Clay
Actual area Thk of recl
Thickness
(m2)
fill (m)
(m)

0.00
578.03
1250.09
1250.10
1250.10
1250.13
1249.91
1249.91
1249.94
1249.80
1251.64
1251.64
1250.56

Berth area
6.00
6.00
6.00
Negligible or
Negligible or
Negligible or
5.71
5.71
5.30
5.30
4.13
4.12

4.50
4.50
5.00
zero clay
zero clay
zero clay
6.25
4.50
2.50
2.00
3.25
4.25

Clay
Actual area Thk of recl
Thickness
(m2)
fill (m)
(m)

0.00
947.85
208.07
2050.01
449.99
2050.01
449.99
2500.00
2500.00
2500.00
2050.06
449.94
2050.06
449.94
2050.06
449.94
2050.06
449.94
2004.53
495.47
1515.14

Berth area
6.00
6.00
6.00
6.00
6.00
6.00
Negligible or
Negligible or
Negligible or
5.71
5.71
5.71
5.71
5.24
5.24
4.81
4.81
4.39
4.39
4.020

SBC at
SBC at recl
existing
top
SBC check
sand top
(t/sq.m)
(t/sq.m)

33.60
33.60
33.60
thickness
thickness
thickness
33.60
33.60
33.60
33.60
33.60
33.60

Safe
Safe
Safe

735.34
735.34
735.34

Safe
Safe
Safe

Safe
Safe
Safe
Safe
Safe
Safe

2420.41
2420.41
93.30
93.30
34.32
34.32

Safe
Safe
Safe
Safe
Safe
Safe

SBC at
SBC at recl
existing
top
SBC check
sand top
(t/sq.m)
(t/sq.m)

4.25
4.25
4.25
4.25
4.00
4.00
zero clay
zero clay
zero clay
5.00
5.00
3.50
3.50
2.75
2.75
2.50
2.75
3.25
3.25
3.75

33.60
33.60
33.60
33.60
33.60
33.60
thickness
thickness
thickness
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60

SBC check

SBC check

Safe
Safe
Safe
Safe
Safe
Safe

735.34
735.34
735.34
735.34
735.34
735.34

Safe
Safe
Safe
Safe
Safe
Safe

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

2420.41
2420.41
2420.41
2420.41
93.12
93.12
91.83
93.12
34.32
34.32
34.32

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

B13R

Sector

C1
C2
C3
C4
C5
C6
C7
C8
C9
C10
C11
C12
C13R

Sector

D1
D2
D3
D4
D5
D6
D7
D8
D9
D10
D11
D12
D13
D13R

397.62

4.020

3.75

Clay
Actual area Thk of recl
Thickness
(m2)
fill (m)
(m)

0.00
Berth area
228.74
3.619
421.68
3.917
1877.92
5.800
2500.00
5.600
2500.00
5.600
2500.00
4.700
2500.00
5.056
2500.00
5.200
2500.00
4.695
2500.00
4.375
2500.00
3.949
912.72
4.020

33.60

34.32

SBC at
SBC at recl
existing
top
SBC check
sand top
(t/sq.m)
(t/sq.m)

3.75
4.25
4.25
3.50
3.75
4.75
3.75
3.25
2.75
3.00
2.75
3.75

Clay
Actual area Thk of recl
Thickness
(m2)
fill (m)
(m)

Safe

33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

394.02
397.84
421.98
425.41
425.41
418.43
423.10
518.18
125.10
123.93
69.89
41.56

SBC at
SBC at recl
existing
top
SBC check
sand top
(t/sq.m)
(t/sq.m)

0.00
Berth area
0.00
Already reclaimed area
663.28
1.237
4.50
1575.49
1.833
4.50
2500.00
5.600
3.50
2500.00
5.600
3.50
2500.00
5.600
3.50
2500.00
4.700
3.50
2500.00
4.406
3.75
2500.00
4.695
3.75
2500.00
4.149
3.75
2500.00
3.935
3.50
319.43
3.505
3.50
465.21
3.505
3.50

33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

194.02
204.38
248.06
248.06
248.06
96.62
94.62
141.75
136.34
134.22
129.95
129.95

Safe

SBC check

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

SBC check

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

Sector

E1
E2
E3
E4
E5
E6
E7
E8
E9
E10
E11
E12
E13
E13R

Sector

F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F13

Sector

Clay
Actual area Thk of recl
Thickness
(m2)
fill (m)
(m)

SBC at
SBC at recl
existing
top
SBC check
sand top
(t/sq.m)
(t/sq.m)

0.00
Berth area
0.00
Already reclaimed area
1974.53
0.600
5.25
1767.91
1.833
4.00
2335.75
5.600
3.25
2406.35
5.600
3.25
2324.19
5.600
4.00
2359.25
4.700
4.00
2384.39
4.406
5.50
2371.56
4.695
6.50
2471.51
4.149
6.75
2362.23
3.935
5.75
971.47
3.505
4.75
445.72
3.505
4.75

Clay
Actual area Thk of recl
Thickness
(m2)
fill (m)
(m)

0.00
1272.83
2286.32
1557.05
517.34
1799.29
2500.00
2500.00
2500.00
2500.00
2500.00
2500.00
2500.00

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

182.94
204.38
248.06
248.06
248.06
96.62
94.62
141.75
136.34
134.22
129.95
129.95

SBC at
SBC at recl
existing
top
SBC check
sand top
(t/sq.m)
(t/sq.m)

Berth area
2.698
5.50
5.138
5.00
2.724
4.00
1.375
3.25
3.350
3.50
Already reclaimed area
Already reclaimed area
Already reclaimed area
Already reclaimed area
Already reclaimed area
Already reclaimed area
Already reclaimed area

Clay
Actual area Thk of recl
Thickness
(m2)
fill (m)
(m)

33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60

33.60
33.60
33.60
33.60
33.60

Safe
Safe
Safe
Safe
Safe

646.32
765.40
647.59
108.84
128.42

SBC at
SBC at recl
existing
top
SBC check
sand top
(t/sq.m)
(t/sq.m)

SBC check

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

SBC check

Safe
Safe
Safe
Safe
Safe

SBC check

G1
G2
G3
G3R
G4
G4R
G5
G6
G6R
G7
G8
G9
G10
G11
G12
G13

0.00
Berth area
404.85
1.230
5.75
1939.63
4.800
5.00
355.95
4.800
5.00
1336.21
1.000
4.50
305.28
1.000
4.50
646.43
1.300
3.75
1797.96
4.300
3.75
432.56
4.300
3.75
Already reclaimed area
Already reclaimed area
Already reclaimed area
Already reclaimed area
Already reclaimed area
Already reclaimed area
Already reclaimed area

33.60
33.60
33.60
33.60
33.60
33.60
33.60
33.60

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

574.68
748.90
748.90
563.45
563.45
108.09
137.84
137.84

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

SBC at top
S.B.C
of clay
check
(t/sq.m)

Total sett
under
Spacing
recl+coal (m)
load (mm)

Retention
period
(months)

Qty (RM)

Sett during
impr period
(mm)

23.22
28.78
28.78

Safe
Safe
Safe

248.09
248.09
270.47

1.60
1.60
1.60

2.51
2.51
2.81

3,915
8,460
8,742

148.09
148.09
170.47

30.33
30.33
27.24
27.24
29.30
29.30

Safe
Safe
Safe
Safe
Safe
Safe

321.90
249.73
130.26
109.10
230.50
285.80

1.60
1.60
1.60
1.60
1.60
1.60

3.62
2.68
0.53
0.10
2.28
3.08

7,589
6,602
6,373
6,102
3,605
4,164

221.90
149.73
30.26
9.10
130.50
185.80

SBC at top
S.B.C
of clay
check
(t/sq.m)

Total sett
under
Spacing
recl+coal (m)
load (mm)

Retention
period
(months)

28.78
28.78
28.78
28.78
28.78
28.78

Safe
Safe
Safe
Safe
Safe
Safe

240.95
240.95
240.95
240.95
228.99
228.99

1.60
1.40
1.60
1.40
1.60
1.40

2.40
5.32
2.40
5.32
2.23
5.18

30.33
30.33
30.33
30.33
27.24
27.24
27.24
27.24
29.30
29.30
29.30

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

275.73
275.73
206.46
206.46
145.97
145.97
134.19
145.97
186.92
186.92
211.08

1.60
1.40
1.60
1.40
1.60
1.40
1.60
1.40
1.60
1.40
1.60

3.04
6.03
1.98
5.16
0.85
4.05
0.60
4.05
1.65
4.88
2.08

Qty (RM)

6,313
1,814
13,644
3,924
13,413
3,857
11,290
3,247
9,902
2,848
10,684
3,072
10,453
2,959
10,524
3,396
8,041

Sett during
impr period
(mm)

140.95
220.95
140.95
220.95
128.99
208.99

175.73
255.73
106.46
186.46
45.97
125.97
34.19
125.97
86.92
166.92
111.08

29.30

Safe

SBC at top
S.B.C
of clay
check
(t/sq.m)

27.76
27.76
27.76
26.73
26.73
29.81
30.07
29.30
27.76
27.24
28.27
29.30

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

SBC at top
S.B.C
of clay
check
(t/sq.m)

26.73
26.73
26.73
26.73
26.73
29.81
29.81
28.27
28.27
27.24
27.24
27.24

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

211.08

1.40

Total sett
under
Spacing
recl+coal (m)
load (mm)

262.25
295.87
275.21
258.72
274.78
427.40
298.48
267.66
208.43
222.27
209.65
250.74

1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.20

Total sett
under
Spacing
recl+coal (m)
load (mm)

349.25
349.25
258.72
258.72
258.72
308.20
326.77
267.57
316.24
305.97
305.97
305.97

1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.20

5.26

Retention
period
(months)

4.34
5.02
4.67
4.22
4.57
6.94
4.97
4.32
3.01
3.38
3.04
7.20

Retention
period
(months)

5.89
5.89
4.22
4.22
4.22
5.07
5.41
3.60
4.26
4.08
4.08
6.29

2,763

Qty (RM)

1,730
3,290
15,713
21,956
22,277
17,912
15,347
14,705
12,807
12,843
12,522
9,187

Qty (RM)

5,396
12,802
21,956
21,956
21,956
16,307
16,628
16,628
12,068
11,177
1,428
3,256

191.08

Sett during
impr period
(mm)

162.25
195.87
175.21
158.72
174.78
327.40
198.48
167.66
108.43
122.27
109.65
230.74

Sett during
impr period
(mm)

249.25
249.25
158.72
158.72
158.72
208.20
226.77
167.57
216.24
205.97
205.97
285.97

SBC at top
S.B.C
of clay
check
(t/sq.m)

26.73
26.73
26.73
26.73
26.73
29.81
29.81
28.27
28.27
27.24
27.24
27.24

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

SBC at top
S.B.C
of clay
check
(t/sq.m)

26.73
26.73
26.73
27.24
27.24

Safe
Unsafe
Safe
Safe
Safe

SBC at top
S.B.C
of clay
check
(t/sq.m)

Total sett
under
Spacing
recl+coal (m)
load (mm)

324.62
316.30
242.37
242.37
290.56
344.95
446.63
416.06
495.41
450.35
390.04
390.04

1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.50
1.20

Total sett
under
Spacing
recl+coal (m)
load (mm)

325.22
300.13
247.61
263.59
281.04

1.50
1.50
1.50
1.50
1.50

Total sett
under
Spacing
recl+coal (m)
load (mm)

Retention
period
(months)

4.57
5.31
3.85
3.85
4.89
5.73
7.26
5.69
6.43
5.95
5.26
7.02

Retention
period
(months)

4.60
4.22
3.34
3.45
3.75

Retention
period
(months)

Qty (RM)

16,807
13,915
20,203
20,810
20,997
15,985
17,993
19,123
15,734
13,288
4,968
3,564

Qty (RM)

14,388
25,241
16,400
3,684
13,028

Qty (RM)

Sett during
impr period
(mm)

224.62
216.30
142.37
142.37
190.56
244.95
346.63
316.06
395.41
350.35
290.04
370.04

Sett during
impr period
(mm)

225.22
200.13
147.61
163.59
181.04

Sett during
impr period
(mm)

26.73
29.81
29.81
26.73
26.73
27.24
27.24
27.24

Safe
Safe
Safe
Safe
Safe
Safe
Safe
Safe

337.48
300.13
300.13
274.27
274.27
298.16
298.16
298.16

1.50
1.50
1.20
1.50
1.20
1.50
1.50
1.20

4.77
4.22
6.41
3.81
6.15
4.03
4.03
6.26

4,628
21,414
6,149
14,406
5,145
4,764
13,245
4,979

237.48
200.13
280.13
174.27
254.27
198.16
198.16
278.16

You might also like