You are on page 1of 6

Parthiban Sankara

Engineer at Bharat Heavy Electricals Limited

Summary
Project management executive with a comprehensive knowledge of planning and execution of Erection & Commissioning of power plant electrical systems with a back up of 4+ years of experience in power plants with consistent track record of successfully completed projects of rating 210 MW 500MW. During this 4+ years of journey in BHEL gained enhanced knowledge in the areas of project planning, resource mobilization, material management, quality assurance, safety at construction sites, Erection and commissioning of power plant electrics, Customer satisfaction, Sub-contractor management Interested in developing myself as a complete project management professional capable of execution of any project from concept to completion in the field of energy.

Experience
Engineer at Bharat Heavy Electricals Limited November 2009 - Present (4 years 1 month) Planning, Execution of erection and commissioning of Electrical systems & Equipment's of a Thermal Power Plant. Monitoring the erection and commissioning activities as per the design documents & specifications. Reporting and resolving any technical issues found during erection and commissioning activities in mutual correspondence with the respective engineering teams. Facilitating the sub-contractor for the completion of erection and commissioning of the equipments on time by closely monitoring the material supply, availability of erection and commissioning fronts, technical clarification etc., Coordinating between customer and contractor for timely completion of the project. Checking the day to day progress and man power allotted in respective areas. If found any delay or requirement of additional man power, coordinating with the respective contractor to do the needful. On- site inspection of erection and commissioning of the systems as per the prescribed filed quality plans. Maintaining the documents by duly noting all the observations/recordings in prescribed formats. Engineer Trainee at Bharat Heavy Electricals Limited November 2008 - October 2009 (1 year)
Page1

Joined as Engineer trainee Undergone 3 months common induction training Attended 2 months training programs named accelerated power engineer development program

Page2

Projects
Vallur Thermal Power Plant May 2011 to Present Members:Parthiban S. 3 X 500 MW Thermal Power Plant Primarily responsible 1. Erection and commissioning of ESP, DVAR, LT switchgear etc., 2. Planning and monitoring of execution 3. On site Inspection 4. Material follow up with stores and manufacturing units and vendors 5. Resolving of non conformities found ( design, manufacturing, erection and commissioning) by coordinating with respective design, quality, commercial and sub contractor teams Unit 1: Successfully commissioned and handed over the following systems to customer 1. Electrostatic precipitator with 4 Passes and 40 fields 2. Variable frequency drives for ID fan 2Nos 3. Brush less excitation system including digital automatic voltage regulator 4. AC and DC drives Involved in commissioning of electrical switchgear of soot blowing system Adequate training given to fresh engineers of sub contractor in the field of commissioning of electrostatic precipitator Involved in erection of electrical systems of ESP and transformer Contributed for the timely synchronization, capacity addition, performing COD and subsequent trail operation of the project. Unit 2: Successfully commissioned the following systems 1. Variable frequency drives for ID fan 2Nos 2. Brush less excitation system including digital automatic voltage regulator 3. AC and DC drives Involved in commissioning of electrical switchgear of soot blowing system Involved in erection of electrical systems of ESP and transformer Contributed for the timely synchronization, capacity addition of the project Responsible for commissioning of ESP

Rayalaseema Thermal Power Plant


Page3

February 2010 to April 2011 Members:Parthiban S. RTPP UNIT - 5 1X210 MW Responsible for commissioning of complete electrical systems & equipments which include 1. Transformers of rating up to 240 MVA 2. Generator of rating 15KV, 210 MW 3. HT/LT switchgear ( 415V to 6.6KV and 220 V DC) 4. AC and DC machines 5. Variable frequency drives 6. Automatic voltage regulator with brush less excitation systems 7. Generator and Transformer protection systems Involved in erection of station transformer and Generator transformer Involved in commissioning of Electrostatic precipitator. Coordinating with C&I commissioning team for enabling the operation of electrical systems from main control room. Responsible for Handover of the systems to customer after successful trial operation along with required data sheets, test reports and trial run protocols. Amarkantak Thermal Power Station February 2009 to February 2010 Members:Parthiban S. Joined the site for "ON THE JOB TRAINING" as part of my one year training Responsible for erection, Testing and commissioning of HT/LT switchgears of CHP Involved in commissioning of stacker cum reclaimer at Coal handling plant Involved in commissioning of static excitation system ( DVAR). Responsible for timely reporting of non - conformities to the respective units and vendors and resolving the same by close monitoring. Responsible for timely preparation of joint protocols after completion of erection and commissioning Contributed for the timely synchronization, capacity addition, performing COD and subsequent trail operation of the project.

Skills & Expertise


Electrical Engineering Power Plants Project Engineering Commissioning Power Electronics

Page4

Languages
English Hindi Tamil Telugu (Professional working proficiency) (Professional working proficiency) (Native or bilingual proficiency) (Full professional proficiency)

Education
Jawaharlal Nehru Technological University Bachelor's degree, Electrical and Electronics Engineering, 2003 - 2006 Grade: First Class with Distinction Govt. Polytechnic, Nellore, Andhra Pradesh Diploma in Electrical and Electronics Engineering, Electrical and Electronics Engineering, 1999 - 2002 Grade: First Class ZPHS, Damalacheruvu, Chittoor D.T, Andhra Pradesh - 517152 Secondary School, 1994 - 1999 Grade: First Class

Interests
New Technologies, travelling, movies,

Page5

Parthiban Sankara
Engineer at Bharat Heavy Electricals Limited

Contact Parthiban on LinkedIn

Page6

You might also like