KCP-GNS-PLD-DPR-0005

Rev.: 04
Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Onshore Pipeline Project Data

Page 1 of 14

Onshore Pipeline Project Data

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or
warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees,
advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-PLD-DPR-0005
Rev.: 04
Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Onshore Pipeline Project Data

Page 2 of 14

Table of Contents
1 Introduction ...................................................................................................................... 4
1.1 Scope of Document ................................................................................................ 4
1.2 Definitions .............................................................................................................. 4
1.3 Abbreviations ......................................................................................................... 5
1.4 System of Units ...................................................................................................... 5
1.5 Cross References .................................................................................................. 5
2 Assumptions .................................................................................................................... 6
3 Design Requirements ...................................................................................................... 7
3.1 Design Code .......................................................................................................... 7
3.2 Design Life ............................................................................................................. 7
3.3 Process Data ......................................................................................................... 7
3.3.1 Product Composition ................................................................................... 7
3.3.2 Design and Operating Conditions ................................................................ 7
3.3.3 Fluid Classification ...................................................................................... 7
3.4 Mechanical Design ................................................................................................. 8
3.4.1 Design Factors ............................................................................................ 8
3.4.2 Pipe Diameter ............................................................................................. 8
3.4.3 Minimum Wall Thickness ............................................................................. 8
3.5 Materials ................................................................................................................ 8
3.5.1 Linepipe Material ......................................................................................... 8
3.5.2 Corrosion Allowance ................................................................................... 9
3.5.3 External Corrosion Protection...................................................................... 9
3.6 Pipeline Routing ................................................................................................... 10
3.6.1 Co-Ordinate System .................................................................................. 10
3.6.2 Interfaces .................................................................................................. 10
3.6.3 Preliminary Pipeline Routing ..................................................................... 10
3.6.4 Pipeline Crossings .................................................................................... 11
3.6.5 Route Classification................................................................................... 11
3.6.6 Burial Depth .............................................................................................. 11
3.6.7 Pipeline Separation ................................................................................... 11
3.6.8 Weight Coating.......................................................................................... 12
3.7 Environmental Data.............................................................................................. 12
3.7.1 Ground Water Properties .......................................................................... 12
3.7.2 Soil Conditions .......................................................................................... 12
4 Mandatory References .................................................................................................. 13
4.1 Regulations and Statutes ..................................................................................... 13
4.2 Codes and Standards .......................................................................................... 13
5 Supporting References .................................................................................................. 14
5.1 Project Documentation ......................................................................................... 14

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or
warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees,
advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-PLD-DPR-0005
Rev.: 04
Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Onshore Pipeline Project Data

Page 3 of 14

List of Tables
Table 3.3.2-a

Pipeline Operating Parameters ..................................................................................7

Table 3.4.1-a

Onshore Pipeline Design Factors ..............................................................................8

Table 3.5.1-a

Linepipe Material Properties.......................................................................................9

Table 3.5.2-a

Anti-Corrosion Coating Properties .............................................................................9

Table 3.6.1-a

Interface Co-ordinates ............................................................................................. 10

Table 3.6.2-a

List of Crossings ...................................................................................................... 11

Table 3.6.3-a

Concrete Weight Coating Properties ....................................................................... 12

Table of Figures
Figure 1.1

Outline System Schematic .........................................................................................4

Table of Holds
HOLD

Description

Section

CLEARED

CLEARED

CLEARED

CLEARED

CLEARED

CLEARED

CLEARED

Kingsnorth pipeline ESD valve co-ordinates

CLEARED

10

Number of service crossings

3.6.4

11

Number of pipeline crossing

3.6.4

12

CLEARED

13

CLEARED

14

CLEARED

15

CLEARED

3.6.2

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or
warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees,
advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-PLD-DPR-0005
Rev.: 04
Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Onshore Pipeline Project Data

Page 4 of 14

Introduction
1.1 Scope of Document
The purpose of this document is provide the design data for the onshore section of the CO2
pipeline which forms part of Kingsnorth Carbon Capture and Storage Project, Transport
Pipeline and Injection Facilities Project. The document collates all of the design data to be
used and the assumptions to be made in undertaking the design activities.
The limits of the onshore pipeline for this document are shown in Figure 1.1 and are defined
as follows:
Pipeline landfall valve;
Kingsnorth CCS pig launcher.

Figure 1.1 Outline System Schematic


This document will be reviewed and updated as necessary during the course of the design
to reflect changes necessary to meet E-ON requirements.
1.2 Definitions
For the purpose of this document the following definitions shall apply:
COMPANY

E.ON UK or its nominated representative.

CONTRACTOR

The companies designated on the purchase order form as


being the selected Contractor of materials and services.

WORK

The task, process or operation being conducted by the


CONTRACTOR on any tier on behalf of COMPANY.

Shall

Indicates mandatory requirement

Should

Indicates preferred course of action

May

Indicates optional course of action

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or
warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees,
advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-PLD-DPR-0005
Rev.: 04
Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Onshore Pipeline Project Data

Page 5 of 14

In the context of this document, the titles and definitions shall be specific when shown in
upper case and non-specific when shown in lower case
1.3 Abbreviations
Within this document, the following abbreviations are used:
3LPE
AGI
API
ASME
BS
CCS
CPT
ESD
FEED
GOGC
HAT
ID
ISO
NPS
OD
SAWL
SMYS
SMTS
SI

3 Layer Polyethylene
Above Ground Installation
American Petroleum Institute
American Society of Mechanical Engineers
British Standards
Carbon Capture and Storage
Cone Penetration Test
Emergency Shutdown
Front End Engineering Design
Genesis Oil and Gas Consultants
Highest Astronomical Tide
Inside Diameter
International Standardisation Organisation
Nominal Pipe Size
Outside Diameter
Submerged Arc Welding Longitudinal
Specified Minimum Yield Strength
Specified Minimum Tensile Strength
System International

1.4 System of Units


Reference shall be made to the Overall Project Units, KCP-EEN-PCD-DPR-0001 [S7].
1.5 Cross References
Where cross-references to other parts of this document are made, the referenced section
number is shown in brackets.
Other documents referenced by this document are listed in (4) and (5).

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or
warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees,
advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-PLD-DPR-0005
Rev.: 04
Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Onshore Pipeline Project Data

Page 6 of 14

Assumptions
The following assumptions shall be made:
Pipeline will be required to cater for both gas and dense phase flow;
The CO2 will be dried to better than 100ppmv. However, the specification delivered to the
pipeline will ensure that no free water or hydrate potential will exist in the pipeline or CO2
transport system;
Standard conditions that will govern the design flow rate are assumed as 1.01325bara and
15degC.

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or
warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees,
advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-PLD-DPR-0005
Rev.: 04
Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Onshore Pipeline Project Data

Page 7 of 14

Design Requirements
3.1 Design Code
The onshore pipeline shall be designed in accordance with the requirements of PD 8010-1
[M12].
ASME B31.4 [M15] shall be used to supplement PD 8010-1 [M12] for areas not specifically
addressed by the code.
3.2 Design Life
The pipeline system shall have a design life of 40 years.
3.3 Process Data
3.3.1 Product Composition
The compositional data as presented in the Basis of Design for Studies - Phase 1 [S1] shall
apply.
3.3.2 Design and Operating Conditions
The pressure & temperature conditions which shall apply are summarised in Table 3.3.2-a.
Description

Unit

Value

Design Pressure

barg

150

Maximum Allowable Operating Pressure

barg

150

Maximum Design Temperature

degC

70

Inlet Temperature Range to Onshore Pipeline


at Compressor after cooling - Kingsnorth

degC

40

Minimum Design Temperature

degC

- 85 (1)

Minimum Design Temperature - Materials

degC

- 85 (1)

tonne / day

28000

Design Flow Rate Kingsnorth Only


Table 3.3.2-a

Pipeline Operating Parameters

Note 1: Applies to the onshore section of pipeline ONLY.


The installation temperature for the pipelines is assumed to be 11degC, which is equivalent
to the average minimum temperature (July) for south-east England.
3.3.3 Fluid Classification
For design purposes the dense phase CO2 anticipated to be produced from the Kingsnorth
power station will be classified as Category E substance under PD 8010-1 toxic fluids that
are gases at ambient temperature and atmospheric pressure conditions and are conveyed
as gases and/or liquids.
This classification and treatment of CO2 is subject to confirmation by 3rd parties.

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or
warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees,
advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-PLD-DPR-0005
Rev.: 04
Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Onshore Pipeline Project Data

Page 8 of 14

3.4 Mechanical Design


3.4.1 Design Factors
Design hoop stress factors for the onshore pipeline section in accordance with the
requirements of PD 8010-1 [M12] are shown in Table 3.4.1-a below:
Location

Design Factor (fd)

General Route

0.72

Crossings

0.30

AGI

0.30

Table 3.4.1-a

Onshore Pipeline Design Factors

3.4.2 Pipe Diameter


The onshore section of the CO2 pipeline shall be designed to match the offshore pipeline
requirements.
The offshore pipeline shall be 36-inch NPS 914mm OD and the pipeline shall have a
constant ID to allow smooth transit of pigs.
3.4.3 Minimum Wall Thickness
In accordance with standard industry practice, the diameter to wall thickness ratio (D/t) for
the onshore pipeline should not exceed 96 unless it can be demonstrated that higher values
are not detrimental to the construction and in-situ integrity of the pipeline.
3.5 Materials
3.5.1 Linepipe Material
Mechanical calculations shall be based on linepipe of type SAWL in accordance with the
requirements of ISO 3183 [M13]. The selected material grade shall match that of the
offshore pipeline section, which is detailed in the document Offshore Pipeline Project Data
[S5].

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or
warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees,
advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-PLD-DPR-0005
Rev.: 04
Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Onshore Pipeline Project Data

Page 9 of 14

A summary of the material properties are presented in Table 3.5.1-a.


Parameter

Units

Value

Notes

SAWL, ISO 3183 L555M


Material

SAWL, ISO 3183 L485M


SAWL, ISO 3183 L450M
555

SMYS

MPa

485

450
625
SMTS

MPa

570

535
Steel Density
Coefficient of Thermal
Expansion

kg/cu.m

7850

m/m/degC

11.7x10

MPa

207000

W/mK

45

J/kg.degC

500

Youngs Modulus
Thermal Conductivity
Heat Capacity
Table 3.5.1-a
Note 1:

-6

Linepipe Material Properties

SMYS and SMTS values to be de-rated appropriately for the design temperatures
in accordance with the requirements of DNV OS-F101 [M14].

3.5.2 Corrosion Allowance


A preliminary corrosion allowance of 1.5mm shall be assumed.
3.5.3 External Corrosion Protection
The buried sections of the onshore pipeline shall be protected against external corrosion
using an appropriate anti-corrosion coating. Typical properties for a 3 layer polyethylene
(3LPE) coating are presented in Table 3.5.3-a.
Coating Type

3LPE
Table 3.5.3-a

Nominal
Thickness
mm
3.2

Density

Heat Capacity

kg/cu.m

Thermal
Conductivity
W/mK

950

0.35

1800

J/kg.degK

Anti-Corrosion Coating Properties

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or
warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees,
advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-PLD-DPR-0005
Rev.: 04
Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Onshore Pipeline Project Data

Page 10 of 14

3.6 Pipeline Routing


3.6.1 Co-Ordinate System
Onshore data shall be in accordance with OSGB36, the details of which are given below:
Spheroid

Airy 1830

Semi-Major axis a

6377563.396m

Semi-Minor axis b

6356256.910m

First Eccentricity Sq e2

0.0066705397616

Inverse Flattening 1/f

299.3249646

Datum

OSGB36 National Grid

Central Meridian CM

2W UTM Zone 30N, 0W - 6W

Latitude of Origin

49

False Easting

400000m

False Northing

-100000m

Scale Factor on CM

0.9996012717

3.6.2 Interfaces
Table 3.6.2-a lists the location for the landfall valve and Kingsnorth pipeline ESD valve.
The co-ordinates stated are approximate and shall be updated during the design.
Location

Easting

Northing

Landfall Valve

581678

177889

Kingsnorth pipeline ESD valve

HOLD 8

HOLD 8

Table 3.6.2-a

Interface Co-ordinates

3.6.3 Preliminary Pipeline Routing


Preliminary pipeline routing options have been explored and recommendations for the
preferred route are identified in the following document(s):
80223-01

RSK Onshore Pipeline Geotechnical & Geoenvironmental Desk


Based Risk Assessment [S9]

80011-RPT-PL-020

Penspen Onshore Route Corridor Evaluation Workshop Report [S8]

The recommended route is shown on the Onshore Pipeline Route Map [S6] and discussed
in the Onshore Pipeline Constructability Review [S11].
The onshore section of the CO2 pipeline is approx. 7.8km in length.

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or
warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees,
advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-PLD-DPR-0005
Rev.: 04
Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Onshore Pipeline Project Data

Page 11 of 14

3.6.4 Pipeline Crossings


A summary of the crossings, out with the Kingsnorth site boundary, which have been
identified using satellite imagery are presented in Table 3.6.4-a. This list is preliminary and
should be reviewed following the field survey.
Crossing Type

Reference

Quantity

Major Road

RDX

Minor Road

RDX

Track

TRX

Major River

RVX

Minor River / Stream

STX

Ditch

DTX

16

Railway

RLX

Third Party Service

SVX

HOLD 10

Pipeline

PLX

HOLD 11

Table 3.6.4-a

List of Crossings

3.6.5 Route Classification


Preliminary location classes, in accordance with PD 8010-1, will be adopted to estimate
pipeline wall thickness requirements and proximities. The general pipeline location class
shall be as follows:
Class 2 to be adopted as a minimum for a distance of 800m from Highest Astronomical
Tide HAT as defined in the Offshore Pipeline Project Data [S5] and areas with a population
density greater than 2.5 persons per hectare;
Class 1 for sections along the onshore pipeline route with population densities less than 2.5
persons per hectare.
Final location classifications shall be determined during FEED when a field survey shall be
carried out.
3.6.6 Burial Depth
The pipeline shall be buried along its entire length to a minimum cover of 1.1m. At
crossings, the burial depth shall be increased in accordance with the requirements of PD
8010-1 [M12] or as required by crossing Owner.
3.6.7 Pipeline Separation
The minimum horizontal separation distance between the pipeline and any existing buried
pipelines shall be 5m.

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or
warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees,
advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-PLD-DPR-0005
Rev.: 04
Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Onshore Pipeline Project Data

Page 12 of 14

3.6.8 Weight Coating


At water courses and areas subject to high water table, the pipeline shall be restrained
against float out by the use of cohesive backfill, set-on weights, concrete weight coating or
a combination thereof. The minimum thickness of concrete weight coating shall be 25mm.
The concrete weight coating properties to be adopted are shown in Table 3.6.8-a.
Type

Dry Density
kg/cu.m

Normal Strength Concrete

2400

High Strength Concrete

3040

Table 3.6.8-a

Concrete Weight Coating Properties

3.7 Environmental Data


3.7.1 Ground Water Properties
Density of ground water is assumed as 1025 kg/m3 (seawater equivalent).
3.7.2 Soil Conditions
The geotechnical ground conditions are identified in the following:
80223-01

Onshore Pipeline Geotechnical & Geo-environmental Desk Based


Risk Assessment [S9]

105133R001TA

Static CPT factual report, Moat Farm [S10]

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or
warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees,
advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-PLD-DPR-0005
Rev.: 04
Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Onshore Pipeline Project Data

Page 13 of 14

Mandatory References
The design, fabrication and construction of the pipeline system shall be in accordance with
the latest revisions of the following specifications, codes and standards unless stated
otherwise.
4.1 Regulations and Statutes
[M1] Construction Design & Management Regulations 2007
[M2] Environmental Protection Act 1990
[M3] Health and Safety at Work Act 1974
[M4] Pipeline Safety Regulations 1996
[M5] The Chemicals Hazard Information and Packaging for Supply Regulations 1994 SI
1994 No. 3247
[M6] Pressure Equipment Regulations 1996
[M7] Town and Country Planning Act 1990
[M8] Town and Country Planning Environmental Impact Assessment, England and Wales
Regulations 1999.
[M9] EU ETS - 2005 Greenhouse Gas Emissions Trading Scheme Regulations 2005 as
amended
[M10] F-Gases 2008 The Fluorinated Greenhouse Gases Regulations 2008
4.2 Codes and Standards
[M11] BS EN 14161

Petroleum and Natural Gas Industries Pipeline Transportation


Systems;

[M12] PD 8010-1

Code of Practice for Pipelines - Part 1: Steel Pipelines on Land

[M13] ISO 3183 / API 5L

Petroleum and Natural Gas Industries - Steel Pipe for Pipeline


Transportation Systems;

[M14] DNV OS-F101

Submarine Pipeline Systems

[M15] ASME B31.4

Pipeline Transportation Systems for Liquid Hydrocarbons and


Other Liquids

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or
warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees,
advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.

KCP-GNS-PLD-DPR-0005
Rev.: 04
Project Title:

Kingsnorth Carbon Capture & Storage Project

Document Title:

Onshore Pipeline Project Data

Page 14 of 14

Supporting References
5.1 Project Documentation
[S1]

KCP-GNS-PCD-STU-0001

Kingsnorth CCS Project, Basis of Design for Studies,


Phase 1

[S2]

80011-RPT-EN-001

Kingsnorth Phase II CO2 Pipeline Project, Transport of


CO2 by Pipeline (Penspen)

[S4]

80011-RPT-PM-003

Kingsnorth Phase II CO2 Pipeline Project, Project


Summary Report (Penspen)

[S5]

KCP-GNS-PLD-DPR-0004

Kingsnorth CCS Project, Offshore Pipeline Project


Data

[S6]

KCP-GNS-PLD-MAP-0001

Kingsnorth CCS Project, Onshore Pipeline Route Map

[S7]

KCP-EEN-PCD-DPR-0001

Overall Project Units

[S8]

80011-RPT-PL-020

Kingsnorth Phase II CO2 Pipeline Project, Onshore


Route Corridor Evaluation Workshop Report (Penspen)

[S9]

80223-01

Onshore Pipeline Geotechnical & Geo-environmental


Desk Based Risk Assessment (RSK)

[S10] 105133R001TA

Static CPT factual report, Moat Farm (Lankelma / RSK


Stats Limited)

[S11] KCP-GNS-PLD-REP-0014

Onshore Pipeline Constructability Review

Kingsnorth CCS Demonstration Project


The information contained in this document (the Information) is provided in good faith.
E.ON UK plc, its subcontractors, subsidiaries, affiliates, employees, advisers, and the Department of Energy and Climate Change (DECC) make no representation or
warranty as to the accuracy, reliability or completeness of the Information and neither E.ON UK plc nor any of its subcontractors, subsidiaries, affiliates, employees,
advisers or DECC shall have any liability whatsoever for any direct or indirect loss howsoever arising from the use of the Information by any party.