NOTICE OF PROPOSAL TO ISSUE CERTIFICATES UNDER SECTIONS 131 (4A) AND 132(3) OF THE PLANNING ACT 2008 PLANNING ACT 2008 (AS AMENDED) THAMES WATER UTILITIES LIMITED DRAFT THAMES WATER UTILITIES LIMITED (THAMES TIDEWAY TUNNEL) DEVELOPMENT CONSENT ORDER 2013.

ADVERTISEMENT
London Borough and site name
London Borough of Wandsworth Falconbrook Pumping Station

Land or foreshore

Plot Area Number (m)


215 17

Total area of site

Plot Description
Hardstanding and access road (off Newcomen Road)

Purpose for which land and rights are required


Rights required for access: Right of access to the permanent works for the purpose of maintaining and Work Nos. 10a, 10b and 10c

Certicate under Section 131(4A) or 132(3)


s.132(3) Temporary at surface level, Permanent rights

Proposed Certicates in Respect of Compulsory Acquisition of Open Space and Rights over Open Space pursuant to Section 131(4A) and Section 132(3)
1.  Thames Water Utilities Limited (the Applicant) has made the above application under the Planning Act 2008 (the Act) for an order granting development consent for the Draft Thames Water Utilities Limited (Thames Tideway Tunnel) Development Consent Order (the Order). If made, the Order will authorise the compulsory acquisition of land and rights, by the creation of new rights (the Order Rights), over land forming part of open space as dened in the Act, that is any land laid out as a public garden, or used for the purposes of public recreation, or land being disused burial ground (the Order Land). 2.  The Order will be subject to special parliamentary procedure, to the extent that it authorises the compulsory acquisition of land and rights over land to which section 131 and 132 of the Act applies, unless the Secretary of State issues a certicate in accordance with the provisions of section 131 and 132 of the Act (the Certicates). The Secretary of State has been asked by the Applicant to certify that:  (i)  under section 131(4A), that he is satised that the Order Land is, or forms part of, an open space, none of the Order Land is a common, or fuel or eld garden allotment, there is no suitable land available to be given in exchange for the Order Land or any suitable land available to be given in exchange is available only at prohibitive cost, and it is strongly in the public interest for the development for which the order grants consent to be capable of being begun sooner than is likely to be possible if the order were to be subject to special parliamentary procedure; (ii)  under section 132(3) that he is satised that the Order Land, when burdened with the Order Rights, will be no less advantageous than it was before to the following persons:The National Planning Casework Unit 5 St Philips Place Colmore Row Birmingham B3 2PW Or emailed to ThamesTidewayTunnel.npcu@communities.gsi. gov.uk by 31 December 2013 quoting reference NPCU/RARECT/ s131/132/72270 and if your objection relates to a specic site please state the site name from the table below. 5.  Copies of the documents taken into account by the Secretary of State in determining whether to issue the Certicates, including the Plan are on deposit at:  Institution of Civil Engineers, 1 Great George Street, London SW1P 3AA  Linden House, Upper Mall, Hammersmith, London W6 9TA  Glaziers Hall, 9 Montague Close, London SE1 9DD a  nd may be seen there during the hours of 09:00 17:00 Monday to Friday excluding public and bank holidays. They may also be found at www.infrastructure.planningportal.gov. uk/projects/london/thames-tideway-tunnel/ 6.  The Secretary of State for Communities and Local Government may cause a public local inquiry to be held in relation to the proposal to issue the Certicates. 6 December 2013

Land 221 28

1,357m Hardstanding and public footway (Falconbrook Pumping Station)

Construction and maintenance of permanent works including CSO drop shaft (Work No. 10a), s131(4A) interception chamber, other chambers, culverts, pipes, ducts, railings and landscaping (Work No. 10c). Construction and maintenance of permanent works including Low Level Sewer overow weir chamber, other chambers, culverts, pipes, ducts, electrical and s131(4A) control equipment, ventilation columns, other ventilation structures and equipment, river wall, wall and landscaping (Work No. 12c). Subsurface only - construction and maintenance of connection culvert beneath Chelsea Embankment and beneath the foreshore (part of Work No. 12c) s131(4A)

Royal Borough of Kensington & Chelsea Chelsea Embankment Foreshore

Land

42

127 577m

Grassed area and shrubbery (off Chelsea Embankment), excluding river wall

(a) the persons in whom it is vested, (b)  other persons, if any, entitled to rights of common or other rights, and (c) the public. 3.  The Order Land is described in the Schedule to this Notice and the Order Rights which are to be acquired. On the plan referred to in paragraph 5 below, the Order Land is shown coloured shaded pink for land which is to be compulsorily acquired; shaded purple for land for which rights are to be acquired; and shown shaded pink and striped for foreshore which is to be compulsorily acquired (the Plan). 4.  The Secretary of State is required to give notice of his proposal to issue the Certicates or to direct the Applicant to do so and give any persons interested an opportunity to make representations about the proposal to grant the Certicates in respect of Compulsory Acquisition of Open Space and Rights over Open Space pursuant to Section 131(4A) and Section 132(3) before he reaches a decision. The Applicant hereby gives that notice. Any representations or objections in relation to the proposal to grant the Certicates should be addressed in writing to:-

Land (RanElagh Gardens)

44

450

Footway and gardens (Ranelagh Gardens)

14 15 20 22

6 428 125 268

River (River Thames), foreshore and bed thereof above London Underground tunnel (Victoria line) River (River Thames), foreshore and bed thereof River (River Thames), foreshore and bed thereof River (River Thames), foreshore and bed thereof, below bridge carrying public road and footways (Vauxhall Bridge, A202) River (River Thames), foreshore and bed thereof, below bridge carrying public road and footways (Vauxhall Bridge, A202) River (River Thames), foreshore and bed thereof River (River Thames), foreshore and bed thereof and storm relief channel (River Effra) River (River Thames), foreshore and bed thereof River (River Thames), foreshore and bed thereof Dock (Lack's Dock) and river (River Thames), foreshore and bed thereof (excluding all interests of the Crown) Grassed area and land between Crosseld Street and Coffey Street Grassed area, wall and land (between Crosseld Street, Coffey Street and Deptford Church Street) 4,235m Grassed area, wall and land (between Crosseld Street, Coffey Street and Deptford Church Street) Grassed area, wall and land (between Crosseld Street, Coffey Street and Deptford Church Street) Grassed area and land between Crosseld Street and Coffey Street Construction and maintenance of permanent works including CSO drop shaft (Work No. 15a), foreshore structures, new storm overow, interception chamber, other chambers, culverts, pipes, ducts, electrical and control equipment, kiosks, ventilation columns, other ventilation structures and equipment, scour protection, outfall aprons, river walls and landscaping (Work No. 15c).

s131(4A) s131(4A) s131(4A) s131(4A)

London Borough of Lambeth Albert Embankment Foreshore Foreshore

23 28 29 33 37 38

544 3747 4 156 874 356 38 2684 1100 400 13

6,508m

s131(4A) s131(4A) s131(4A) s131(4A) s131(4A) s131(4A)

Schedule Order Land and Order Rights London Borough and site name
London Borough of Richmond upon Thames Barn Elms

Land or foreshore

Plot Area Number (m)


17161 17161

Total area of site

Plot Description
Sports eld and equipment, car park, footways and shrubbery (Barn Elms School Sports Centre, Queen Elizabeth Walk)

Purpose for which land and rights are required

Certicate under Section 131(4A) or 132(3)


London Borough of Lewisham Deptford Church Street Land

155 156 160 161 162

Land

71 80 17

3 1143 906 131 1710 464 482 88 1480 1644

18,307m

Sports eld and shrubbery (Barn Elms School Sports Centre, Queen Elizabeth Walk) Sports eld, footways and shrubbery (Barn Elms School Sports Centre, Queen Elizabeth Walk) River (River Thames), foreshore and bed thereof River (River Thames), foreshore and bed thereof River (River Thames), foreshore and bed thereof Grassed area (Waterman's Green) adjacent to Putney Bridge

Construction and maintenance of permanent works including CSO drop shaft (Work No. 4a), interception s131(4A) chamber, other chambers, culverts, pipes, ducts, electrical and control equipment, kiosk, ventilation columns, other ventilation structures and s131(4A) equipment, new permanent access road and hardstanding, habitat enclosure, replacement s131(4A) changing rooms and landscaping (Work No. 4c). s131(4A) Construction and maintenance of permanent works including CSO drop shaft (Work No. 5a), foreshore structure, new storm overow, interception chamber, other chambers, culverts, pipes, ducts, electrical and control equipment, kiosk, ventilation columns, other ventilation structures and equipment, new river wall, scour protection, outfall apron and landscaping (Work No. 5c). Rights required for access: Right of access for the purpose of maintaining Work Nos. 5a, 5b and 5c s131(4A) s131(4A) s131(4A) s131(4A) s131(4A) s.132(3) - Temporary at surface level, Permanent rights

Construction and maintenance of permanent works s131(4A) including CSO drop shaft (Work No. 22a), interception chamber, other chambers, culverts, pipes, ducts, electrical and control equipment, s131(4A) kiosks, ventilation columns, other ventilation structures and equipment and landscaping s131(4A) (Work No. 22b). Subsurface only - construction and maintenance of CSO interception chamber beneath Deptford Church Street (part of Work No. 22b) s131(4A) s131(4A) Rights required for crane oversailing: Rights of access for crane oversailing for the purpose of maintaining and operating Work Nos. 1d, 29a and 29b s.132(3) - Permanent at subsoil level, Temporary at surface level, Permanent rights

Foreshore London Borough of Wandsworth Putney Embankment Foreshore Foreshore Land (Waterman's Green)

18 24 29 38a 41 46

21

629

River (River Thames), foreshore and bed thereof

5,261m

Bridge carrying public road and footways (Putney Bridge, A219) and river (River Thames), foreshore and bed thereof below River (River Thames), foreshore and bed thereof River (River Thames), foreshore and bed thereof Public park (Kings George's Park), footways and shrubbery

22a Foreshore

33

River (River Thames), foreshore and bed thereof

Rights required for crane oversailing: Rights of access for crane oversailing for the purpose of maintaining and operating Work Nos. 1d, 29a and 29b Rights required for crane oversailing: Rights of access for crane oversailing for the purpose of maintaining and operating Work Nos. 1d, 29a and 29b Rights required for crane oversailing: Rights of access for crane oversailing for the purpose of maintaining and operating Work Nos. 1d, 29a and 29b Rights required for crane oversailing: Rights of access for crane oversailing for the purpose of maintaining and operating Work Nos. 1d, 29a and 29b

s.132(3) - Permanent at subsoil level, Temporary at surface level, Permanent rights s.132(3) -Temporary at surface level, Permanent rights s.132(3) - Temporary at surface level, Permanent rights s132(3) -Temporary at surface level, Permanent rights

London Borough of Wandsworth King George's Park Land

176

2,640m 178 195 996 29 68 757 44 146 268 1,357m Public park and footway (King George's Park) Hardstanding (Falconbrook Pumping Station) Shrubbery and public footway (Falconbrook Pumping Station) Shrubbery, hardstanding, car park, public footway and access (Newcomen Road) Public footway (Falconbrook Pumping Station) Hardstanding and access (Newcomen Road) Hardstanding and access road (off Newcomen Road)

Construction and maintenance of permanent works including CSO drop shaft (Work No. 9a), interception s131(4A) chamber, other chambers, culverts, pipes, ducts, electrical and control equipment, kiosk, ventilation columns, other ventilation structures and s131(4A) equipment, hardstanding area and landscaping (Work No. 9b). s131(4A) Construction and maintenance of permanent works s131(4A) including CSO drop shaft (Work No. 10a), interception chamber, other chambers, culverts, s131(4A) pipes, ducts, railings and landscaping (Work No. 10c). s131(4A) s131(4A) Rights required for access: Right of access to the permanent works for the purpose of maintaining and Work Nos. 10a, 10b and 10c s.132(3) Temporary at surface level, Permanent rights

London Borough of Tower Hamlets King Edward Memorial Park

23a

20 11,415m

River (River Thames), foreshore and bed thereof

24

47

River (River Thames), foreshore and bed thereof

London Borough of Wandsworth Falconbrook Pumping Station Land

208 210 211 212 214

Land

25 26

52 1684 334

Public park (King Edward Memorial Park), hardstanding and public footpath (Thames Path) River (River Thames), foreshore and bed thereof

Foreshore

29

Land

30

8616

Construction and maintenance of permanent works s131(4A) including CSO drop shaft (Work No. 24a), foreshore River (River Thames), foreshore banks structure, new storm overow, interception s131(4A) and bed thereof chamber, other chambers, culverts, pipes, ducts, electrical and control equipment, kiosks, ventilation Public park (King Edward Memorial Park), footways, gardens, hardstanding, playground and columns, other ventilation structures and s131(4A) footpath (Thames Path) and tunnel carrying public equipment, scour protection, river wall and landscaping (Work No. 24b). road (Rotherhithe Tunnel, A101) below