A.1.5/ 3 B.1.5/ 4 C.3/ 1.5 D.4/ 1.5 7. No water closet or bidet shall be set closer than ______m from its center to any side of the wall or obstruction or closer than ______m center to center to any similar fixture. A..375 / 0.75 B..375 / 0. 70 C..40 / 0.70 D..50 / 0.60 8. Lead Pipe spaced.
A.Stiff aluminum or wooden backing B.stiff metal or wooden backing C.stiff plastic or metal sheet 9. Fixtures having concealed slip joint connections shall be provided with an access panel or utility at least ______m in its least dimension for inspection & repair. A.0.30 B.0.20 C.0.10 D.0.40
10. Excessive water pressure water pressure greater than ____ Kpa
A.551 B.552 C.553 D.554
11. drains shall have a waterway equivalent area of the tailpiece meaning, the sum of all the areas
of the perforation of the strainer is equivalent to the outlet area. A.Strainers serving bathub B.Strainers serving shower C.Strainers serving lavatory D.none of the above 12. Copper Tubing - shall be supported at approximately ________m intervals for piping 38mm diameter & smaller & _______m intervals for piping 51mm & larger in dia. A.1.8/ 3.0 B.1.9/ 3.5 C.1.5 / 2.5 D.none of the above 13. Continuous waste fixture tailpiece connections were exposed or accessible may be of seamless drawn brass not less than Ga. 20 B&S or ______mm thk. A.0.90 B.0.80 C.0.70 D.0.60
D.90% 16. ______________ must be supported at least every other joint except that when the developed length between supports exceeds 1.2m, they shall be provided at each joint. A.Couplings and compression joints B.Hubless or compression gasket joints C.Caps and plugs D.none of the above 17. ____________ - shall be supported by stiff metal or wood backing with hangers in its entire length for small-size tubings up to 38mm diameter & without backings but with spaced metal hangers at approved spacing for larger-size tubings. A.steel tube B.plastic tube C.aluminum tube D.concrete tube 18. ________ m max A.61 B.62 C.63 D.64
19.
A.WASTE TANK B.SEPTIC TANK C.SEWAGE DISPOSAL SYSTEM D.NONE OF THE ABOVE
20.
A.20mm/m or 2% B.30mm/m or 3% C.40mm/m or 4 % D.10mm/m or 1 %
21.
A.22 degrees bend B.45 degrees bend C.60 degrees bend or other approved fittings of longer sweeps D.30 degress bend
22.
A.NAMPAP B.DILG C.DPWH D.DENR
23.
A.AIR SEPARATION B.AIR BREAK C.AIR DEVISOR D.NONE OF THE ABOVE
24.
A.BRANCH INTERVAL B.INTERVAL C.BRANCH D.LENGTH
25.
A.1,2 B.1,1
C.2,1 D.2,3
26.
A.45 wye branches B.combination wye & 1/8 bend branches C.30 wye bend D.or other approved fittings of longer sweeps.
27.
A.45 wye branches B.combination wye & 1/8 bend branches C.or other approved fittings of longer sweeps. D.30 wye bend
28.
A.INTRAMUROS B.BARASOAIN C.BATAAN D.CEBU
29.
A.45 wye branches B.or other approved fittings of longer sweeps. C.60 degree branches or offsets (only for pipes installed in true vertical position D.45 degree branches
30.
A.Double hub fitting for leak-caulked joint in vertical position B.Single or double tee branch C.Single or double tapped tee branch D.Side inlet quarter bend, Running thread, band or saddle E.all of the above
31.
A.single hub sanitary tapped tee B.double hub sanitary tapped tee C.triple hub sanitary tapped tee D.none of the above
32.
A.plumbing unit B.plumbing fixtures C.plumbing system D.plumbing minimum
33.
A.GI soil pipe B.cast iron soil pipe C.PVC soil Pipe D.none of the above
34.
A.SINK B.LAVATORY C.BASIN D.NONE OF THE ABOVE
35.
A.VENTILATING SYSTEM B.WATER-SEALED TRAP C.SOIL PIPES
D.WASTE PIPES
36.
A.100 mm B.102 mm C.101 mm D.104 mm 37. Water pipes & fittings with a lead content that exceed ____ shall be prohibited & shall not be used in potable piping systems. A.8% B.9% C.10% D.11% 38. Water Closet & Urinal Tanks shall be equipped with a listed ________ & shall be installed with the critical level at least 25mm above the full opening of the overflow pipe. A.corporation cock B.gatevalve C.ballcock D.none of the above 39. THE TOTAL NUMBERS OF SET OF SANITARY/ PLUMBING PLANS REQUIRED BY THE BUILDING OFFICIAL WHEN APPLYING FOR PERMIT A.4 B.5 C.3 D.6
40. THE SANITARY AND PLUMBING PERMIT WILL BE REVOKE IF THE PROJECT HAS BEEN
ABANDONED OR SUSPENDED FOR HOW MANY DAYS A.120 B.60 C.30 D.100
41. The quantity of water required to be supplied to every plumbing fixture shall be represented by
____________ A.Fixture Units FU B.Fixture drain FD C.Fixture Trap FT D.none of the above 42. the minimum airgap for Effective openings not greater than 25mm in diameter. affected by walls A.2 times diameter of effective opening B.4 times diameter of effective opening C.5 times diameter of effective opening D.3 times diameter of effective opening 43. the minimum airgap for Effective openings A.3 times diameter of effective opening B.2 times diameter of effective opening C.4 times diameter of effective opening D.5 times diameter of effective opening 44. THE MINIMUM HEIGHT REQUIRED FROM THE FINISH GRADE LINE THE SIAMESE INLET CONNECTION OF A STANDPIPE A.2.0 M B.1.2 M C.1.5 M D.2.5 M 45. The minimum air gap for Over rim bath fillers & other fixtures with effective openings not greater
than 25mm in diameter. affected by walls A.76mm B.77mm C.78mm D.79mm 46. The minimum air gap for Over rim bath fillers & other fixtures with effective openings not greater than 25mm in diameter. not affected by walls A.54mm B.53mm C.52mm D.51mm 47. The minimum air gap for Lavatories & other fixtures with effective openings not greater than 13mm in diameter if not affected by wall A.25 B.24 C.23 D.22
48. The minimum air gap for Lavatories & other fixtures with effective openings not greater than 13mm
in diameter if affected by walls A.36mm B.37mm C.38mm D.39mm 49. the minimum air gap for Sinks, laundry trays, goosenecks bath faucets & other fixtures with effective openings not greater than 19mm in diameter. if not affected by wall A.40mm B.39mm C.38mm D.37mm 50. the minimum air gap for Sinks, laundry trays, goosenecks bath faucets & other fixtures witheffective openings not greater than 19mm in diameter. if affected by wall A.56mm B.57mm C.58mm D.59mm 51. THE EXPIRATION OF THE PERMIT FOR SANITARY / PLUMBING WILL BE EXPIRED AFTER HOW MANY YEARS FROM THE DATE OF ISSUANCE A.2 B.1 C.1.5 D.3
52. THE DRAWINGS, SPECIFICATION, CALCULATIONS AND ETC FOR PLUMBING / SANITARY
PERMIT WILL BE SIGNED BY A a Registered & Licensed A.DRAINAGE ENGINEER B.MASTER PLUMBER C.SANITARY ENGINEER D.ARCHITECT 53. Restaurant kitchen & other special-use sink may be made of approved-typed sheet steel not less than Ga.16 U.S. B&S or 1.6mm thk. A.bonderized & galvanized B.aluminum C.steel D.none of the above
57. Inadequate water pressure water pressure less than _____ Kpa
A.103 B.104 C.105 D.106
58. In Screwed Pipe - IPS shall be supported at approximately _______m intervals for piping 19mm
diameter & smaller & _______m intervals for piping 25mm & larger in diameter. A.3.5 / 3.0 B.3.0 / 3.5 C.3.6/ 3.0 D.3.0 / 3.6 - piping buried on the ground shall be laid on the ______ for its entire length, except 59. In Ground where concrete cradle support is provided which is adequate & approved by the Administrative Authority. A.firm bed B.strata C.compacted earth D.none of the above 60. for EXCRETA DRAINAGE SYSTEM No Vitrified Clay Pipes or Fittingsfor building drain or sewer shall be used above ground or whenever piping is pressurized by a pump or ejector. They shall be kept ______m below finish ground level. A.0,30 B.0.40 C.0.50 D.0.60 61. for EXCRETA DRAINAGE SYSTEM No Galvanized Wrought Iron orGalvanized Steel Pipe shall be used underground & shall be kept at least _____mm above ground. A.155 B.152 C.153 D.154
62. for vertical piping, Screwed Pipe - Iron Pipe Size (IPS) shall be supported at not less than every
other storey A.drift B.height C.level
D.dimension 63. for vertical piping, _________ - shall be supported at each storey or at a maximum intervals of 3m o.c. A.lead tubing B.copper tubing C.steel tubing D.g.i. tubing 64. for vertical piping, cast iron pipes- Bell & Spigot & Hubless pipe shall be supported at_____ or closer. A.every 2 storey B.every storey C.every 3 storey D.every 4 storey 65. FOR THE SET OF SANITARY/ PLUMBING PLANS REQUIRED BY THE BUILDING OFFICIAL WHEN APPLYING FOR PERMIT HOW MANY SET OF DRAWINGS WILL BE RETURNED ON THE APPLICANT A.1 B.2 C.3 D.4
66. FOR THE SET OF SANITARY/ PLUMBING PLANS REQUIRED BY THE BUILDING OFFICIAL
WHEN APPLYING FOR PERMIT HOW MANY SET OF DRAWINGS WILL BE PROVIDED FOR THE ADMINISTRATIVE AUTHORITY A.1 B.4 C.3 D.2
67. FOR THE SET OF SANITARY/ PLUMBING PLANS REQUIRED BY THE BUILDING OFFICIAL
WHEN APPLYING FOR PERMIT HOW MANY SET OF DRAWINGS WILL BE KEPT IN THE JOB SITE A.2 B.3 C.1 D.4
C.12 D.9
73. fixture unit of Water Closet (flush tank & flushometer-tank),Hose Bibb or Sill Cock (standard type)
private use A.2 B.3 C.4 D.5
77. fixture unit of Bidet, Bathtub(With or Without Shower Over),Laundry Tub or Clothes Washer (each
pair of faucets), Shower (each head), Sink or Dishwasher private use A.2 B.3 C.4 D.5
78. Fixture unit of bidet, Bathtub(With or Without Shower Over),Laundry Tub or Clothes Washer (each
pair of faucets), Shower (each head), Sink or Dishwasher public use A.2 B.3 C.4 D.5
79. fixture unit Bar Sink, Drinking Fountain, Lavatory private use
A.1 B.2 C.1.5 D.2.5
80. ficture unit Bar Sink, Drinking Fountain, Lavatory public use
A.1 B.2 C.1.5 D.2.5
81. EXCRETA DRAINAGE SYSTEM what piping installations shall be used in high rise buildings
A.ABS Acrylonitrile-Butadiene-Styrene
B.PVC (POLYVINYL CHLORIDE) C.Vitrified clay pipe D.a,b E.b,c 82. consists of two independently acting internally or externally loaded check valves, four properly located test cocks with connectors & two isolation gate valves. A.ATMOSPHERIC VACUUM BREAKER (AVB B.DOUBLE CHECK VALVE BACKFLOW PREVENTION ASSEMBLY (DC) C.PRESSURE VACUUM BREAKER BACFLOW PREVENTION ASSEMBLY (PVB) D.none of the above 83. consists of two independently acting internally loaded check valves, a differential pressure relief valve, four properly located test cocks & two isolation gate valves. A.PRESSURE VACUUM BREAKER BACFLOW PREVENTION ASSEMBLY (PVB) B.REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTION ASSEMBLY (RP) C.ATMOSPHERIC VACUUM BREAKER (AVB D.DOUBLE CHECK VALVE BACKFLOW PREVENTION ASSEMBLY (DC) 84. consists of a loaded air inlet valve, an internally loaded check valve, two properly located test cocks & two isolation gate valves. A.ATMOSPHERIC VACUUM BREAKER (AVB B.DOUBLE CHECK VALVE BACKFLOW PREVENTION ASSEMBLY (DC) C.PRESSURE VACUUM BREAKER BACFLOW PREVENTION ASSEMBLY (PVB) D.none of the above 85. consist of a body, a checking member & an atmospheric opening. A.ATMOSPHERIC VACUUM BREAKER (AVB B.DOUBLE CHECK VALVE BACKFLOW PREVENTION ASSEMBLY (DC) C.PRESSURE VACUUM BREAKER BACFLOW PREVENTION ASSEMBLY (PVB) D.none of the above 86. All pipings passing under or through walls shall be protected from breakage with embedded ________________. A.concrete pipe metal sleeves B.pvc pipe sleeves C.metal pipe sleeves D.none of the above 87. All pipes passing through or under cinders or other corrosive materials shall be protected from external corrosion by encasing same with _______ or in any other approved manner. A.metal sheath B.polybuthane sheath C.polyethylene sheath D.plastic sheath 88. _____________
A.plastic pipe B.pvc pipe C.steel pipe D.lead pipe 89. in vertical piping ___________shall be supported at intervals not exceeding 1.20m at centers with a rigid vertical back-up A.PVC pipe B.Lead Pipe C.Steel Pipe D.G.I pipe 90. No Drainage or __________ shall be drilled & tapped for making connections thereto A.supply piping B.vent piping
C.drainage piping D.none of the above 91. which is not properly lighted & ventilated. A.CATCH BASIN B.LAVATORY C.BIBB D.WATER CLOSET 92. If it is impracticable to obtain such slope due to the following conditions except, A.Excessive depth of the proposed drainage line B.Structural and/or geological features of the terrain C.Existing adverse in arrangements of building structure D.Reasonable change because of existing weather