Professional Documents
Culture Documents
Creation Date
: 07-Dec-2013
Last Updated
: 07-Dec-2013
Document Control
Revision Details
Date
07-Dec2013
Author
Vinodhkumar R &
Selvaraj R
Versio
n
Change Reference
Draft
1.0
Distribution
S.No
.
Name
Department
Position
1.
Material
Management
Material
Management
VP MM
2.
Mr.BalaSubramania
nV
Mr. Sarfudeen J S
3.
Mr. Rajaram S
Material
Management
Dy.
Manager
4.
Mr. Dheerajkumar S
Material
Management
Dy.
Manager
5.
Mr. Ramasamy M V
Material
Management
Officer
Signature
Sr.
Manager
Date
Process Description
Page
Number
1.
P-01: Purchasing Process flow Indent from User Department to Stock Delivered to
Inventory
2.
10
3.
12
4.
13
5.
16
6.
Annexure Points
18
BRS
ID
BRS Proc
Name
PO01A
Purchase
Indent
(Annexure AN
No 3)
(Annexure AN
No 5)
BRS Description
1.Indent Receipt
User department Process engineer
raise the Indent. Indent will forward to
Head of the department and Plant head
approval. After approval only Purchase
department will process the Indent.
(Annexure AN
No-6 )
Quotation Entry
Purchase user collects the quotation from
supplier and enters in Quotation entry
form with Rate, Taxes Functional and
Quality/Technical specification, Terms and
conditions.
Quote Analysis
Purchase user collected and entered the
quotation details, They will analysis the
rate, term and specification details through
Quotation analysis Localized form
Quote analysis data can convert as Price
GAP
Purchase Encumbrance fulfill the requirement if
the material is capital / Expenses type i.e Non
inventory items based on the Account code
combinations. If inventory items it is difficult to
achieve in oracle standard functionality.
Purchase Proposal document data available. If
user needs the details in existing format.
Document will be Customized Report.
Proposal approval will be sent to VPM manually.
If the Purchase type is Standard then
Standard Purchase Order is created
(Annexure AN
No-7)
5. Receipt Process.
Vendor sends the material
against the PO. Vehicle number
and material details in Gate
entry register.
If Weighment applicable vehicle
moved to Weighbridge for first
weight.
Request sends to quality
person to collect the sample.
After analysis QA gives the
result.
Quality result is accepted.
Stock will be updated in
inventory
Quality result is rejected.
Material return back to Vendor.
6. Cancellation / Short Close of
Purchase orders
Order/Blanket
BRS ID
PO-02A
BRS Proc
Name
Indent
Creation
BRS Description
12
BRS ID
PO-03A
BRS Description
Engineer/Dy. Manager
authorization
Department HOD
b. Approve the indent
after verifying stock
& consumption
pattern and hard
copy of the indent
send to Plant Head.
Plant Head
c. Plant Head will
approve the indent
manually in the hard
copy
14
Department HOD.
b. Approve and Forward
to Plant Head. Option
available to accept or
reject or reassign to
another approver.
c. Approve the Purchase
Requisition in System
BRS ID
BRS Proc
Name
PO-4A
Purchase Officer
BRS Description
a. Prepare/Create Purchase Order
15
Dy. Manager
Sr. Manager
Internal Audit
e. Can approve the PO value upto Rs 1 Lakh
after internal audit. If PO value is more
than 1 Lakh proposal is to be send to
Chairman for procurement approval.
VP Material
VP Finance
Chairman
f.
16
17
BRS Description
a. If the Qty is excess then Purchase communicates to
concerned department. If the department accepts
for excess qty then Purchase accepts the qty with
amendment. If the department rejects the excess
qty then Purchase returns the material to supplier.
PO5A
Receipt Excess/Less
Qty
b. If the Qty is excess/less w.r.to Invoice then MDN is
created stating the shortage of qty. If the qty is
pending w.r.to PO then Purchase follow up with
supplier to receive the shortage qty.
a. Amendment PO shall be released based on budget
approval for additional Qty. As per existing CES,
Amendment PO cannot be released without budget
approval. If there is no budget / any short fall, fresh
budget approval has to be obtained for releasing
the POs
a. Based on indent from user for the excess qty,
amendment issued to the respective Purchase
Order manually
PO5B
Budget Approval
b. Similarly, If the ordered qty is not required and
cancelled, necessary amendment issued to the
respective PO to reverse the budget.
a. Prepare, forward, follow up and get back
amendment purchase orders after internal audit.
b. After preparation of PO, the same is forwarded to
18
a. During Approval
stage Budget is
checked
automatically. If there
is insufficient Budget
then Budget is
approved manually.
After manual
approval the Budget
Create Purchase
Order
(Annexure AN No233)
a. Purchase Requisition
will be created for
the excess qty,
revision will be done
for existing PO.
Create Amendment
Purchase Order
(Annexure AN No-6 )
PO5E
Rejection &
Replacement
is added in system.
a. Revised Purchase
Order is Approved &
Forwarded to next
level through Position
Hierarchy
b. If Need by Date
(Delivery Date) is
changed in the PO reapproval is required.
c. Then revised PO is
released to suppliers.
Amendment.
PO5F
PO5G
a. If the receipt
excess/same qty is
rejected, then Return
to Vendor Process is
done to return the
material back to
Cancellation / short
Closing of Purchase
Order
19
supplier.
a. Any change in
Tax/delivery details it
will be modified in
Receipt
a. PO is cancelled for a
particular line qty for
non supply/short
supply/item is not
required and Budget
will be revised.
b. If PO Quantity is
revised get the new
PR for the Excess
Quantity, but there is
no link between the
PO with PR.
c. If new PR link is
required Create new
PO against the excess
quantity.
20
Annexure Points
S No.
AN
No.
Business Process
RICE Type
Not Feasible
Not Feasible
Monthly break up
demand
From various department
--> Purchase requisition
--> Indent + Approval
(Verify stock & approve)
Gross material
requirement --> Stock
verification --> Net
demand
RFQ - 3 vendors - Vendor
comparison --> PO
Proposal --> Approval
PO Generation /
Authorization / Release
--> PO Amendment with
Authorization
Material receipt -->
Inward inspection Acceptance / rejection
--> Accepted material
Standard
Solution
Standard
Standard
a. Indent to PO Conversion with Quote process
Standard
Standard
move to Stores
8
Reports
Reports
Standard
11
Vendor Creation /
registration process
Vendor rating
10
10
11
12
12
Import PO
Standard
13
13
PO Amendment with
History (Archive)
Standard
14
14
Work Order
Standard
15
15
Standard
16
137
Reports
17
211
Reports
18
125
Standard
19
228
Blanket PO - Release PO
Standard
20
229
Reports
Reports
displayed
21
22
231
232
Item Category
Standard
23
233
Amending PO
Standard
24
New
Standard
23