Kharafi National Project : 1670 - Ministy of Education South Surra

Pre-shipment Inscpection Checklist


LPO#40081610, Supply of Cooling Tower Vendor: Atlas Blue Co.

Equipment Discription Cooling Tower Type Manufacturer Qty Capacity per Cell HWT CWT EwbT

Counter Flow Tower Engineering - USA 2 Cooling Towers x 3 Cells (each) 3300 GPM 100 oF 90 oF 85 oF

Items to be Inspected

Inspection Results

A- Exterior 1-Steel Support Grillage 2-Cold Water Collection Basin Material Stainless Steel AISI Type 316 L Components / Connections Equalizer Opening Drain / Clean-out Outlet Fange drilled 125 psing 16" Anit-Vortex Hood Stainless Steel Debris Screen 2 1/2" Make-up Connection 4" Over Flow Stand Pipe Basin Depth Drop Sump Depth below basin floor 3-FibreGlass Structure Structural Members Structural Hardware (connectors, fasteners, washers, Inspected By: Name: Company: Signature Date: Pultuded FRP, Type:I, II, IV with synthitic polyster fiber300 series Stainless Steel 1 feet 3 feet

Name: Company: Signature Date:

Name: Company: Signature Date:

Page 1 of 9

Kharafi National Project : 1670 - Ministy of Education South Surra

Pre-shipment Inscpection Checklist


LPO#40081610, Supply of Cooling Tower Vendor: Atlas Blue Co.

Items to be Inspected

Inspection Results

4-Air Inlet Louvers Casing FRP 12 oz.

Stainless Steel Structural Hardware (connectors, fasteners, Protection washers, 5-UV and Corrosion outer Layer Second Layer 6-Exterior Casing Material Panels Color Hardware 1 3/4" Pultuded FRP double wall construction panels Light grey SS series 300 screws and heads neoprene washers 7-Wind Walls Material Panels Color Hardware 22'-3" & 22'-0" shipment length 1 3/4" Pultuded FRP double wall construction panels Light grey SS series 300 screws and heads neoprene washers 8-Partition Walls Material Panels Color Hardware 20'-6" shipment length 1 3/4" Pultuded FRP double wall construction panels Light grey SS series 300 screws and heads neoprene washers Inspected By: Name: Company: Signature Date: Name: Company: Signature Date: Name: Company: Signature Date: 10-15 mil thick synthetic or polyster fiber sufacing veil 30 mils thickness polymric veil

Page 2 of 9

Kharafi National Project : 1670 - Ministy of Education South Surra

Pre-shipment Inscpection Checklist


LPO#40081610, Supply of Cooling Tower Vendor: Atlas Blue Co.

Items to be Inspected

Inspection Results

9-End Walls Material Panels Color Hardware

20'-6" shipment length 1 3/4" Pultuded FRP double wall construction panels Light grey SS series 300 screws and heads neoprene washers

10-Parapet Wall Material Panels Color Hardware 1 3/4" Pultuded FRP double wall construction panels Light grey SS series 300 screws and heads neoprene washers 11-Fan Deck Material Hardware 12-Fan Stack Material Profile High quality handlaid FRP + 17 mils UV gel coat protection Curved bell inlet and velocity recovery exit Pultuded FRP deck panels + UV protection SS 304 fasteners

Bolted in-place removable access panel Hardware Bolts spans SS series 300 18" centers maximum

13-Posts /HandRail including SS toe and knee boards Inspected By: Name: Company: Signature Date: Name: Company: Signature Date: Name: Company: Signature Date:

Page 3 of 9

Kharafi National Project : 1670 - Ministy of Education South Surra

Pre-shipment Inscpection Checklist


LPO#40081610, Supply of Cooling Tower Vendor: Atlas Blue Co.

Items to be Inspected

Inspection Results

B- Internals 1-Fill Media Material Sheets Flute Height Flutes Arrangement 2-Hot Water Distribution Side Wall Entry Header Side Laterals fittings Nozzles Distribution Header Hardware 3-Drift Eliminator Screw in type, orifice 0.81 color Pink QTY 120/Cell FRP pipe with 16" flange connection clas 150 SS Brentwood Industries CF150 MAX-15 3 pass design / senusoidal-shaped corrugation Cellular Material Stiffener Sheet FRP Hatch Max. Drift Rate Inspected By: Name: Company: Signature Date: Name: Company: Signature Date: Name: Company: Signature Date: 0.0015% of tower flow rate PVC corrugated sheet 15 mil (0.38mm) Thickness 15 mil (0.38mm) PVC SDR-35 Brentwood OF21MA PVC - cellular type Wave formed 20 mils thickness 0.818 inch cross-corrugated with vertical offset FRP Header, PVC SDR-35 Laterals, ABS Nozzles

Page 4 of 9

Kharafi National Project : 1670 - Ministy of Education South Surra

Pre-shipment Inscpection Checklist


LPO#40081610, Supply of Cooling Tower Vendor: Atlas Blue Co.

Items to be Inspected

Inspection Results

4-Fan Motor Manufacturer Horsepower Frame Volts/Phase/Freq. Speeds Windings Enclosure Service Factor Insulation Siemens 50/12.5 HP 365T 415V/3PH/50Hz 1485 / 740 RPM Single TEFC - Severe Duty 1.0 @ 65oC ambient H

Weather Proof elect. Connection boxes epoxy coating Neoprene rubber mounts vibration isolators Inspected By: Name: Company: Signature Date: Name: Company: Signature Date: Name: Company: Signature Date:

Page 5 of 9

Kharafi National Project : 1670 - Ministy of Education South Surra

Pre-shipment Inscpection Checklist


LPO#40081610, Supply of Cooling Tower Vendor: Atlas Blue Co.

Items to be Inspected

Inspection Results

5-Speed Reducer Manufacturer Model Gear Ratio Reduction Type Rated HP Type grey iron casting Oil fill line Vent line Oil Level Sight Glass gage Epoxy Coating Gears Gear Housing Thrust Bearing Life Lubrication System input and output shafts seals Spiral bevel/helical -nikel alloy steel grey iron casting 200,000 hours Splash dual spring loaded, double lipped Labyrinth plate for out put shaft also Oil Charge for every 6 month changing(---Litres) Inspected By: Name: Company: Signature Date: Name: Company: Signature Date: Name: Company: Signature Date: SS SS 6 to 1 Single 54 (S.F. =2) right angle gear Amarillo Gear Co. 135

Page 6 of 9

Kharafi National Project : 1670 - Ministy of Education South Surra

Pre-shipment Inscpection Checklist


LPO#40081610, Supply of Cooling Tower Vendor: Atlas Blue Co.

Items to be Inspected

Inspection Results

6-Mechanical Equipmet Support Material 7-Drive Connection Manufacturer Model Rated HP Torque Tube Material Hubs Material Single piece welded steel assembly, hot dipped Rexonord / Addax LR375.275SS 79.8 (S.F. = 2) Composite Fiberglass 316 Stainless Steel

Driver Shaft Guards at gear End SS Driver Shaft Guards at Motor End FRP 8-Fan Assembly Manufacturer Model Fan Diameter No. of Blades Tip Speed Fan Speed Type Manual adjustable pitch Material Air Seal Disc Harware non corrosive spacer sleeve Inspected By: Name: Company: Signature Date: Name: Company: Signature Date: Name: Company: Signature Date: Cast Aluminum Alloy FRP 304 SS propeller Cofimco 4572-8-31N/B6T 15 feet 8 11663.2 fpm 247.5 rpm

Page 7 of 9

Kharafi National Project : 1670 - Ministy of Education South Surra

Pre-shipment Inscpection Checklist


LPO#40081610, Supply of Cooling Tower Vendor: Atlas Blue Co.

Items to be Inspected

Inspection Results

9-Controls Electronic vibration switch housed in weather proof Power Supply Oil Level Switch Metrix Model 440SR 230 Volt Murphy EL-150-EX

Factory installed on gear reducer 10-External Caged Ladders Material SS (AISI Type 316) Flat bar with 450mm min. width and 300mm max. spacing 63.5mm X 9.5mm flat bar 1" 100x100x10 mm 25 x 3 mm SS flats for ladder exceeding 2.5m in height 6 Nos FRP 3 x 3 ft FRP each cell + 3x3 ft grating Series 300 SS Flowline "Smart-Trak" sensor with stilling well 6 Nos 6 Nos

main rail rungs Base plates Safety Cages 11-Internal Ladders Material 12-Plenum Access 13-Hardware 14-Water Level Sensor

15-Float Valve for makeup line 16-Speciality Connectors/ discharge chute extension

Inspected By: Name: Company: Signature Date: Name: Company: Signature Date: Name: Company: Signature Date:

Page 8 of 9

Kharafi National Project : 1670 - Ministy of Education South Surra

Pre-shipment Inscpection Checklist


LPO#40081610, Supply of Cooling Tower Vendor: Atlas Blue Co.

Items to be Inspected

Inspection Results

C-Spare Parts Fan motor bearing full charge gear Lubrication oil Fan Blade Assembly Gear Box Shaft 1 Set 1 each gear 1 No. 2 Nos. 1 Set

D-Warranty 2 years from subatantial completion date June 2014 five years for the geares speed reducer 15 years for PVC elements

E-L/C Documents Packing List 3 copies

Test Certificate for CT components one original + 2 copies Bill of Lading triplicate Certificate of origin in duplicate (issued by the Chamber of Commerce) Ivoice Inspection Realease Note one original + 2 copies original Original

Inspected By: Name: Company: Signature Date: Name: Company: Signature Date: Name: Company: Signature Date:

Page 9 of 9

You might also like