Professional Documents
Culture Documents
1 MALKAPUR
MALKAPUR 509 148 148 3 PROBLAME OF THREE DTC
2 MALKAPUR
MOTAL 465 24 24 NIL E.A. IS DISCUSS
3 MALKAPUR
NANDURA 462 61 61 NIL WITH IT & TO BE SOLIVED BY IT
4 MALKAPUR
JAL 523 67 67 NIL
DTC METER
INSTALLATION UP TO 30.09.09 --09 300 NO
PER METER PRICE @ RS.22400
RS. 6720000
185% 1243200
15% H.O 1194480
INT 12% 1098921
POINT NO 03
POINT NO 4
NIL
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR
MLK YES
MTL YES
NDR YES
JAL YES
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR
POINT NO 06
SUB DIVISION WISE ARREARS CAT WISE WITH CON'S AUG 2009 AND SEPT 2009 [ POINT NO 07 ]
SUB DN RES COMM IP RCI PWW AG [ JUNE .09] ST.LT ALL CAT .TOTAL
MONTH CON'S ARR CON'S ARR CON'S ARR CON'S ARR CON'S ARR CON'S ARR CON'S ARR CON'S ARR
AUG.09 MLK 10631 78.03 807 20.03 128 4 11566 102.06 65 71.48 5365 854.00 64 17.02 17060 1045.19
MTL 5919 21.81 255 2.85 64 1.12 6238 25.81 112 108.63 8855 1677.00 120 18.27 15325 1829.91
NDR 8698 34.70 466 7.14 89 1.98 9253 43.82 123 73.20 6808 1599.00 58 29.26 16242 1745.41
JAL 11211 81.08 597 14.19 156 6.12 11964 101.39 103 55.31 9791 2444.00 104 11.19 21962 2611.54
TOTAL 36459 215.62 2125 44.21 437 13.22 39021 273.08 403 308.62 30819 6574.00 346 75.74 70589 7232.05
SEPT.09 MLK 10335 62.82 717 16.04 154 4.71 11206 83.57 65 72.91 5365 854.60 64 17.84 16700 1028.95
MTL 7141 23.42 250 2.63 76 1.11 7467 27.16 111 110.60 8855 1677.00 120 19.38 16553 1834.34
NDR 9043 35.65 389 5.08 88 1.45 9520 42.18 115 75.43 6808 1599.00 60 29.32 16503 1746.06
JAL 10995 89.41 595 15.46 163 6.30 11753 111.17 107 57.06 9791 2444.00 107 12.15 21758 2624.06
TOTAL 37514 211.30 1951 39.21 481 13.57 39946 264.08 398 316.00 30819 6574.60 351 78.69 71514 7233.41
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR
POINT NO 08
STATES OF NORMAL WORKING OF ST.LT. METERS . MAGNTIC / FAULIT / ZREO CONSUMPTION METERS TO BE
JAL
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR
PWW ST.LT
S/DN
316.00 78.69
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR
REVENUE BUDGET FOR 2009 - 2010 AND ESTEIMATE FOR 2010-11 POINT 10
PROPER AGREEMENT WITH PRIVATE AGENCIES OF " A" ACCOUNT /DCC/BANK/CO-OP SOCIETIES
NIL
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR
NO OF INFORMATION OF ACTION TAKEN AGAINST THE CONSUMERS WHO ARE NOT PAID THE BILL FROM " ONE YEAR "
POINT NO 13
INDENTIFICATION AND VERFICATION OF CONSUMERS FOR IMPLEMENATION FOR IMPLEMENATION OF PROPER TRAIFF CATEGORY AS PER NEW
TRRFF INFORCE
YES
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION COMPANY LIMITED , MALKAPUR
Point No A-14
NDR 1 0.35
2 0.35
3 1.77
JAL NIL
MALKAPUR
ACHIEVED
Theft Detection Drive
Point No. : B-1
Date Name of No of Theft Amou Amoun Compo Compo FIR Cases No. of No.of No of Plain
Division Installation bcase nt t unding unding Logge Recov Hooks Meter Emplo Asses
Check detecte Asses Recov Asses Recov d ered Taken yees ment
d under ed ered ed ered Under under Out
135 under under under under 135 126
135 135 135 135
No. Amt No. Amt No. Amt No. Amt No. Amt No. Amt No. Amt No. Amt
03.11.09 Malkapur 254 3 0.23 3 0.23 3 0.23 3 0.23 71 2.88 102 44 0.99
Total 1560 29 ### 29 2.44 22 1.36 29 2.44 224 7.08 342 154 2.17
Redressal of Consumer Complaints
Point No. B- 2
eq[;
vfHk;ark]
eq[;
dk;kZy;@
vf/k{kd vgoky
eq[; vfHk;ark ea=h
vfHk;ark ikBfoY;kpk
v- ;kapk lanHkZ egksn~;
;kapk lanHkZ rØkjnkjkps ukao rØkjhps Lo#i lanHkZ
Ø- Øekad vkf.k eqacbZ
Øekad vkf.k Øekad vkf.k
fnukad ;kapk
fnukad fnukad
lanHkZ
Øekad
vkf.k
fnukad
1 CE/AMZ/AKL/T/ 5533 ea=h SE/BLD/T/ 6854 Jh- dkSrhdjko 'ksrkrhy foghjhojhy E.E./MLK/T/ 9208 Dt:
12-11-2009
Dt: 14-10-2009 Dt: 29-10-2009
mtkZ@tuj jkolkgsc ns'keq[k jk- fo|qr rkj dk<qu ?
y@ 337 fuexkao rk- ukanqjk ksrkauk >kysY;k
fn- 2009 fidkP;k uqdlkukph
fn- 20- HkjikbZ feG.ksdjhrk
08-2009 vkej.k miks"k.k ckcr-
2 … …. SE/BLD/T/ 5020 Jh- lat; f'ko'kadj vkRengu@vkRegR;k@tylek/kh
E.E./MLK/T/ 9192
fuosnukr
Dt: 12-11-2010
ueqn ekx.kh i=kpk vgoky lknj dj.ks ckc
Dt: 27-09-2007
ikVhy eq-fp[kyh cq-
iks- ykatqM rk-
3 …. …. SE/BLD/T/ 5839 [kkexkao
Jh- izdk'k ft-
xqykcjko vkOgk f'kokjkrhy E.E./MLK/T/ 9193
Dt: 15-09-2009 Dt: 12-11-2009
ikVhy] cqyMk.kk- 'ksrkrhy Qkegkmlpk
dusD'ku okij
daiuhps ufou
;kstusizek.ks
xkoBk.k lsijs'kuP;k E.E./MLK/T/ 9071
4 CE/AMZ/AKL/T/ 4515 CE/LM/ 24588 SE/BLD/T/ 5838 Jh- euksgj ikaMqjax fo|qr okghuhe/khy Dt: 09-11-2009
Dt: 20-08-2009 Dt: 23-07-2009 Dt: 15-09-2009
[kkjksMs eq- vi?kkrxzLr LFkGkaph
dktsxkao iks- nq#Lrh dj.;kckcr
#/kkuk
eq[;
vfHk;ark]
eq[;
dk;kZy;@
vf/k{kd vgoky
eq[; vfHk;ark ea=h
vfHk;ark ikBfoY;kpk
v- ;kapk lanHkZ egksn~;
;kapk lanHkZ rØkjnkjkps ukao rØkjhps Lo#i lanHkZ
Ø- Øekad vkf.k eqacbZ
Øekad vkf.k Øekad vkf.k
fnukad ;kapk
fnukad fnukad
lanHkZ
Øekad
vkf.k
5 CE/AMZ/AKL/T/ 5345 CE/LM/ 30077 SE/BLD/T/ 6841 Dt:
fnukad Jh- lS- ekschu lS- Jh- cqMu[kk E.E./MLK/T/ 9191
Dt: 12-11-2009
Dt: 03-10-2009 Dt: 11-09-2009 29-10-2009
egscqc] eydkiqj lksMsokys ;kaps
Fkzh Qst dusD'ku
6 CE/AMZ/AKL/T/ 4193 CE/Dist/24262 SE/BLD/T/ 5752 Dt: Jh- vkj- ,u- ikVhy] nqljhdMqu
d`f"k ?
iaikyk fot A.E./MLK/T/ 1122 Dt:
Dt: 31-07-2009 Dt: 20-07-2009 10-09-2009 08-07-2009
dqM [kq- iqjoBk feG.ks ckcr-
7 … … … Jh- izeksn ukjk;.k 15 tkusokjh 2009 E.E./MLK/T/
Camp/BLD / 01
[ksaMxGs o brj jk- nSfud yksder e/khy Dt: 13-11-2009
fuexkao rk- ukanqjk folaxrh
8 CE/AMZ/AKL/T/ 660 CE/LM/ 8479 SE/BLD/T/Conf. 019 Hkkjfu;eukckcr
Jh- ,l- ih- baxGs o brj Jh- olarjko foB~By E.E./MLK/T/ 8977
Dt: 30-01-2009 Dt: 20-10-2008 Dt: 04-01-2009 Dt: 04-11-2009
jk- ok?kqM oMksnk Vkys jk- oMksnk gs
f'kokj d`f"kiaiko#u jsYos
9 MD/ 1915 & 1917 CE/LM/ 14121 SE/BLD/T/ 3142 Jh- #rqjkt 'kjn ikVhy olkgrhyk ik.kh
cksvjosy ns.ks
yk fot E.E./MLK/T/ 5821
Dt: 04-05-2009 Dt: 11-05-2009 Dt: 30-05-2009 Dt: 19-09-2009
jk- 'ksyxkao cktkj iqjoBk feG.ksckcr-
10 CE/AMZ/AKL/T/ 1676 CM/ 37721 Dt: SE/BLD/T/ 2343 lkS- vk'kk jes'k fMMksGk cq- rk- E.E./MLK/T/ 3791
Dt: 20-07-2009
Dt: 20-03-2009 16-09-2008 Dt: 07-04-2009
EM/ 8234 Dt: vghjs ] jk- eksrkGk ft-
20-09-08 fMMksGk ] rk- cqyMk.kk gs xkao
MD /3581 eksrkGk xkoBk.k fQMj lsijs'ku
Dt: 15-10-08
izdYikvarxZr ufou
VªkUlQkWeZj
11 CE/AMZ/AKL/T/ 4628 … T.M SE/BLD/Dt: 21- Jh- larks"k flrkjke fuik.kk ;sFkhy E.E./MLK/T/ 5710
Dt: 14-09-2009
Dt: 26-08-2009 08-2009
rkanqGdj ] jk- deZfoj fHkdeflg
fuik.kk rk- eksrkGk ikVhy fo|ky;kl voS/k
fot iqjoB~;k ckcr-
eq[;
vfHk;ark]
eq[;
dk;kZy;@
vf/k{kd vgoky
eq[; vfHk;ark ea=h
vfHk;ark ikBfoY;kpk
v- ;kapk lanHkZ egksn~;
;kapk lanHkZ rØkjnkjkps ukao rØkjhps Lo#i lanHkZ
Ø- Øekad vkf.k eqacbZ
Øekad vkf.k Øekad vkf.k
fnukad ;kapk
fnukad fnukad
lanHkZ
Øekad
vkf.k
dk-l-
12 CE/AMZ/AKL/T/ 3154 fnukad SE/BLD/T/ 2454 Jh- vk- rq- olqydkj] ekpZ 2002 P;k T;k E.E./MLK/T/ 5198
Dt: 17-08-2009
Dt: 30-05-2009 &3@ukx@v Dt: 29-04-2009
ifjeaMG@rØk
jk- laxzkeiqj 'ksrdÚ;kauh foghjh
j @304 fn- [kksnY;k R;kauk
03-04-2009 dksVs'ku Hk#u v|ki
SE/BLD/T/ 5757 dusD'ku u feG.ks
13 … … Jh- uVojyky iquepan ehVj fjMhax u ?ksrk E.E./MLK/T/ 8957
Dt: 03-11-2009
Dt: 10-09-2009
rks"k.khoky ] jk- pqdhps fcy ns.;k
14 … … SE/BLD/T/ 4892 eydkiqj
Jh- Jhjke cGhjke d`f"kckcr
iaikyk fot E.E./MLK/T/ 5820
Dt: 05-08-2009 Dt: 19-09-2009
cksjls] jk- nso/kkck dusD'ku u fnY;kl
15 HkkO;@,e&2vkj ,e-Mh- SE/BLD/T/ 1566 Dt: Jh- [ksepan gqanjkt IykWVmiks"k.k
leksj fM-ih- u E.E./MLK/T/ 1593
Dt: 09-04-2008
29-03-2008
,l@ rØkjh@ @453 fn- panHkukuh ] jk- mHkkj.ks ckcr
5934 fn- 29-02- 06-02- ukanqjk
2009
… 2008
…. SE/BLD/T/ 5341 Dt: nSfud yksder e/khy ckHkGh P;k >kMyk A.E./Jal J. /T/ 2044 Dt:
26-08-2009 04-11-2009
16 fn- 17-08-2009 ph vWxy cka/kqu fot
…. …. SE/BLD/T/ 6057 ckreh e/khy
nSfud yksder iqjoBk
fo|qr rkj A.E./Jal J. /T/ 2045 Dt:
Dt: 07-10-2009 04-11-2009
17 fn- 15-10- ykscdGY;keqGs vi?
2009 ph ckreh kkrkl fuea=.k
dk;Zdkjh vfHk;ark
e-jk-fo-fo-da-e;kZ-
eydkiqj
Action taken report of DTC whose E.A is not done since 6 month and one yea
Point No. B- 03
no. of DTC's as per IT Data fed to IT No. of DTC whose EA not Data fedv to IT Remark
S.N. Name of division whose EA not done (out of col 3) done since one year (out of col.5)
since 6 month
1 2 3 4 5 6 7
Malkapur 4288186 Data fed to IT 4288186 Data fed to IT all data is fed to IT But, EA
S.A.
100 % Energy Audit
Point No. B-04
Total No of DTC DTC No of Meter installed DTC Nos for which E.A Balance DTC Reason
Sr.No. Name of Div Name of S/Dn
as on 30.09.09 to DTC as on 30.09.09 done on OCT -09 E.A.Not done
Problem of three DTC E.A. is discuss
1 Malkapur Malkapur 509 148 145 3
with IT & to be solved by IT
2 Malkapur Motala 465 24 24 Nil
3 Malkapur Nandura 462 61 61 Nil
4 Malkapur Jalgaon 523 67 67 Nil
Executive Engineer
M.S.E.D.Co.Ltd Malkapur
ACTION TAKEN REPORT ON -VE LOSS DTC AND FAULTY DTC METER
Point No. :- 05
Estimate for 40 HP IP
Connection in r/o. Mayur Plastic
3 Malkapur 9/14/2009 9/14/2009 9/25/2009 11/10/2009 40 HP 0 0.3 63 KVA 11/10/2009 Quotation Issued
Industry at Plot No. D-52 MIDC
Dasarkhed
H. T. Consumer
A- I Send to Date of
Sr. Received A- I Forworded Circle on Sanction Connectio
No. Name of Estimate From S.E. to S/Dn. Load LT HT T/F. Dt: by S.E. n Remark
Meter 1 Ph
Sr. Opening received Meter Utilisation
No. Balance in Month Received N.S.C. Replacement Remark
Last Year
1
Balance 975 0 0
2 Apr-09 0 334 0
3 May-09 0 327 37
4 Jun-09 1000 298 690
5 Jul-09 0 248 248
6 Aug-09 1000 359 171
7 Sep-09 2000 542 210
8 Oct-09 1217 269 1895
9 Nov-09 1430 0 882 MMPS . 1-11-2009 to 18-11-09
Executive Engineer
M.S.E.D.C.L.
Malkapur
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
DIVISION OFFICE MALKAPUR
B- 10
Sub : Failure of DTC for Year 2009-2010 upto Oct-2009
Last Year
Sr. No. Sub-Division Total DTC Fail DTC % Fail
Up to Oct-09
Executive Engineer
M.S.E.D.C.L.
Malkapur
D.
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
DIVISION OFFICE MALKAPUR
B-10
Sub : Action Plan for reduction Technical and commercial losses for year 2009-10
Zero 1 to 30
Consuptio Consumpti Theft
n on cases to New DTC Ag. Pump Faulty
Meter to be consumer consumer be For Maint meter to Laying of NSC to be meters to 3 Ph DTC
Name of taken to be to be deducted HT/LT be HPT to AB Cable released be Metering
Sr. No. S/Dn. outside checked checked 135+126 ratio replaced meter in Km. for Hook replaced to be done
1 Malkapur 3322 450 1094 332 90 1850 3294 2 20 531 288
2 Nandura 6500 2108 10404 275 52 375 1633 4.5 14 785 363
3 Motala 7000 2703 9308 285 48 729 758 3.5 30 831 375
4 Jalgaon J. 4500 2935 3420 278 165 1154 1722 5.5 18 1895 371
5 Division 21322 8196 24226 1170 355 4108 7407 15.5 82 4042 1397
HT
Conductor
replaceme
nt in Km.
25
18
10
34
87
MAHARASHTRA STATE ELECTRICITY DISTRIBUTION CO.LTD.
DIVISION OFFICE MALKAPUR
Name of
Sr. No. Sub-
Division % Loss HT/LT % Loss LT
2007-08 2008-09 % rise/Fall 2007-08 2008-09
1 Malkapur 15.26 13.51 -1.75 30.16 28.52
2 Nandura 30.56 36.92 6.36 31.37 37.91
3 Motala 17.34 27.26 9.92 17.36 27.45
4 Jalgaon J. 46.41 31.89 -14.52 48.82 33.41
5 Division 24.87 23.47 -1.4 33.12 32.16
Executive Engineer
ON CO.LTD.
B- 10
% Loss LT
% rise/Fall
-1.64
6.54
10.09
-15.41
-0.96
Executive Engineer
M.S.E.D.C.L.
Malkapur
Progress of Feeders selecd for GFSS III
Point No. B-11
Provision Survey Work Done
SR. NAME OF THE 11
Agency LT HT TF. LT HT TF. LT HT TF.
NO. KV FEEDER Remark
KM Km No. KM Km No. KM Km No.
1 7
1 Nimgaon ^ Suyog Elct. Khamgaon 1.2 4.9 5 0.5
2 Karmoda ^ Suyog Elct. Khamgaon 0.5 0 0 0.5
3 Asalgaon ^ Suyog Elct. Khamgaon 0.5 2.5 3 Nil Nil Nil
4 P'Kale ^ Suyog Elct. Khamgaon 0.6 6.5 6 Nil Nil Nil
5 Adol ^ Suyog Elct. Khamgaon 0.3 1 2 Nil Nil Nil
6 Deodhaba ^ Suyog Elct. Khamgaon 1 7 4 Nil Nil Nil
7 Rantham ^ Suyog Elct. Khamgaon 0.06 2 1 Nil Nil Nil
8 Narvel ^ Suyog Elct. Khamgaon 0.06 1 1 Nil Nil Nil
9 W.Bakal ^ Suyog Elct. Khamgaon 0.36 1.9 2 Nil Nil Nil
Original Feeder
10 Makodi ^ Om NamoShivay Elect. Akola 1.02 8.8 8 Not complited
11 Tarapur ^ Om NamoShivay Elect. Akola 0.36 2.5 5 0.36 2.5 5
12 Nalganga ^ Om NamoShivay Elect. Akola 0.36 6.5 5 0.36 6.5 5
13 Fuli ^ Global Nandura 0.78 5.9 5
14 Shemba ^ Global Nandura 0.24 0.8 2 0.24 0.5 1
15 Wadner ^ Global Nandura 2.62 16.5 6
16 Chandur ^ Global Nandura 0.12 1 1
17 Naigaon ^ Global Nandura 0.12 0.6 1
18 Kolasar ^ Global Nandura 0.12 2 1
19 Dh.Badhe ^ Boche, Akola 0.42 8 7 0.42 3 3 0.24 1.5 2
20 Panhera ^ Boche, Akola 0.42 5 6 … … …
21 Nipana ^ Boche, Akola 0.5 4 4 … … …
22 P'Devi ^ Boche, Akola 0.5 5 5 … … ….
23 Motala Town ^ D.K. Elect.Motala 2.34 15.5 20 1 5 5 40 Pole erected
Total 14.5 108.9 100
* 9 Mtr RSJ & PSC Pole Not Received
Suyog Elct. Khamgaon : 9422184825 Boche, Akola : 9922702099
Om NamoShivay Elect. Akola : 9922453727 D.K. Elect.Motala : 9881754137 Executive Engineer
Global Nandura : 9423146993 M.S.E.D.C.L.
Malkapur
Handing over of paid pending cases of RGGVY to contractor with respect to target
up to Date 20.11.09
Point No. : B-12
1 Dadulgaon Jalgaon 5 0 0 0.24 11.12.08 5.3.09 16.3.09 08.04.09 T.R. Not Received
2 Mahuli Jalgaon 3 22.4.09
3 P. Kale Jalgaon 30 0.24 6.5.09 Sent To Circle For San
4 Umapur Jalgaon 5 0.06 13.5.09 7/12 not Attached G.No. Not given
Total
Fq.
Sr. Total A- 1 Sanc
Taluka Issue Paid T.R. Connected
No. Cases Recei tion
d
ved
Motala 23 23 21 19 15 10 3
Malkapur 2 0 0 0 0 0 0
Nandura 5 5 5 5 5 5 3
Jalgaon 5 4 1 1 1 0 0
Total 35 32 27 25 21 15 6
INFORMATION OF PENDING PUBLIC WATER WORKS As on 19.11.09
Point No. : B-13
A-1
Taluka San. Paid TR LR Conn
Rec.
Malkapur 5 4 2 1 0 1
Motala 6 4 1 0 0
Buldhana 2 1 0 0 0
Nandura 10 9 4 2 1
Jalgaon 4 0 0 0 0
Total 27 18 7 3 1
Information of Jalswaraj Prakalp As on 19.11.09
Sr. Name of G.P. load Name of Village Block Date of Date of Provision Dt. Of Remarks
No. A-1 conn.
Sanctione FQ Paid T.R. LT HT DTC
d
1 Wadi Wadi Nandura 07.11.05 30.01.06 30.01.06 02.02.06 Yes 26.10.0
2 Awadh Bk. Awadh Bk Nandura 16.05.08 26-03-09 31.3.09 13.7.09 17.7.09 0.75 0 0 CC&RF Work Not Complited by Applicant
3 Awadh Kd. Nandura 16.05.08 Yes Yes Shifting Estimate
4 Narayanpur Nandura 16.05.08 Yes Yes Shifting Estimate
5 Patonda Patonda Nandura 08.08.05 Yes Yes Yes Yes 30.11.05
6 Kodarkhed Nandura A-1 Not
1 Palskhed 5 Palaskhed Jalgaon J. 08.11.06 19.09.06 19.06.06 08.11.06 31.01.07 0.06 0 0 30.06.07
2 Borada Bk. 10 Borada Bk. Jalgaon J. 07.05.05 17.06.06 Yes 27.06.06 10.07.06 0.45 0 0 05.06.07
3 Zadegaon 7.5 Zadegaon Jalgaon J. 20.11.06 22.02.07 22.02.07 25.02.07 12.03.07 0.3 0 0 31.03.08
4 Mdakhed Bk 5 Madakhed Bk Jalgaon J. 24.02.06 13.03.06 Yes 27.03.06 Yes 0.18 0 0 30.09.06
5 Madakhed 5 Madakhed Kd Jalgaon J. 3.9.07 ccrf 17.04.09 28.3.09 5.5.09 Yes 0.1 0 0 20.09.09
6 Sungaon 10 Chalthana Jalgaon J. 26.06.06 04.12.06 Yes 06.12.06 18.12.06 0.36 0 0 30.04.07
7 Kaupata Jalgaon J. A-1 not
8 5 Usra Bk.& Kd. Jalgaon J. 29.12.06 yes 18.03.07 31.03.07 21.01.09 0.18 0 0 01.02.09
9 Kuwardeo 5 Sonbardi Jalgaon J. 29.12.06 31.03.07 31.03.07 31.03.07 15.02.08 0.12 0 0 12.03.09
10 Bhingara Bhingara Jalgaon J. A-1 not
11 Chalnstapari Jalgaon J. A-1 not
12 Rasulpur 5 Rasulpur Jalgaon J. 27.10.05 05.01.06 05.01.06 24.01.06 30.01.09 0.06 0 0 27.03.06
13 5 Rajura Bk Jalgaon J. 10.01.06 25.01.06 25.01.06 31.01.06 01.02.06 0.12 0 0 27.03.06
14 5 Nimkhedi Jalgaon J. 06.01.06 04.02.06 Yes 23.03.06 29.03.06 0.18 0 0 11.04.06
15 Umapur 3 Charvan Jalgaon J. 18.02.06 21.04.06 21.04.06 24.04.06 25.04.06 0.24 0 0 12.05.06
16 3 Raipur Jalgaon J. 29.09.08 30.09.08 30.09.08 30.3.09 18.4.09 SL 0 0 Installation not ready
17 Garpeth Jalgaon J. A-1 not
18 Palshi Supo 7.5 Palshi Supo Jalgaon J. 29.04.06 04.12.08 yes 31.03.07 Yes 0.12 0 0 20.3.09 Connected
19 5 Nav Kd. Jalgaon J. 18.01.08 16.02.09 21.01.09 0.33 0 0 Not paid
20 7.5 Mohidipur Jalgaon J. 06.06.08 17.04.09 28.4.09 15.6.09 0.06 0 0 Work Handed over to Contractor M/s Domrshwar
21 Gorada Jalgaon J. A-1 not A -1 Not
22 Khandwi 7.5 Khandwi Jalgaon J. 22.05.08 20.02.09 21.02.09 27.2.09 10.6.09 0.12 0 0 22.6.09 Connected
23 Dhanora 7.5 Dhanora Jalgaon J. 13.04.06 04.05.06 18.05.06 18.05.06 06.08.06 0.12 0 0 23.06.06
24 Wadshingi 7.5 & 12.5
Wadshingi Jalgaon J. 22.05.07 28.06.06 yes 28.12.06 24.04.08 SL 1.3 63 15.05.08
25 Aasalgaon 3 Takali Khati Jalgaon J. 1.12.06 27.02.06 05.03.06 15.03.06 2.3.09 0.18 0 0 13.4.09 Connected
Sr. Name of G.P. load Name of Village Block Date of Date of Provision Dt. Of Remarks
No. A-1 conn.
Sanctione FQ Paid T.R. LT HT DTC
d
26 3 Wadi Bk & Kd. Jalgaon J. 16.09.08 12.12.08 16.12.08 27.12.08 Yes 0.24 0 0 21.3.09
27 Sawargaon 7.5 & 5 Sawargaon 2 nos Jalgaon J. 05.01.09 5.3.09 5.3.09 21.3.09 yes 0.12 0 0 25.6.09 Two conn released
28 BhendWad Bk. 20 Bhendwad Bk Jalgaon J. 19.05.06 23.05.06 25.03.06 29.05.06 03.05.07 0.24 0 0 05.06.07
29 BhendWad Kd. 7.5 BhendWad Kd. Jalgaon J. 16.10.06 21.11.06 24.12.06 31.03.06 27.02.07 0.1 0 0 01.02.08
30 Kurangad Bk. 3 Kurangad Bk. Jalgaon J. 16.06.06 07.09.06 Yes 09.10.06 15.12.06 0.18 0 0 10.04.08
31 KaJegaon 7.5 Kajegaon Jalgaon J. YES 30.03.07 30.03.07 31.03.07 09.10.07 SL 0 0 16.06.07
32 Borada Kd. 5 Borada Kd. Jalgaon J. YES Yes 31.03.07 31.03.07 19.05.07 0.06 0 0 30.05.08
33 Kurangaon Kd. 5 Taroda Bk Jalgaon J. 14.05.08 24.06.08 Yes 03.07.08 0.12 0 0 L. R. Instalation Not Ready
34 5 Taroda Kd. Jalgaon J. 21.5.07 9.4.09 21.4.09 23.4.09 0.24 0 0 20.09.09
35 Sulej 7.5 Sulej Jalgaon J. 29.12.06 23.03.07 yes 30.04.07 30.04.07 0.12 0 0 07.04.08
36 Wadgaon Paten 5 Wadgaon Patan Jalgaon J. 21.01.09 20.02.09 21.02.09 9.3.09 8.7.09 0.36 0 0 20.09.09 CC & RF
37 5 Patan Jalgaon J. 21.01.09 20.02.09 21.02.09 4.3.09 1.6.09 0.06 0 0 9.6.09 Connected
38 5 Parashrampur Jalgaon J. 22.01.07 31.03.08 yes 02.06.08 Yes 0.3 0 0 13.08.08 1 Ph 2w to 3Ph 4 w
39 Chawra 5 Chawara Jalgaon J. 10.07.06 26.5.09 1.6.09 5.6.09 12.6.09 0.06 0 0 Work Handed over to Contractor M/s Domrshwar
1 Motala MTL 6 4 3 3 3 3 3
2 Nandura NDR 6 5 5 3 5 3 2
3 Nandura KHM 2 2 2 2 2 2 2
4 Jalgaon J. JAL 40 35 35 35 34 30 30
5 Jalgaon J. SANG 1 1 1 1 1 0 0
Total 55 47 46 44 45 38 37
Paid Pending List of LT IP Consumer who have submited test report
Point No : B- 14
S.
NAME OF APPLICANT S/Dn VILLAGE LOAD Date of A1 SANCTION NO &DATE DOP Dt of TR Remark
N
1 Balkrushna W. Kute Nandura Tarwadi 10 02.01.09 EE/MLK/CC&RF/169 Dt 29.04.09 08.05.09 13.08.09 Land Dispute
Point No. : B- 16
OTSP Malkapur 9 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Motala 9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Nandura 4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Jalgaon 2 8 5 0 0 0 0 0 0 0 0 0 0 0 0.9 0 0
Total 24 9 5 0 0 0 0 0 0 0 0 0 0 0 0.9 0 0
DTC
Achieve.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Tenderwise progress report
Point No. - B- 17 upto 15.11.2009
Sr.No. Tender Tender Name Name of Name contractor % Rate Date of LOA Period of Contract Provision of Work Achievement Remark if any
No. Division/Sub Quoted Completion Amount Rs, In
division lakhs (Tender
Cost/ Contractor
Cost)
H.T. Line L.T. Line Dist. Service H.T. Line L.T. Line Dist. Service
in KM in KM T/F.in Connection in KM in KM T/F.in Connecti
KVA KVA on
8 Sp Desighn T/F Malkapur Dn. M/S Isotech 25 nos 20 nos SDT ERRECTED
T-07
Khmgaon
SPP-III tender Work completed in Buldana Circle.
Point No. - B- 17
Sr.N Tender Tender Name Name of Name contractor % Rate Date of LOA Period of Contract Provision of Work Achievement up to date Remark if any
o. No. Division/Sub Quoted Completion Amount Rs, In
division lakhs (Tender
Cost/ Contractor
Cost)
H.T. L.T. Dist. Service H.T. Line L.T. Line Dist. Service
Line in Line in T/F.in Connectio in KM in KM T/F.in Connecti
KM KM KVA n KVA on
1 T-32 ``DO`` Malkapur/M M/s. Swarsudha 2.51 % 7559 dtd 3 months 44.56/43.44
otala Electricals,Achal Below 26.12.08 &
pur Ext. 3330
11 17 63*12 140 9.73 31.50 12*63 160
dtd 05.06.09
2 T-38 Ag pump Malkapur/M M/s Rambad 9 % Below 340 dtd 3 months 48.92/42.98 Rambad
Connection in LK,Nandura, Electromagnetic 15.01.09 & (50% order to Nagpur
Malkapur,Nandura Jalgaon.Jam Nagpur & M/s. 339 DTD both the
& Jalgaon Jamod od Someshwar 15.01.09 contractor) 11 21 63*12 175 0.20 18.50 1*63 135
S/Dn. Electrical,Khamg
aon
Point No. - B- 17
Sr.No Tender Tender Name Name of Name contractor % Rate Date of LOA Period of Contract Provision of Work Achievement Remark if
. No. Division/Sub Quoted Completion Amount Rs, In any
division lakhs (Tender
Cost/ Contractor
Cost)
H.T. Line L.T. Line Dist. Service H.T. Line L.T. Line Dist. Service
in KM in KM T/F.in Connection in KM in KM T/F.in Connecti
KVA KVA on
1 T-49 Electrification under Jalgaon M/s. Someshwar 1.0% Below 612 dtd 12 Months 46.42/45.96 1265 no.
RE Scheme. Jamod/Malka Electricals 22.01.09 1*100 & RCI ,Ag.& 50
pur Cont.Khamgaon. 4 5 no. St. Light 5.20 19.77 6*63 116
8*63
2 T-50 Electrification work Jalgaon M/s.Deep 2 % Below 616 dtd 12 Months 11.31/11.31 19 no.RCI &
under ND & Other Jamod/Malka Electricals Akola 22.01.09 AG 10 no. St
scheme pur 1.1 3.1 3*63 ligh 0.00 3.96 0 35
3 T-63 Electrification works Nandura/Malk M/s.Urja & 6.0 % below 498 20.01.09 12 Months 20.91/19.66 20 RCI ,Ag &
under ND & Other apur Associates,Mumba 1*100 & 50 no. st
works i. 1.4 6.1 light 0.55 2.07 2*63
4*63
4 T-64 Electrification works Nandura/Malk M/s.Urja & 7.5 % Nelow 499 dtd 12 Months 48.42/44.79 1215
under RE works apur Associates,Mumba 20.01.09 no.RCI,Ag &
i. 1*100 & 110 no.
3 9 1.10 4.00 6*63
6*63 St.light
6 T-108 Electrification under Malkapur/Mal M/s. Someshwar At par 1655 dtd 12 Months 45.66/45.66 Lakh
RE& other scheme kapur Electricals 17.03.09
Cont.Khamgaon.
Point No. - B- 17 upto 15.11.2009
Sr.N Tender Tender Name Name of Name contractor % Rate Date of Period of Contract Provision of Work Achievement Remark if any
o. No. Division/Sub Quoted LOA Completion Amount Rs, In
division lakhs (Tender
Cost/ Contractor
Cost)
H.T. Line in L.T. Line in Dist. Service H.T. Line L.T. Line Dist. Service
KM KM T/F.in Connection in KM in KM T/F.in Connectio
KVA KVA n
1 GFSS-1 Scheme
under Buldana
Circle.CE/DSPC/GFS
/T-11/617/12049 dtd Buldana M/s. 43*100
T-1 15,17.05.2006 4570.73 284.45 0 171 11 72*63
Circle SPML,Kolkatta 663*63
HT
Connectio
Malkapur Division n IP W/W. DL St/Light HT DTC LT
W/W. IP DL St/Light
Name of S/Dn. LT HT DTC LT HT DTC LT HT DTC LT HT DTC
Jalgaon J. 0.06 0 0 0 0 0 0 0 0 0 0 0 0
B- 23
Sub : Major Material Balance at Datala Store as on 30-10-2009
Sr. No. Name of Material Unit Qty Remarka
1 Distribution T/F. 63 KVA No. 3
2 Distribution T/F. 100 KVA No. 13 For G.F.S.S. -III
3 Distribution T/F. 200 KVA No. 3
4 Single Phase Meter No. 488
5 Three Phase Meter No. 3740
6 AAC & Conductor Km. 239 Km. / 41 Drum
7 AAC 34 Sqmm Km. 218 Km / 22 Drum
8 AAC 55 Sqmm Km. 16.4/ 2 Drum
9 AAC 100 Sqmm. Km. 8.2
10 ACSR O 3 Km. 2.3
11 ACSR O 75 Km. 36 Km/ 9 Drum
12 ACSR DOG Km. 4.2 Km/ 2 Drum
13 RSJ Pole 7x3.5 Nos NIL
14 RSJ Pole 5 X 3 Nos 197
15 RSJ Pole 4 X 4.4 Nos 1
16 RSJ Pole 6 X 6 Nos 1
17 Power Calbe 95 Sqmm Mtr 60
18 Power Calbe 185 Sqmm Mtr 160
19 PVC Cable 70 Sqmm Mtr 8
20 PVC Cable 120 Sqmm Mtr 380
21 PVC Cable 185 Sqmm Mtr 3.4
22 PVC Cable 240 Sqmm Mtr 193
23 CT Operated Meter 50X5 Nos. 0
24 Distribution Box 63 KVA No.s 94
25 Distribution Box 100 KVA Nos 109
26 Distribution Box 200 KVA Nos 24
27 HG Fuse Set 189
28 11 KV Disc insulator Nos. 1509
29 11 KV Pin Insulator Nos 1200
Executive Engineer
M.S.E.D.C.L.
Malkapur
Sub:- List of unelectrified villages as per New Defenation
Point No. :B- 24