Professional Documents
Culture Documents
Risk
rating
Serious injury
likely?
Property
damage
likely?
Risk controls
in place?
Whos
responsibility?
Theres a
chance that
leads may
break, or
directors
sudden
responsibility to
There is potential
movement may
inform all
cause the
All personnel
personnel
to be harmed
camera and
should be made
potential
Crew or
seriously, they
aware of the
hazards, as it is
interviewee
their job to
may trip
as they fall, or in
microphone unit
locations.
an extreme case
may become
If needed a non-
under control.
break a bone.
detached from
conductive mat
However, some
leads for
However as we are
the camera
should be
responsibility lies
the
conducting sit
causing it to
with the
over the
various
equipment.
down interviews,
cables, or they
cameraperson
with no movement
shoot is a sit-
should be taped
they should
this is very
down interview,
together.
inform of the
unlikely.
so there will be
director of the
little movement,
setup and of
meaning
equipment
equipment is.
damage is
unlikely.
The
interviewee
The interviewee
will be speaking for
N/A
Ensure the
It is the directors
interviewee has
responsibility to
5AM Productions
may
a lengthy amount
a drink with
become
of time and
them, if not
participants are
dehydrated.
sustained
ensure they
comfortable and
extended speech
their needs
attended to.
become
during the
dehydrated. This
course of the
risk is increased by
interview.
Risk
rating
Serious
injury likely?
There is
potential for
the individual
to be harmed
seriously, they
Crew or
interviewees
head as they
may trip
fall, or in an
over the
extreme case
various
break a bone.
However as we
equipment.
are conducting
sit down
interviews, with
no movement
this is very
unlikely.
Property
damage likely?
Risk controls
in place?
Theres a chance
Whos
responsibility?
Ultimately its the
directors
break, or sudden
responsibility to
movement may
cause the camera
and tripod to fall
and break. Also,
the microphone
unit may become
detached from
the camera
causing it to
break. But, the
shoot is a sitdown interview,
All personnel
should be made
aware of the
leads and their
locations.
If needed a nonconductive mat
should be placed
over the cables,
or they should be
taped together.
inform all
personnel
potential
hazards, as it is
their job to
ensure the set is
under control.
However, some
responsibility lies
with the
cameraperson
they should
so there will be
inform of the
little movement,
director of the
meaning
setup and of
5AM Productions
equipment
damage is
equipment is.
unlikely.
The
interviewee will
be speaking for
a lengthy
amount of time
and sustained
extended
Ensure the
speech may
The
cause them to
interviewee
become
may
dehydrated.
become
This risk is
dehydrated.
increased by
interviewee has a
drink with them,
N/A
of the interview.
we are
It is the directors
responsibility to
ensure that all
participants are
comfortable and
their needs
attended to.
shooting in
summer
months: the
weather is
likely to be
quite hot.
The route to the
As we travel to
location should be
Hastings (via
planned in
car) there is a
chance that an
accident will
occur as we will
be travelling
An accident
via busy
may occur
whilst
travelling to
the
location(s).
motorways.
5
Furthermore,
the area of
Hastings itself
has a number
of country
lanes which can
be difficult to
navigate,
especially in
the dark.
*Note:
There is a high
weather being
is to ensure all
considered as
aspects of the
well.
shoot are
Furthermore, we
planned and
possibility of
should ensure
coordinated to
equipment being
ensure minimal
destroyed in the
well-experienced
event of a
and confident in
coordinate with
collision.
traversing both
motorways and
country lanes. If
necessary, breaks
should be built
route.
5AM Productions
The Risk Assessment for Shoot One can be applied to any interviews being
conducted within Oaks Park High School.
The Risk Assessment for Shoot Two can be applied, generally speaking, to
any interviews filmed on location (i.e. outside of Oaks Park High School)