BID CLARIFICATION

Inquiry No. :
Clarification No. :
Bidder :
Technical /
Commercial
Discipline
Query No.

Reference
Document no.

Question
Title

Clarification by Bidder

Reply by FDH JV

Technical

SOW

Contractor will review and if required reengineer/redesign


the laboratory functional specifications and layout for all
four laboratory rooms and the sample receiving room only?

Contractor to review and provide input as required to redesign the current lay-out and room sizes of the Laboratory
Building to meet the functional requirements. Contractor to provide lay-outs of all rooms defined under 'Laboratory
Operational Area' in P6002utile.165.10.17.014_C Attachment 1, section B

Technical

SOW

Fluor Greenville will design the complete building (incl.


static calculations, building equipment, office rooms &
equipment)?

AA is responsible for the design of the building as a whole and for all rooms mentioned under
P6002utile.165.10.17.014_C Attachment 1, section A Offices and Suport area and section C Common Support facilities.
BB is responsible for detailed design. The design of the building structure, exterior, building equipment, offices and
office furniture are not in Contractors scope

Technical

SOW

Will direct communication with the architectural team be


possible?

Direct communication with the architectural team in US, is possible. Frequent communication via email or teleconference
is antissipated to allow parallel development of the laboratoy functional specifications and lay-out and the design of the
building as a whole.

Technical

SOW

The provided Building Design Description


(P6002utile.165.10.17.014_C) contains a list analysis &
test methods for the certificate laboratory with
hydrocarbon products.
Will the Contractor receive such a list of analysis and test
methods also for the other laboratories and sampling
schedules for all four laboratories?
If test methods are used which are not commonly available
(such vendor specific test methods) - will Contractor get
full access to those specific methods?

Contractor to validate and determine the analysis and test methods for all 4 laboratories and the sampling schedule.
Specific analysis and test requirements are provided for each refinery proces unit, as an example P6002utile-133-08R09_A provides the minimum test methods for unit 133.

Technical

Laboratory
Functional
Specificati
ons

Please clarify
Service Contactor shall review and refine the laboratory
operational requirements including:
b. Support areas for all functions
c. Maintenance and service requirements
d. Flexibility and multi-function area

Contractor to review the complete building lay-out and building desing description and provide input to Company, by
taking into account:
b.
b. the functional requirement, e.g. people flow, material flow, use of rooms, number of offices required, occupancy level
of the building and indiviual rooms, possibility to use a area for different functions, utilities required for each
laboratory/function.

Technical

Laboratory Service Contactor shall perform a task and link analysis for
Functional the laboratory.
Specificati This means a workflow analysis - correct?
ons

Task analysis: Contractor to perform a study to idenify the relevant human elements in tasks and to identify the ErrorLikely Situations and Accident-Prone Situations in these tasks.
Link analysis: Contractor to perform a study on the paths/routes of people with their points of interface based on, among
others, their tasks, organization, job procedures and required communication.
Goal is to provide an optimized design that reduces the chance of human errors, risks, stress, fatigue and safety issues.

Technical

Service Contactor shall check the specifications, design


codes, DEPs, standards and regulations that are
Laboratory
applicable to Service Contactors engineering services.
Functional
Does the provided RFP documents contain all design
Specificati
codes, DEPS, etc. to be checked if not please specify
ons
the additional amount and if possible provide the
documents.

All specifications and codes to be checked are included in the RFP.

Technical

Laboratory
Functional
Specificati
ons

Service Contractor shall prepare the following design data


/ documents
Control system: Concept of Laboratory Information
Management System
Please clarify (diagram of the LIMS and sampling concept,
a table with requirements of the LIMS, or )

The LIMS requirements are provided in P6000CFP.000.10.71.025. Contractor to update and prepare final LIMS
specification.

Remarks

10