PROJECT NAME
Philippine Arena Aerial View Site Scenery March 13 Photo 001. jpeg GENERAL OVERVIEW
Project Monthly Report (March 1 ~ March 31, 2013)
PROJECT NAME
Philippine Arena Site / Chiller Plant Installation of r ebars at groun d floor prior to schedule of po uring Mar.13 Photo 002. jpeg
Location Description
RMC
PROJECT NAME
Location Description
PROJECT NAME
Location Description
Steel structure
PROJECT NAME
Location Description
Steel structure
PROJECT NAME
Location Description
PROJECT NAME
Philippine Arena Site/Level 2 Skimcoat finish ing of beams and slab soffit at level 2
Location Description
PROJECT NAME
Philippine Arena Site Installed sak bi oduct at roof Grid Line 16-2 0
Location Description
PROJECT NAME
Location Description
PROJECT NAME
Philippine Arena Site /Level 2 Installed Drain and Soil Pipe a t Grid Line 1 ~ 9 Mar.13 Photo 010. jpeg Mechanical works
Location Description
10
PROJECT NAME
Location Description
Steel Structure