67% found this document useful (3 votes)
4K views1 page

Check List FM200

The document is a quality control checklist for firefighting works using NOVEC 1230 at a specific location. It lists 11 items to check including approved materials, piping installation, cylinder location, pressure testing, discharge nozzle heads, smoke detectors, electrical devices, and supports. Space is provided for remarks.

Uploaded by

Rajesh Pilakkal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
67% found this document useful (3 votes)
4K views1 page

Check List FM200

The document is a quality control checklist for firefighting works using NOVEC 1230 at a specific location. It lists 11 items to check including approved materials, piping installation, cylinder location, pressure testing, discharge nozzle heads, smoke detectors, electrical devices, and supports. Space is provided for remarks.

Uploaded by

Rajesh Pilakkal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd

Main Contractor

DFC BACKUP CONTROL ROOM

AL FUTTAIM
TECHN
OLOGIE
S

Document No : AFE/CL/FF-01
Rev.
: 0
Date
: 26-01-2015

FIRE FIGHTING WORKS NOVEC 1230


QUALITY CONTROL CHECK LIST
LOCATION / AREA :

Report No :
Date
:
AFE

Check approved Materials are used for installation.

Check the Installation of the Piping System as per the approved drawings
and Method of Statement

.3

Check the location of the Cylinder as per the approved drawings and
Method of Statement

8
9

Check the Painting of the Piping System.

10

Check that all Warning Signs and Labels are fixed as per requirement.
Others

6
7

11

CONSULTANT / REMARKS
CLIENT

Check the Pressure Testing of the Piping system at 40 psi bar for 10 min.
Check that the Discharge Nozzle Head are installed according to the
approved shop drawings
Check that the Smoke Detectors are installed according to the approved
shop drawings
Check that all Electrical Devises / Control Panel are installed according
to the approved shop drawings
Check adequate Supports are provided in the System

AFT

Comments / Discrepancies (if any)

PLEASE FIND ATTACHED EXTRACTS/REDUCTIONS OF REFERENCE DRAWINGS:

Engineer : _____________________
Note: Works in compliance with ITP, Method Statement, and Drawings & Specifications.
CONTRACTOR

CONSULTANT /CLIENT

NAME

NAME:

SIGN

SIGN

DATE

DATE:

Main Contractor
AL FUTTAIM
TECHN
OLOGIE
S
DFC BACKUP CONTROL ROOM
Document No :  AFE/CL/FF-01
Rev.                :  0
Date

You might also like