Name: Vikram Jain

Designation: Sr. Project Engineer


SCOPE OF WORK
Creating layouts, design drawings and making relevant modifications with design plans
and structures in line with client/consultant/contractor specifications.
Eliminating redundant/obsolete process involved in the design by talking to
AC/Consultant and by attending meeting with AC/Consultant.
Preparing Design Report for BCA for project approval.
Design Tender stage Project for quotations.
Estimating the quantities for Tender Project & Approved project.
Estimating the Quantities for bursting links and bar chairs for Ongoing Project.
Prepared Mark-up for Shop drawing
Initiating & developing relationships with Site Project Mangers & Engineers for project
completion in time.
Technical Training and Monitoring of Supervisor & workers
Conduct Safety Training for Workers regarding company-specific and Occupational
Safety and Health Act, or OSHA, safety requirements.
Engage in the planning and scheduling, materials procurement, selection of
equipment, and cost control
Engage in Preparation for Stressing Pressure Calculation
Preparing Elongation Report based on Approved Shop Drawing.
Preparing Stressing Report for Main Con.
Engaged in Preparing Monthly Project Claim on Project Basis.
Prepared Mark-up drawing for Monthly Project Claim
Liaise with Project Manager, Engineers and others relevant person for Claim.
Managing, directing and monitoring progress during each phase of a project
Preparation of list of material requirements / quantities
Engaged in Preparing Safety Documents i.e. Risk Assessment, Fall Protection Plan,
Appointment Letter, Safe Work Procedure etc. for Projects.
Prepared Specialized Stressing Report and suggest solution for Stressing remedial.
Coordinate with Site Supervisor on daily basis for Site progress
Arrangement of Workers for various site, Update Daily work Progress and
Operation Time.
Engaged in Site Inspection with RE, RTO & Main Con prior to Concreting
Engaged in Various Site Meeting i.e. Coordination Meeting, Safety Meeting,
Progress Meeting etc. with Main Con/Consultant.