S h a n g h a i Electric ( G r o u p ) C o r p o r a t i o n V i e t n a m Q u a n g N i n h Project M a n a g e m e n t ToM: Mr. Duong QuocThang c/mm-. Corp^sl: PECC1 TelEiS:0084-33-832715 FAXit*: 0084-4-9350422, 0086-4-8543954 Written b y P i : ^ ^ j c ^ ^ Review Dear Sir: Your No.:QN1-PF/QNTPJSC_SEC-CA-0811 letter regarding "Construction of plant internal road (from the plant main gate to the rear of SEC office area)" has been received. For the Consultant's comment, the contractor would like to clarify and reply it as following: After Owner's permission, the contractor changes the design and starts to construct the road section, which is from the plant main gate to the rear of SEC office area. For the Owner's official document and the contractor's letter, please refer to the attachment. ' FromS: SEC Date BIB: 2011/65/11 Subject LP: reply to QNt-PF/QNTP.JSC SEC-CA-0811
letter

Or Ret.Nod^5i:0084-33-657538 Page>i i fx: 1+2+1 Refill: X-C-F-GN-11/ ) Approved byftbl:

Your timely attend the inspection will be anticipated.

Attachment: 1. Owner letter Ref.No:359/CV-NDQN-KT, dated April 18,2011 (two pages) 2. SEC letter X-C-F-GN-11/114, dated April 29, 2011 ( one page) Thank you for your support. Deputy Project Manager
Ba Yusen

Jti;it: r h W f f . # 3 6 6 9 ^ (201100) Add: No. 3GG9 Jindu Road Shanghai Tel: 8621-54429155-618 Fax= 8621-54830671 www.secpg.com
'

R.P. China (201108)


-

F'fl

"TOOUM.

* e / s /&

/r

QUANG NINH THERMAL POWER J O I N T STOCK COMPANY


~~

SOCIALIST REPUBLIC OF VIETNAM Independence- Freedom- Happiness


* * * *

Address: 33/5 Ha Khanh precinct, Ha Long City, Quang Ninh Province, Vietnam.

R e f. No: 9 /CV-NBQN-KT Dat e : April ig 2011

Tel: (+84) 033-657539;

Fax: (+84) 033-657540

Pages: 02 '

Email address: qntpjsc@hn.vnn.vn

To: SEC - Vietnam Quang Ninh Project Management Address: 33/5 Ha Khanh precinct, Ha Long City, Quang Ninh Province, Vietnam Tel:: +86-21-54429500 Fax: +86-21-54428930 Email: caivq@secps.com From: Mr. Nguyen Van Dung - Deputy General Director of Quang Ninh Thermal Power Joint Stock Company. Subject: Construction of access road to Plant Dear Sir(s), Pursuant Letter No. X-C-F-GN-2011/048 on March 08, 2011 of Contractor- SEC about comment that asked for changing design of access road to Plant- the main gate section to area rear three floor administrative building of Contractor-SEC, it is deleted clause 6.4: The excavation and compactness depth for subsoil is lm in design drawing F4092S-Z 0107-01 with reason that is current road was surface hardness enough so that should not excavate more 1 m and compact depth again. Pursuant to Report of Meeting on March 14, 2011 with participants include ContractorSEC, Technical Consultant (PECC1); Pursuant to Letter No. X-C-F-GN-2011/048 on April 10, 2011 of Contractor- SEC in that asked the Owner has writing for response according to proposal for design change of Contractor-SEC's access road. After consideration and investigation, Quang Ninh Thermal Power Joint Stock Company would like fto bring out tfeee alternative constructions of access road for ContractorSEC's selection as follows: 1. First alternative: It is agreed with design change of access road to Plant according to SEC's proposal with conditions that meet following requirements: Contractor- SEC has to have a engaged writing sending to the Owner about that Contractor- SEC shall take responsibility for maintenance and reparation of road till finish of Project: The construction of the road must be completed 45 days from the date of starting work and commitment to take responsibility to the Owner in order to ensure traffic

and equipment and goods transportation for construction of Quang Ninh Project No.2 when the road construction. 2. Second alternative: Not change the design of access road to Plant according to SEC's proposal and when complement of construction of Quang Ninh 2, it's time to construct access road. It is required Contractor- SEC have to repair access road to Plant by spraying additional layers 20 cm crushed stone on the road so that traffic safety when the rainy season comes. Best regards^j'

^ ^ n N g ^ n Van Dung ^ e p u l y General Director of Quang Ninh Thermal Power Joint Stock Company

I: m

iti H

( M m

) &

m J

m i t r x ^ f^ ^ JI Shanghai Electric (Group) Corporation Vietnam Quang Ninh Projcct Managcmcnt


T o g : Mr. Vu M anh Hong C/c!>M: C o r p u s ] : QNTPJSC Tel $,tS :0Q84-33 832715 FAXfeSJ: 0084-4-9350422, 0086-4-8543954 Written b y M S : Review b y ^ t i : ' F r o m S : SEC DateBgfl: 2011/04/29 Subject J l S : Construction of access r o a d to Plant (reply to Ref.No:359/CV-NDQN KT letter) Or Ret.No|Ql{$^ff5;0034-33-657538 Page^: 1 tq. R e f ^ : X-C-F-GN-11/ t Approved byJtDi:

^ ^ ^ ^

Dear Sir: Your Ref.No:359/CV-NDQN-KT letter regarding "Subject; Construction of access road to Plant" has been received. After consideration and investigation seriously, now the Contractor-SEC's selection as folio wings: - The Contractor-SEC agree with the First Alternative and do the following guarantees: 1. The Contractor-SEC takes full responsibility for maintenance and reparation of road till finish of Project. 2. The Contractor-SEC ensures that the road will be completed 45 days from the date of starting work, and ensure the traffic, equipment & goods transportations for construction of Quang Ninh Project No.2 when the road construction. Thank you for your support.

Deputy project manager Wu JianMing

IV/O^/zo^
J f e h h s r t , Ea^?1ffiH-3669^ (-201108) Add: No. 3669 Jindu Road Shanghai Tel: 8621-54429155-318 Fax: 8621-54830671 www.secpg.com