Professional Documents
Culture Documents
Curriculum Vitae
Personal Details
Name
Place/Date of Birth
Bandung/July 25 , 1982
Gender
Male
th
Religion
Protestant
Current Address
Phone
gindo.saor@yahoo.com
Academic Record
2001-2008
1997-2000
Job Experiences
April 2010 present
Company
List of Project
1.
EPC Coal Fired Steam Power Plant PLTU 1 Sulawesi Tenggara 2x10 MW, Client : PT
PLN Persero
Working as a mechanical engineer who makes technical document for material or services
purchasing, supervise the work of vendors, supervise the construction process of subcontractor. Two (2) month placed on site to help the pre-commissioning process.
2.
EPC Coal Fired Steam Power Plant PLTU NTT, Ende 2x7 MW, Client : PT PLN Persero
Working as a mechanical engineer who makes basic design & detail design, makes technical
document for material or services purchasing, supervise the work of vendors, supervise the
construction process of sub-contractor
3.
EPC Coal Fired Steam Power Plant PLTU Maluku Utara, Tidore 2x7 MW, Client : PT PLN
Persero
Working as a mechanical engineer who makes basic design & detail design, makes technical
document for material or services purchasing, supervise the work of vendors, supervise the
construction process of sub-contractor and named as Person In Charge.
Consultancy Services Feasibility Study Melak Coal Fired Steam Power Plant &
Nunukan Coal Fired Steam Power Plant, Client : PT PLN Persero
Working as a mechanical engineer who makes feasibility study of Small Scale Coal Fired
Steam Power Plant, determine the location, making of Power Plant basic design, and making
of Bid Document.
5.
Consultancy Services Technical Review and Project Cost Review of Galang Batang 2 x
22 MW Coal Fired Steam Power Plant, Client : PT Capital Turbine Indonesia
Working as a mechanical engineer who evaluates addition of new BOQ (bill of quantity) and
progress of Galang Batang 2x22 MW Coal Fired Steam Power Plant.
6.
Proposal Project for New Power Plant Project available on PLNs RUPTL.
Working as a mechanical engineer who prepare all the technical requirement required for the
Proposal such as Mechanical Description and Data Sheet of Schedule.
7.
Consultancy Services Progress Review Project Galang Batang 2x22 MW Coal Fired
Steam Power Plant, Client : PT Capital Turbine Indonesia
Working as a mechanical engineer who evaluates development progress of Galang Batang
2x22 MW until the stage of Power Plant Synchronization.
8.
9.
List of Project
1.
Working as Mechanical Engineer who control the quality of the product produced at
Gun Sealing process
2.
Attending Indonesian Robot Contest / Kontes Robot Indonesia (KRI) as mechanic (certified)
held at Indonesian University (UI) and achieved BEST DESIGN (The Blues Team) on June
3rd 4th, 2006
3.
Organization Experiences
2002 - 2008
1999 - 2002
2003 - 2009
Computer
Familiar with AutoCAD, and Microsoft Office, Minitab Six Sigma Tool (Basic)
Language
Indonesia (Native)