METHOD STATEMENT O !NSTALLAT!ON O D"CT#O$K
!NSTALLAT!ON O %&! D"CT#O$K
'&( SCOPE O #O$K
The Method Statement is applicable to all EA, KEA, TEA & OA Ductwork at service Floors and isers onl! and
also "or #omplete $EA & %EA Ductwork at all "loors as per the attached schedule&
)&( $ESPONS!B!L!T*
'e"ore commencement o" an! installation activit!, the "ollowin( procedures are re)uired to be carried out&
*&+ All materials used must have an approved material submittal&
*&* All Ductwork shall be installed as per approved construction drawin(s and the attached schedule o" Duct
#onstruction and Supports&
*&, #heck all openin(s in slab or walls are provided b! Main #ontractor&
*&- All Ductwork shall be installed in a neat and tid! "ashion&
+&( DESC$!PT!ON O #O$K
+&' !n,tallation Proce-.re
,&+&+ Ductwork (enerall! will be "abricated o"" site there"ore check that si.e and len(th o" ductwork supplied
con"orms with the site re)uirements&
,&+&* Determine the position o" the ductwork supports and mark out on the concrete, makin( allowance "or
insulation thickness and claddin( where applicable& Drill the holes in the concrete "or the anchor "i/in(s
usin( the appropriate si.e drill as recommended b! the anchor0"i/in( manu"acturer&
,&+&, Fi/ supports in position ensurin( that all "i/in(s are secure&
,&+&- Ensure there are no obstructions in the ductwork&
,&+&1 The ductwork will be li"ted manuall! into the supports and ali(ned with the precedin( len(th o" installed
ductwork, ensurin( that all levels and dimensions are correct as per the approved construction drawin(s&
O""sets due to site coordination re)uirements ma! be permitted and shall be indicated on as0"itted drawin(s
,&+&2 The approved ductwork sealant will be applied to the 3oints and usin( the approved duct "astenin(s 4bolts
and nuts, mechanicall! closed rivets etc&5 the 3oint will be made airti(ht& An! e/cess sealant will be
removed and the 3oint le"t in a clean and tid! "ashion&
,&+&6 7ardwood inserts will be installed as necessar!&
,&+&8 Open ductwork ends to be temporaril! sealed be"ore leavin( the work"orce each da!&
,&+&9 Testin( all 3oints ph!sicall! "or the Sealant and nut & bolts&
,&+&+: ;nsulation to be done as per approved method statement&
,&+&++ ;nspection re)uest will be (iven "or consultant<s approval o" duct installation&
/&( LABO"$0 PLANT 1 MATE$!AL $E2"!$EMENTS
-&+ The material shall be o" approved Manu"acturer as per the material submittal&
-&* Skilled technicians, in su""icient numbers, shall carr! out the installation&
-&, The workmanship shall be maintained at all times&
3&( S"PE$4!S!ON A$$AN%EMENTS
1&+ A constant supervision b! the "oreman and supervisor shall be carried out in order to control the work and
the workmanship&
1&* E/perienced supervisors shall be appointed to carr! out the work smoothl! and to have the "ull control o"
the labour&
5&( TEMPO$A$* #O$KS TO BE DES!%NATED AND !NSTALLED
=>A
6&( HEALTH 1 SAET* $E2"!$EMENTS
6&+ Ensure work area is clean and tid!&
6&* Ensure the work Area is well ventilated&
6&, All emplo!ees shall adopt sa"e workin( practices&
6&- Sa"et! e)uipment 4e/ample 7ard 7ats, Sa"et! Shoes, #overalls, $loves, $o((les when necessar! etc&5 to
be worn at all times&
7&( EN4!$ONMENTAL $E2"!$EMENTS
8&+ A Sa"et! o""icer shall ensure that the labour has a (ood workin( environment, a ha.ard "ree environment&
8&( SEC"$!T* A$$AN%EMENTS
=>A
'(&( SPEC!!C CONT$ACT"AL OBL!%AT!ONS
+:&+ Technical Speci"ications Mechanical S!stems Section +18+1
+:&* 7eatin( and ?entilation #ontractors Association D@>+--
''&( $EE$ENCE DOC"MENTS
++&+ elevant drawin( issued "or construction
++&* Technical Speci"ications Mechanical S!stems Section +18+1
++&* 7eatin( and ?entilation #ontractors Association D@>+--
Prepare- 9:: K& Lin;anna $evie<e- 9:: Caner Tona= Approve- 9:: Caner Tona=

Si;nat.re: Si;nat.re: Si;nat.re:
Prepare- 9:: K& Lin;anna $evie<e- 9:: Caner Tona= Approve- 9:: Caner Tona=
Si;nat.re: Si;nat.re: Si;nat.re:

You might also like