Jrgen Eide
OTC Houston, Texas A.S.A., 6-9 May 2002
A New Solution for Tandem Offloading of LNG
Project Basis
Vessel Sizes
Use guide-wires
during pull-in
Pull-in and
connection
similar to subsea operations
Remote
operated
connection and
disconnection
Verification Programme
Flexible Pipe
FLPO
End termination
Bend stiffener
End termination
CryoFlex pipe
Shuttle tanker
Bend stiffener
Verification Programme
Flexible Pipe Design
Verification Programme
Flexible Pipe Design
Pressure Testing
Verification Programme
Flexible Pipe Design
Verification Programme
Theoretical Calculations - Hydraulic Flow
Verification Programme
Full Scale Tests - Hydraulic Flow
Verification Programme
Model Test FLPO Test Data
Test
No.
3110
3120
3130
3140
Waves
H S (m)
T P (s)
2.5
4.5
4.5
3.7 / 90
12
15
15
15
Wind
(10 min/10 m)
U W (m/s)
W
15
20
20
20
0
0
45
45
Surface
Current
U C (m/s)
FLPO
Cond.
Mooring
System
0.6
1.2
1.2
1.2
Passive
Passive
Passive
Passive
Turret
Turret
Turret
Turret
Verification Programme
Measured vs. Predicted results
60
50
40
Mean test
Mean calc.
Max. test
Max. calc.
30
20
10
0
3230 3240 3245 3260
Tests number
Verification Programme
Model Test - Conclusions