.94

303.99

155.36

472.88

241.67

386.90

197.73

709.31

362.51

40.00

2385.74

340.82

177.33

530.16

275.84

433.77

225.69

795.25

413.76

45.00

2643.53

377.65

199.29

587.45

310.01

480.64

253.64

881.18

465.01

50.00

2901.33

414.48

221.25

644.74

344.17

527.51

281.60

967.11

516.26

60.00

3416.92

488.13

265.18

759.31

412.51

621.26

337.51

1138.97

618.76

70.00

3932.51

561.79

309.11

873.89

480.84

715.00

393.42

1310.84

721.27

80.00

4448.10

635.44

353.04

988.47

549.18

808.74

449.33

1482.70

823.77

90.00

4963.69

709.10

396.97

1103.04

617.51

902.49

505.24

1654.56

926.27

100.00

5479.28

782.75

440.90

1217.62

685.85

996.23

561.15

1826.43

1028.77

125.00

6094.55

870.65

547.38

1354.35

851.48

1108.10

696.66

2031.52

1277.22

150.00

7248.79

1035.54

656.53

1610.84

1021.27

1317.96

835.59

2416.26

1531.91

175.00

8403.03

1200.43

765.69

1867.34

1191.07

1527.82

974.51

2801.01

1786.60

200.00

9557.26

1365.32

874.84

2123.84

1360.86

1737.68

1113.43

3185.75

2041.30

222

STATEMENT -C1 (2008-2009) PUNE REGION


Bricks/Modular
Bricks / Trade bricks
and
Empty Cement bags.
Lead in
Kms.

Cost
per
Trip

Tiles half round


Tiles / Roofing
tiles

Glass blocks
(Hollow)
100 mm
& 200 mm

Unit1000Nos.
L.F.2.00
3

Fuel
Compo.
4

Unit1000Nos.
L.F.3.20
5

Fuel
Compo.
6

Unit1000Nos.
L.F. 10.00
7

Fuel
Compo.
8

0.50

359.93

179.97

13.50

112.48

8.44

35.99

2.70

1.00

393.80

196.90

21.33

123.06

13.33

39.38

4.27

1.50

427.17

213.59

29.15

133.49

18.22

42.72

5.83

2.00

459.46

229.73

36.95

143.58

23.09

45.95

7.39

2.50

492.11

246.05

44.76

153.78

27.97

49.21

8.95

3.00

524.25

262.12

52.55

163.83

32.85

52.42

10.51

3.50

555.91

277.95

60.34

173.72

37.72

55.59

12.07

4.00

587.10

293.55

68.13

183.47

42.58

58.71

13.63

4.50

617.85

308.93

75.90

193.08

47.44

61.79

15.18

5.00

648.18

324.09

83.67

202.56

52.29

64.82

16.73

6.00

710.34

355.17

99.23

221.98

62.02

71.03

19.85

7.00

771.66

385.83

114.77

241.14

71.73

77.17

22.95

8.00

831.46

415.73

130.29

259.83

81.43

83.15

26.06

9.00

890.36

445.18

145.79

278.24

91.12

89.04

29.16

10.00

946.76

473.38

161.25

295.86

100.78

94.68

32.25

15.00

1161.44

580.72

237.38

362.95

148.36

116.14

47.48

20.00

1440.79

720.39

314.63

450.25

196.64

144.08

62.93

223

Bricks/Modular
Bricks / Trade bricks
and
Empty Cement bags.
Lead in
Kms.

Cost
per
Trip

Tiles half round


Tiles / Roofing
tiles

Glass blocks
(Hollow)
100 mm
& 200 mm

Unit1000Nos.
L.F.2.00
3

Fuel
Compo.
4

Unit1000Nos.
L.F.3.20
5

Fuel
Compo.
6

Unit1000Nos.
L.F. 10.00
7

Fuel
Compo.
8

25.00

1720.14

860.07

391.88

537.54

244.93

172.01

78.38

30.00

1999.50

999.75

469.14

624.84

293.21

199.95

93.83

35.00

2127.94

1063.97

543.76

664.98

339.85

212.79

108.75

40.00

2385.74

1192.87

620.64

745.54

387.90

238.57

124.13

45.00

2643.53

1321.77

697.52

826.10

435.95

264.35

139.50

50.00

2901.33

1450.66

774.39

906.66

484.00

290.13

154.88

60.00

3416.92

1708.46

928.15

1067.79

580.09

341.69

185.63

70.00

3932.51

1966.25

1081.90

1228.91

676.19

393.25

216.38

80.00

4448.10

2224.05

1235.65

1390.03

772.28

444.81

247.13

90.00

4963.69

2481.84

1389.41

1551.15

868.38

496.37

277.88

100.00

5479.28

2739.64

1543.16

1712.27

964.47

547.93

308.63

125.00

6094.55

3047.28

1915.82

1904.55

1197.39

609.46

383.16

150.00

7248.79

3624.39

2297.86

2265.25

1436.16

724.88

459.57

175.00

8403.03

4201.51

2679.90

2625.95

1674.94

840.30

535.98

200.00

9557.26

4778.63

3061.94

2986.64

1913.71

955.73

612.39

224

STATEMENT -C1 (2008-2009) PUNE REGION


S.W.Pipes
Lead in
Kms.

Cost
per
Trip

100mm

S.W.Pipes
150mm

Fuel
Compo.
4

Unit
100 mtrs.
L.F. 2.40
5

200mm

0.50

359.93

74.99

5.63

149.97

11.25

266.62

20.00

342.79

25.71

1.00

393.80

82.04

8.89

164.08

17.77

291.70

31.60

375.05

40.63

1.50

427.17

88.99

12.15

177.99

24.29

316.42

43.18

406.83

55.52

2.00

459.46

95.72

15.40

191.44

30.79

340.34

54.74

437.59

70.38

2.50

492.11

102.52

18.65

205.05

37.30

364.53

66.31

468.68

85.25

3.00

524.25

109.22

21.90

218.44

43.80

388.33

77.86

499.28

100.10

3.50

555.91

115.81

25.14

231.63

50.29

411.78

89.40

529.43

114.94

4.00

587.10

122.31

28.39

244.63

56.77

434.89

100.93

559.14

129.76

4.50

617.85

128.72

31.63

257.44

63.25

457.67

112.45

588.43

144.57

5.00

648.18

135.04

34.86

270.07

69.72

480.13

123.95

617.31

159.37

6.00

710.34

147.99

41.34

295.97

82.69

526.18

147.00

676.51

189.00

7.00

771.66

160.76

47.82

321.52

95.64

571.60

170.03

734.91

218.61

8.00

831.46

173.22

54.29

346.44

108.58

615.90

193.02

791.87

248.17

9.00

890.36

185.49

60.75

370.98

121.50

659.52

215.99

847.96

277.70

10.00

946.76

197.24

67.19

394.48

134.38

701.30

238.89

901.67

307.15

15.00

1161.44

241.97

98.91

483.93

197.82

860.32

351.67

1106.13

452.15

20.00

1440.79

300.16

131.10

600.33

262.19

1067.25

466.12

1372.18

599.30

225

Fuel
Compo.
6

Unit
100 mtrs.
L.F.1.35
7

250mm

Unit
100 mtrs.
L.F.4.80
3

Fuel
Compo.
8

Unit
100 mtrs.
L.F.1.05
9

Fuel
Compo.
10

S.W.Pipes
Lead in
Kms.

Cost
per
Trip

100mm

S.W.Pipes
150mm

Fuel
Compo.
4

Unit
100 mtrs.
L.F. 2.40
5

200mm

25.00

1720.14

358.36

163.28

716.73

326.57

1274.18

580.57

1638.23

746.45

30.00

1999.50

416.56

195.47

833.12

390.95

1481.11

695.02

1904.28

893.59

35.00

2127.94

443.32

226.57

886.64

453.14

1576.25

805.57

2026.61

1035.74

40.00

2385.74

497.03

258.60

994.06

517.20

1767.21

919.46

2272.13

1182.17

45.00

2643.53

550.74

290.63

1101.47

581.26

1958.17

1033.36

2517.65

1328.60

50.00

2901.33

604.44

322.66

1208.89

645.33

2149.13

1147.25

2763.17

1475.03

60.00

3416.92

711.86

386.73

1423.72

773.45

2531.05

1375.03

3254.21

1767.90

70.00

3932.51

819.27

450.79

1638.54

901.58

2912.97

1602.81

3745.24

2060.76

80.00

4448.10

926.69

514.86

1853.37

1029.71

3294.89

1830.60

4236.28

2353.62

90.00

4963.69

1034.10

578.92

2068.20

1157.84

3676.81

2058.38

4727.32

2646.49

100.00

5479.28

1141.52

642.98

2283.03

1285.97

4058.72

2286.16

5218.36

2939.35

125.00

6094.55

1269.70

798.26

2539.40

1596.52

4514.48

2838.26

5804.34

3649.19

150.00

7248.79

1510.16

957.44

3020.33

1914.89

5369.47

3404.24

6903.61

4376.88

175.00

8403.03

1750.63

1116.63

3501.26

2233.25

6224.46

3970.23

8002.88

5104.58

200.00

9557.26

1991.10

1275.81

3982.19

2551.62

7079.45

4536.21

9102.15

5832.27

226

Fuel
Compo.
6

Unit
100 mtrs.
L.F.1.35
7

250mm

Unit
100 mtrs.
L.F.4.80
3

Fuel
Compo.
8

Unit
100 mtrs.
L.F.1.05
9

Fuel
Compo.
10

STATEMENT -C1 (2008-2009) PUNE REGION


S.W.Pipes
Lead in
Kms.

Cost
per
Trip

250mm

S.W.Pipes
300mm

Fuel
Compo.
4

Unit
100 mtrs.
L.F. 0.66
5

350mm

0.50

359.93

428.49

32.14

545.35

40.91

856.99

64.29

1333.09

100.00

1.00

393.80

468.81

50.78

596.66

64.63

937.61

101.56

1458.51

157.99

1.50

427.17

508.54

69.40

647.23

88.33

1017.08

138.80

1582.12

215.91

2.00

459.46

546.98

87.97

696.16

111.97

1093.96

175.95

1701.72

273.70

2.50

492.11

585.84

106.56

745.62

135.63

1171.69

213.13

1822.63

331.53

3.00

524.25

624.11

125.13

794.32

159.26

1248.21

250.26

1941.66

389.29

3.50

555.91

661.79

143.68

842.28

182.86

1323.59

287.36

2058.91

447.00

4.00

587.10

698.93

162.21

889.55

206.44

1397.86

324.41

2174.45

504.64

4.50

617.85

735.54

180.72

936.14

230.00

1471.07

361.43

2288.34

562.23

5.00

648.18

771.64

199.21

982.08

253.54

1543.28

398.42

2400.65

619.76

6.00

710.34

845.64

236.26

1076.27

300.69

1691.28

472.51

2630.89

735.02

7.00

771.66

918.64

273.27

1169.18

347.79

1837.28

546.53

2857.99

850.17

8.00

831.46

989.84

310.22

1259.79

394.82

1979.68

620.43

3079.50

965.12

9.00

890.36

1059.95

347.13

1349.03

441.80

2119.90

694.26

3297.62

1079.96

10.00

946.76

1127.09

383.94

1434.48

488.65

2254.18

767.87

3506.51

1194.47

15.00

1161.44

1382.66

565.19

1759.75

719.33

2765.32

1130.38

4301.61

1758.37

20.00

1440.79

1715.22

749.12

2183.01

953.43

3430.45

1498.25

5336.26

2330.61

227

Fuel
Compo.
6

Unit
100 mtrs.
L.F.0.42
7

Fuel
Compo.
8

400mm
Unit
100 mtrs.
Fuel
L.F.0.27
Compo.
9
10

Unit
100 mtrs.
L.F..84
3

S.W.Pipes
Lead in
Kms.

Cost
per
Trip

250mm

S.W.Pipes
300mm

Fuel
Compo.
4

Unit
100 mtrs.
L.F. 0.66
5

350mm
Fuel
Compo.
6

Unit
100 mtrs.
L.F.0.42
7

Fuel
Compo.
8

400mm
Unit
100 mtrs.
Fuel
L.F.0.27
Compo.
9
10

Unit
100 mtrs.
L.F..84
3

25.00

1720.14

2047.79

933.06

2606.28

1187.53

4095.58

1866.11

6370.90

2902.84

30.00

1999.50

2380.35

1116.99

3029.54

1421.62

4760.70

2233.98

7405.54

3475.08

35.00

2127.94

2533.26

1294.67

3224.15

1647.76

5066.53

2589.34

7881.26

4027.87

40.00

2385.74

2840.16

1477.71

3614.75

1880.72

5680.32

2955.42

8836.06

4597.32

45.00

2643.53

3147.06

1660.75

4005.35

2113.68

6294.12

3321.50

9790.86

5166.78

50.00

2901.33

3453.96

1843.79

4395.95

2346.64

6907.92

3687.58

10745.65

5736.24

60.00

3416.92

4067.76

2209.87

5177.15

2812.56

8135.51

4419.74

12655.25

6875.15

70.00

3932.51

4681.56

2575.95

5958.34

3278.48

9363.11

5151.90

14564.84

8014.07

80.00

4448.10

5295.35

2942.03

6739.54

3744.40

10590.71

5884.06

16474.43

9152.98

90.00

4963.69

5909.15

3308.11

7520.74

4210.32

11818.30

6616.22

18384.03

10291.90

100.00

5479.28

6522.95

3674.19

8301.93

4676.24

13045.90

7348.38

20293.62

11430.81

125.00

6094.55

7255.42

4561.49

9234.17

5805.53

14510.84

9122.97

22572.42

14191.29

150.00

7248.79

8629.51

5471.10

10983.01

6963.22

17259.02

10942.21

26847.37

17021.21

175.00

8403.03

10003.60

6380.72

12731.86

8120.92

20007.20

12761.44

31122.32

19851.14

200.00

9557.26

11377.69

7290.34

14480.70

9278.62

22755.38

14580.68

35397.26

22681.06

228

STATEMENT -C1 (2008-2009) PUNE REGION


R.C.C.Pipes, Steel Cylinder, C.I. Pipes Unreinforced cement pipes & prestressed concrete pipes.
Lead in
Kms.

Cost
per
Trip

100mm
Unit
100 mtrs.
Fuel
L.F.2.92
Compo.
3
4

125mm
Unit
100 mtrs.
Fuel
L.F.2.196
Compo.
5
6

150mm
Unit
100 mtrs.
Fuel
L.F.1.83
Compo.
7
8

200mm
Unit
100 mtrs.
L.F.1.098
9

Fuel
Compo.
10

250mm
Unit
100 mtrs.
L.F.0.805
11

Fuel
Compo.
12

300mm
Unit
100 mtrs.
Fuel
L.F.0.622
Compo.
13
14

0.50

359.93

123.27

9.25

163.90

12.30

196.69

14.75

327.81

24.59

447.12

33.54

578.67

43.41

1.00

393.80

134.86

14.61

179.33

19.42

215.19

23.31

358.65

38.85

489.19

52.99

633.12

68.58

1.50

427.17

146.29

19.96

194.52

26.55

233.43

31.86

389.05

53.09

530.65

72.42

686.77

93.72

2.00

459.46

157.35

25.31

209.23

33.65

251.07

40.38

418.46

67.30

570.76

91.80

738.69

118.81

2.50

492.11

168.53

30.66

224.09

40.76

268.91

48.91

448.19

81.52

611.32

111.20

791.17

143.91

3.00

524.25

179.54

36.00

238.73

47.86

286.47

57.44

477.46

95.73

651.24

130.57

842.84

168.99

3.50

555.91

190.38

41.33

253.14

54.96

303.77

65.95

506.29

109.92

690.57

149.92

893.74

194.03

4.00

587.10

201.06

46.66

267.35

62.05

320.82

74.46

534.70

124.09

729.32

169.26

943.89

219.06

4.50

617.85

211.59

51.99

281.35

69.13

337.62

82.95

562.71

138.25

767.52

188.57

993.33

244.05

5.00

648.18

221.98

57.31

295.16

76.20

354.19

91.44

590.32

152.40

805.19

207.87

1042.08

269.03

6.00

710.34

243.27

67.96

323.47

90.37

388.16

108.45

646.94

180.74

882.41

246.53

1142.02

319.06

7.00

771.66

264.27

78.61

351.39

104.53

421.67

125.43

702.78

209.06

958.58

285.15

1240.61

369.04

8.00

831.46

284.75

89.24

378.63

118.66

454.35

142.39

757.25

237.32

1032.87

323.70

1336.76

418.94

9.00

890.36

304.92

99.86

405.45

132.78

486.53

159.34

810.89

265.56

1106.04

362.22

1431.44

468.79

10.00

946.76

324.23

110.45

431.13

146.86

517.35

176.23

862.26

293.72

1176.10

400.63

1522.12

518.50

15.00

1161.44

397.75

162.59

528.89

216.19

634.66

259.43

1057.77

432.39

1442.78

589.76

1867.26

763.28

20.00

1440.79

493.42

215.50

656.10

286.55

787.32

343.86

1312.19

573.10

1789.80

781.69

2316.38

1011.68

229

R.C.C.Pipes, Steel Cylinder, C.I. Pipes Unreinforced cement pipes & prestressed concrete pipes.
Lead in
Kms.

Cost
per
Trip

100mm
Unit
100 mtrs.
Fuel
L.F.2.92
Compo.
3
4

125mm
Unit
100 mtrs.
Fuel
L.F.2.196
Compo.
5
6

150mm
Unit
100 mtrs.
Fuel
L.F.1.83
Compo.
7
8

200mm
Unit
100 mtrs.
L.F.1.098
9

Fuel
Compo.
10

250mm
Unit
100 mtrs.
L.F.0.805
11

Fuel
Compo.
12

300mm
Unit
100 mtrs.
Fuel
L.F.0.622
Compo.
13
14

25.00

1720.14

589.09

268.41

783.31

356.91

939.97

428.29

1566.61

713.81

2136.82

973.62

2765.50

1260.08

30.00

1999.50

684.76

321.33

910.52

427.26

1092.62

512.72

1821.03

854.53

2483.85

1165.55

3214.62

1508.47

35.00

2127.94

728.75

372.44

969.01

495.23

1162.81

594.28

1938.02

990.46

2643.40

1350.96

3421.13

1748.43

40.00

2385.74

817.03

425.10

1086.40

565.24

1303.68

678.29

2172.80

1130.49

2963.65

1541.96

3835.59

1995.62

45.00

2643.53

905.32

477.75

1203.79

635.26

1444.55

762.31

2407.59

1270.52

3283.89

1732.96

4250.05

2242.82

50.00

2901.33

993.60

530.41

1321.19

705.28

1585.42

846.33

2642.37

1410.55

3604.13

1923.96

4664.51

2490.01

60.00

3416.92

1170.18

635.72

1555.97

845.31

1867.17

1014.37

3111.95

1690.61

4244.62

2305.95

5493.43

2984.39

70.00

3932.51

1346.75

741.03

1790.76

985.34

2148.91

1182.40

3581.52

1970.67

4885.10

2687.95

6322.36

3478.78

80.00

4448.10

1523.32

846.34

2025.54

1125.37

2430.65

1350.44

4051.09

2250.73

5525.59

3069.94

7151.28

3973.16

90.00

4963.69

1699.89

951.65

2260.33

1265.40

2712.40

1518.48

4520.66

2530.79

6166.07

3451.94

7980.20

4467.54

100.00

5479.28

1876.46

1056.96

2495.12

1405.43

2994.14

1686.51

4990.23

2810.85

6806.56

3833.94

8809.13

4961.93

125.00

6094.55

2087.18

1312.21

2775.30

1744.83

3330.36

2093.80

5550.60

3489.66

7570.87

4759.81

9798.32

6160.21

150.00

7248.79

2482.46

1573.88

3300.91

2092.77

3961.09

2511.33

6601.81

4185.54

9004.71

5708.98

11654.00

7388.63

175.00

8403.03

2877.75

1835.55

3826.51

2440.71

4591.82

2928.86

7653.03

4881.43

10438.54

6658.14

13509.69

8617.05

200.00

9557.26

3273.03

2097.22

4352.12

2788.65

5222.55

3346.39

8704.25

5577.31

11872.37

7607.31

15365.37

9845.48

230

STATEMENT -C1 (2008-2009) PUNE REGION


R.C.C.Pipes, Steel Cylinder, C.I. Pipes Unreinforced cement pipes & prestressed concrete pipes.
Lead in
Kms.

Cost
per
Trip

0.50

359.93

655.62

49.18

1199.78

90.00

1228.44

92.15

2399.56

180.00

7198.68

540.01

14397.36

1080.02

1.00

393.80

717.30

77.70

1312.66

142.19

1344.02

145.59

2625.32

284.38

7875.96

853.14

15751.91

1706.29

1.50

427.17

778.09

106.19

1423.91

194.32

1457.92

198.97

2847.81

388.65

8543.44

1165.94

17086.87

2331.87

2.00

459.46

836.91

134.61

1531.55

246.33

1568.14

252.21

3063.10

492.66

9189.30

1477.97

18378.60

2955.95

2.50

492.11

896.37

163.05

1640.36

298.38

1679.55

305.50

3280.73

596.75

9842.18

1790.26

19684.35

3580.51

3.00

524.25

954.92

191.46

1747.50

350.36

1789.24

358.74

3494.99

700.73

10484.98

2102.19

20969.95

4204.38

3.50

555.91

1012.58

219.83

1853.02

402.30

1897.29

411.91

3706.04

804.60

11118.12

2413.79

22236.23

4827.57

4.00

587.10

1069.40

248.18

1957.00

454.18

2003.76

465.03

3914.00

908.35

11742.01

2725.06

23484.01

5450.12

4.50

617.85

1125.41

276.51

2059.50

506.00

2108.71

518.09

4119.01

1012.01

12357.02

3036.03

24714.04

6072.05

5.00

648.18

1180.65

304.80

2160.59

557.78

2212.20

571.11

4321.17

1115.57

12963.52

3346.70

25927.04

6693.39

6.00

710.34

1293.88

361.48

2367.80

661.51

2424.37

677.32

4735.60

1323.03

14206.79

3969.09

28413.58

7938.18

7.00

771.66

1405.57

418.11

2572.19

765.15

2633.64

783.43

5144.38

1530.30

15433.13

4590.89

30866.26

9181.78

8.00

831.46

1514.51

474.65

2771.55

868.61

2837.76

889.36

5543.09

1737.21

16629.27

5211.64

33258.55

10423.29

9.00

890.36

1621.78

531.13

2967.86

971.96

3038.77

995.18

5935.72

1943.92

17807.17

5831.76

35614.34

11663.52

10.00

946.76

1724.51

587.44

3155.86

1075.02

3231.25

1100.71

6311.71

2150.05

18935.14

6450.14

37870.29

12900.29

15.00

1161.44

2115.55

864.77

3871.45

1582.54

3963.94

1620.34

7742.90

3165.07

23228.71

9495.21

46457.42

18990.42

20.00

1440.79

2624.39

1146.20

4802.63

2097.55

4917.37

2147.66

9605.26

4195.09

28815.78

12585.28

57631.56

25170.56

350 & 400 MM dia.


Unit Cum
100 mtrs.
Fuel
L.F.0.549
Compo.
3
4

450 & 500 MM dia.


Unit
100 mtrs.
Fuel
L.F0.300
Compo.
5
6

600 MM dia.
800,900 & 1000 MM dia.
1200 MM dia.
Unit
Unit
Unit
100 mtrs.
Fuel
100 mtrs.
Fuel
100 mtrs.
Fuel
L.F.0.293
Compo.
L.F.0.15
Compo.
L.F0.05
Compo.
7
8
9
10
11
12

231

1800 &2000 MM dia.


Unit
100 mtrs.
Fuel
L.F.0.025
Compo.
13
14

R.C.C.Pipes, Steel Cylinder, C.I. Pipes Unreinforced cement pipes & prestressed concrete pipes.
350 & 400 MM dia.
Unit Cum
100 mtrs.
Fuel
L.F.0.549
Compo.
3
4

450 & 500 MM dia.


Unit
100 mtrs.
Fuel
L.F0.300
Compo.
5
6

600 MM dia.
800,900 & 1000 MM dia.
1200 MM dia.
Unit
Unit
Unit
100 mtrs.
Fuel
100 mtrs.
Fuel
100 mtrs.
Fuel
L.F.0.293
Compo.
L.F.0.15
Compo.
L.F0.05
Compo.
7
8
9
10
11
12

1800 &2000 MM dia.


Unit
100 mtrs.
Fuel
L.F.0.025
Compo.
13
14

Lead in
Kms.

Cost
per
Trip

25.00

1720.14

3133.23

1427.63

5733.81

2612.56

5870.79

2674.97

11467.62

5225.12

34402.85

15675.35

68805.70

31350.70

30.00

1999.50

3642.07

1709.05

6664.99

3127.57

6824.22

3202.29

13329.97

6255.14

39989.92

18765.42

79979.83

37530.83

35.00

2127.94

3876.03

1980.92

7093.14

3625.08

7262.60

3711.69

14186.27

7250.16

42558.82

21750.48

85117.63

43500.97

40.00

2385.74

4345.60

2260.98

7952.45

4137.59

8142.44

4236.44

15904.91

8275.18

47714.72

24825.55

95429.44

49651.10

45.00

2643.53

4815.17

2541.04

8811.77

4650.10

9022.29

4761.20

17623.54

9300.21

52870.62

27900.62 105741.24 55801.24

50.00

2901.33

5284.75

2821.10

9671.09

5162.61

9902.14

5285.95

19342.17

10325.23

58026.52

30975.69 116053.04 61951.38

60.00

3416.92

6223.89

3381.22

11389.72

6187.64

11661.83

6335.47

22779.44

12375.28

68338.33

37125.83 136676.65 74251.65

70.00

3932.51

7163.04

3941.34

13108.35

7212.66

13421.52

7384.98

26216.71

14425.32

78650.13

43275.96 157300.26 86551.92

80.00

4448.10

8102.18

4501.47

14826.99

8237.68

15181.22

8434.49

29653.98

16475.37

88961.93

49426.10 177923.86 98852.20

90.00

4963.69

9041.32

5061.59

16545.62

9262.71

16940.91

9484.00

33091.25

18525.41

99273.74

55576.24 198547.47 111152.47

100.00

5479.28

9980.47

5621.71

18264.26

10287.73

18700.60

10533.51

36528.51

20575.46 109585.54 61726.37 219171.08 123452.74

125.00

6094.55

11101.19

6979.32

20315.18

12772.16

20800.53

13077.30

40630.36

25544.32 121891.08 76632.95 243782.16 153265.91

150.00

7248.79

13203.62

8371.09

24162.63

15319.09

24739.90

15685.08

48325.26

30638.18 144975.79 91914.54 289951.59 183829.09

175.00

8403.03

15306.06

9762.85

28010.08

17866.02

28679.27

18292.86

56020.17

35732.04 168060.51 107196.13 336121.01 214392.26

200.00

9557.26

17408.49

11154.62

31857.54

20412.95

32618.64

20900.64

63715.07

40825.91 191145.22 122477.72 382290.44 244955.44

232

STATEMENT -C1 (2008-2009) PUNE REGION

Lead in
Kms.

Cost
per
Trip

50mm

Asbestos Cement Pipes


80mm
100mm
Unit
Unit
100 mtrs.
Fuel
100 mtrs.
Fuel
L.F. 4.026
Compo.
L.F.2.928
Compo.
5
6
7
8

150mm
Unit
100 mtrs.
Fuel
L.F1.83
Compo.
9
10

Unit
100 mtrs.
L.F.6.58
3

0.50

359.93

54.70

4.10

89.40

6.71

122.93

9.22

196.69

14.75

1.00

393.80

59.85

6.48

97.81

10.60

134.49

14.57

215.19

23.31

1.50

427.17

64.92

8.86

106.10

14.48

145.89

19.91

233.43

31.86

2.00

459.46

69.83

11.23

114.12

18.36

156.92

25.24

251.07

40.38

2.50

492.11

74.79

13.60

122.23

22.23

168.07

30.57

268.91

48.91

3.00

524.25

79.67

15.97

130.22

26.11

179.05

35.90

286.47

57.44

3.50

555.91

84.48

18.34

138.08

29.98

189.86

41.22

303.77

65.95

4.00

587.10

89.22

20.71

145.83

33.84

200.51

46.53

320.82

74.46

4.50

617.85

93.90

23.07

153.47

37.71

211.01

51.84

337.62

82.95

5.00

648.18

98.51

25.43

161.00

41.56

221.37

57.15

354.19

91.44

6.00

710.34

107.95

30.16

176.44

49.29

242.60

67.78

388.16

108.45

7.00

771.66

117.27

34.89

191.67

57.02

263.54

78.40

421.67

125.43

8.00

831.46

126.36

39.60

206.52

64.72

283.97

89.00

454.35

142.39

9.00

890.36

135.31

44.31

221.15

72.43

304.08

99.59

486.53

159.34

10.00

946.76

143.88

49.01

235.16

80.11

323.35

110.15

517.35

176.23

15.00

1161.44

176.51

72.15

288.48

117.92

396.67

162.14

634.66

259.43

20.00

1440.79

218.96

95.63

357.87

156.30

492.07

214.91

787.32

343.86

Fuel
Compo.
4

233

Lead in
Kms.

Cost
per
Trip

50mm

Asbestos Cement Pipes


80mm
100mm
Unit
Unit
100 mtrs.
Fuel
100 mtrs.
Fuel
L.F. 4.026
Compo.
L.F.2.928
Compo.
5
6
7
8

150mm
Unit
100 mtrs.
Fuel
L.F1.83
Compo.
9
10

Unit
100 mtrs.
L.F.6.58
3

25.00

1720.14

261.42

119.11

427.26

194.68

587.48

267.68

939.97

428.29

30.00

1999.50

303.87

142.59

496.65

233.05

682.89

320.45

1092.62

512.72

35.00

2127.94

323.40

165.28

528.55

270.13

726.76

371.42

1162.81

594.28

40.00

2385.74

362.57

188.64

592.58

308.32

814.80

423.93

1303.68

678.29

45.00

2643.53

401.75

212.01

656.61

346.51

902.85

476.45

1444.55

762.31

50.00

2901.33

440.93

235.38

720.65

384.70

990.89

528.96

1585.42

846.33

60.00

3416.92

519.29

282.11

848.71

461.08

1166.98

633.98

1867.17

1014.37

70.00

3932.51

597.65

328.84

976.78

537.46

1343.07

739.00

2148.91

1182.40

80.00

4448.10

676.00

375.58

1104.84

613.84

1519.16

844.02

2430.65

1350.44

90.00

4963.69

754.36

422.31

1232.91

690.22

1695.25

949.05

2712.40

1518.48

100.00

5479.28

832.72

469.05

1360.97

766.60

1871.34

1054.07

2994.14

1686.51

125.00

6094.55

926.22

582.32

1513.80

951.73

2081.47

1308.62

3330.36

2093.80

150.00

7248.79

1101.64

698.44

1800.49

1141.51

2475.68

1569.58

3961.09

2511.33

175.00

8403.03

1277.06

814.56

2087.19

1331.30

2869.89

1830.54

4591.82

2928.86

200.00

9557.26

1452.47

930.68

2373.89

1521.08

3264.09

2091.49

5222.55

3346.39

Fuel
Compo.
4

234

STATEMENT -C2 (2008-2009) PUNE REGION


Cost of Carriage by
Collies (Mazd. Rs. 170/ day)
Lead or
Total Amount
Distance
Per Cum.
in Metre
Rs.
1
2

Lead or
Distance
in Metre
3

Cost of Carrage by cart


Hire Charges of Rs. 230/Day
Total Amount on
Total Amount
Waight Basis i.e.
Per Cum.
Rs.
per tonne Col.4/0.557
5
4

12.75

100

27.02

15.05

10

16.03

125

28.45

15.85

15

19.72

150

31.72

17.67

20

23.24

175

33.78

18.82

25

26.27

200

37.11

20.67

30

30.38

225

39.44

21.97

35

34.44

250

40.07

22.32

40

36.34

275

44.40

24.73

45

39.31

300

46.84

26.09

50

43.61

325

49.11

27.35

55

46.53

350

51.80

28.85

60

49.63

375

54.18

30.18

65

53.92

400

56.87

31.68

70

56.01

425

59.20

32.97

75

59.88

450

61.84

34.44

80

62.97

475

64.22

35.77

85

67.08

500

66.91

37.27

90

69.99

95

73.28

100

77.10

235

STATEMENT -C3 (2008-2009) PUNE REGION


Stacking Charges for Different Materials 2008-2009(Pune Region)
Mazdoor Rs.170.00/day
Sr.No.

Material

Unit

Stacking
Charges

Restacking
Charges
(col .4*1.2)
5

Cement

M.T.

23.89

28.67

Steel

M.T.

23.89

28.67

Steam Coal C.I. Sheet(all sorts)


A.C.Sheets ( all types)

M.T.

23.89

28.67

Mnglore Tiles.

1000 Nos.

23.89

Bricks

1000 Nos.

23.89

Blasted Boulders, Rubble ,Shingle

Cu.M.

23.89

Metal of various sizes

Cu.M.

23.89

Asphalt

M.T.

25.50

Sand, Soft Murum, Hard Murum and Avarge Murum

Cu.M.

17.05

10

Headers,Corner Stones, Ridge Tiles,Boundry


Stones , Fase Stones Km. stones

1000 Nos.

12.95

11

Timber

Cu.M.

12.49

12

Shahabad stones ,Slabs and other paving Material

Sq.M.

12.49

236

You might also like