Tag # SS-311-A
Dated: 30-01-2015
Contents
Technical Data
Job Scope
Pre-Arrangements
Pre-inspection
Maintenance Work
Final Inspection
Box Up
1
Equipment Utilities
Riaz
Tag # SS-311-A
Dated: 30-01-2015
TECHNICAL DATA:
Equipment:
Cat-ion Exchanger
Vendor :
Ecodyne
Dimension
Outer Diameter =
2438 mm
Overall Length =
3886 mm (tan-tan)
Manway (Top) =
18
Media removal =
Design Condition :
Design Pressure =
8.8 kg/cm2.g
24-29 Kg/cm2.g
Materials:
Shell =
Internals =
SS-316
Internal Lining =
Rubber
Resin Type =
2.2m
Resin:
Equipment Utilities
Riaz
10.2 m3
Regeneration Media =
Tag # SS-311-A
Dated: 30-01-2015
Job Scope:
To carry out complete internal inspection and preventive maintenance of Cat-Ion Exchanger
against service notification #2000015109.
Pre-Arrangements:
Blinding of Nozzles
Insert blinds to isolate vessel.
Unloading media
Install unloading nozzles to discharge media. Complete media unloaded by process unit.
Manway Opening
Dismantle top manway for vessel entry.
Removal of Distributer and Header
Removal of both Top and Bottom distributer for chemical cleaning.
Scaffolding Installation
Errection of scaffolding inside the vessel for complete inspection.
Pre-inspection
Pre-inspection was carried by inspection unit and found following major observations:
1. Blisters were found at various locations at top dish end random locations as well as on
manway neck.
3
Equipment Utilities
Riaz
Tag # SS-311-A
Dated: 30-01-2015
2. Fissure type cracks and water filled blisters were observed all over the rubber lining at
shell, bottom plate, top dish end and header support.
3.
Equipment Utilities
Riaz
Tag # SS-311-A
Dated: 30-01-2015
4. Holiday testing was carried out inside the vessels and defects were observed at 45
different locations.
Maintenance Work:
5
Equipment Utilities
Riaz
Tag # SS-311-A
Dated: 30-01-2015
1. Removed distributer both Top (#14) and Bottom (#20) for chemical cleaning and replaced.
Sleeves were also replaced.
2. Power brushing/ cleaning of Shell, top dish end, manway and bottom plate.
3. Dis-Bonding at various locations were rectified by rubber patching.
4. Application of Primer (PR-300) after proper cleanup.
5.
Rubber (KeraButyl) Patching were done at all indicated point with the application of
solution (Keracoll).
Equipment Utilities
Riaz
Tag # SS-311-A
Dated: 30-01-2015
Final Inspection
Final Inspection done by the Inspection unit. DFT and Holiday Testing were performed.
Box up
Unit
Qty
Material Number
Rubber KaraButyl
m2
1230000059
Keracoll Solution
KG
1230000063
Primer(PR-300)
TIN
Equipment Utilities
Riaz