You are on page 1of 16

A

B
C
D
E

A
B
C
D
E

401
A2-1
1

405
A3-1
0.9

409
B-1
1

415
B-7
1

439
C1-1
1
1

0.71
1

101
A2-1
0.95

0.6

105
A3-1
0.81

109
B1-1
1.26

115
B1-7
1.26

1.6

1
1.6

0.96

139
C1-1
1.26
1.6

443
C2-1
1
1

459
C3-1
1
1
0.71

467
C3-9
0.9
0.9
0.71

147
C2-1
1.26
1

407
A3-3
0.9

409
B-1
1

417
B-9
1

155
C2-9
0.95
0.9

163
C3-1
1.4
1.14

1.6

439
C1-1
1
1

0.71
1

1
1.6

403
A2-3
1

171
C3-9
0.81
0.76

0.6

103
A2-3
0.95

107
A3-3
0.81

109
B1-1
1.26

117
B1-9
1.26

1.6

1
1.6

0.96

447
C2-5
1
1

463
C3-5
1
1

471
C3-13
0.9
0.9

0.71

0.71

151
C2-5
1.26
1

159
C2-13
0.95
0.9

139
C1-1
1.26
1.6

1.6

1.6

167
C3-5
1.4
1.14

175
C3-13
0.81
0.76

VIETNAM OIL AND GAS CORPORATION ( PETROVIETNAM )


DUNG QUAT REFINERY (DQR) PROJECT
1.

GENERAL
Equipment No:

2.

RELEVANT CODES AND STANDARDS


ACI 318-02
UBC 97

T-1502,T-1053 & T-1504

Building Code Requirements for Structural Concrete


Uniform Building Code 97

3.

MATERIAL SPECIFICATIONS

3.1

Strength
Reinforcement bar yield strength
Concrete compressive strength at 28 days (Cylinder)
Anchor bolts : fy(bolt)

3.2

420 MPa
25 MPa
250 MPa

Unit Weight
Reinforced Concrete
Soil
Steel
Water

4.

FOUNDATION DETAIL

4.1

Foundation Outline
Footing shape
Pedestal shape
Foundation type

4.2

4.3

24
18
78
10

Rectangle
Octagonal
Pile

Elevation
Top of pedestal
Top of Foundation

100.30 m
98.70 m

Unit
Ground water level (dw)

100.00 m
98.00 m

Pile Bearing Capacity


V(long term)

1700 KN

(short term)

2267 KN
210 KN
670 KN

H
Uplift
5.

KN/cu-m
KN/cu-m
KN/cu-m
KN/cu-m

FOUNDATION LOADING DATA


Pedestal-1

(T-1504)

Name

Loading Type

A
B

Empty/Dry
Operating

C
D
E

Full of Water
Earthquake
Wind

Vert. Load
kN
70.0
250.0
287.0
0.0
0.0

Pedestal-2

(T-1502&T-1503)

Name

Loading Type

Vert. Load

A
B
C
D

Empty/Dry
Operating
Full of Water
Earthquake

kN
247.0
714.0
997.0
0.0

Wind

0.0

Horizontal Load
Hx (kN)
Hz (kN)
0.0
0.0
0.0
0.0
0.0
60.0
35.0

0.0
60.0
35.0

Horizontal Load
Hx (kN)
Hz (kN)
0.0
0.0
0.0
0.0
0.0
0.0
150.0
150.0
115.0

115.0

Moment Load
Mz (kN-m)
Mx (kN-m)
0.0
0.0
0.0
0.0
0.0
616.0
253.0

0.0
616.0
253.0

Moment Load
Mz (kN-m)
Mx (kN-m)
0.0
0.0
0.0
0.0
0.0
0.0
2920.0
2920.0
1640.0

1640.0

Sum of Pedestal forces at Bottom of Foundation


Name
1
2

A
B

Loading Type
Empty/Dry
Operating

Vert. Load
kN
317.0
964.0

Horizontal Load
Hx (kN)
Hz (kN)
0.0
0.0

0.0
0.0

Moment Load
Mz (kN-m)
Mx (kN-m)
-311.1
-778.9

0.0
0.0

VIETNAM OIL AND GAS CORPORATION ( PETROVIETNAM )


DUNG QUAT REFINERY (DQR) PROJECT

6.

Full of Water

1284.0

0.0

0.0

-1244.4

0.0

4
5

D
E

Earthquake
Wind

0.0
0.0

210.0
150.0

210.0
150.0

4040.0
2253.0

4040.0
2253.0

SHAPE AND DIMENSIONS OF FOUNDATION

h3

PEDESTAL # 2

h2

PEDESTAL # 1

h1
Wx
Px

bz

Wz

Pz

C.W = +ve

C.C.W = -ve
X

b2

7.

FOUNDATION DIMENSIONS & INPUT

7.1

Footing
Thickness of Foundation
Height of Foundation (GL-TOF)
Depth of Foundation (GL-BOF)

h1
Hf
df

0.800 m
1.300 m
2.100 m

Pedestals
Height of Padestals
Soil Cover

h3
h2

1.600 m
1.300 m

Pedestal in X-dir

Px

Pedestal in Z-dir
Area of Padestal
Area (Padestal + d)
Weight of Padestal

Pz

7.2

7.3

7.4

Piles
Dimension of Pile
Length of Pile
Area of Pile
Area (Pile + d)
Saddles
No of Saddles
C/C Distance between Saddles

Dp
Lp

b2

Pedestal-1
1.700 m
1.700 m
2.39 m
4.72 m
91.9 KN

0.800
15.000
0.50
1.74

m
m
m
m

2
4.500 m

Pedestal-2
2.800 m
2.800 m
6.49 m
10.07 m
249.3 KN

VIETNAM OIL AND GAS CORPORATION ( PETROVIETNAM )


DUNG QUAT REFINERY (DQR) PROJECT

7.5

Centroidal Dist. Of Pedestal # 1

2.525 m

Centroidal Dist. Of Pedestal # 2

1.975 m

Footing Dimensions
Footing Size in X-dir
Footing Size in Z-dir

6.750 m
4.500 m
30.38 m
583.2 KN

Wx
Wz

Area of Footing
Weight of Footing
No of Piles
Piles in X-dir
Piles in Z-dir

4
2
2

Pile to edge spacing


Pile to Pile distance in X-dir
Pile to Pile distance in Z-dir
7.6

0.5
4.750 m
2.500 m

bx
bz

Polar Section Modulus


Distance of Piles from Centroid axis
x1
x2
x3
x4

2.375
-2.375
2.375
-2.375

x' = min (x1,x2,..xn)


Ixx
Zpx

m
m
m
m

z1
z2
z3
z4

2.38 m
22.56 m
9.50 m

-1.250
-1.250
1.250
1.250

z' = min (z1,z2,..zn)


Izz
Zpz

Weight of soil above footing

m
m
m
m

1.25 m
6.25 m
5.00 m

365 kN
1289.0 KN

Total Weight (Wd)


Footing Weight per 1 m

19.20 KN/m2

Soil Weight per 1 m

23.40 KN/m2

Total Weight per 1 m

42.60 KN/m2

8.

STABILITY CHECK

8.1

Unfactored Loading Combinations


A2-1

Erection with Wind

Short term

A3-1
B-1
B-7
C1-1
C2-1

Erection with Earthquake


Test without Wind
Test with Wind
Operating without Wind
Operating with Wind

Short term
Long term
Short term
Long term
Short term

C3-1
C3-9
A2-3
A3-3
B-1
B-9

Earthquake with Operating


Earthquake with Operating
Erection with Wind
Erection with Earthquake
Test without Wind
Test with Wind

Short term
Short term
Short term
Short term
Long term
Short term

C1-1
C2-5
C3-5
C3-13

Operating without Wind


Operating with Wind
Earthquake with Operating
Earthquake with Operating

Long term
Short term
Short term
Short term

8.2

Unfactored Load at Bottom of Footing

8.2.1

Longitudinal Direction

1 A2-1

Wd
kN

kN

1289.04193

317.0

Total Vert.
kN
1606.0

Hx

Mz

kN

kN-m

150.0

1941.9

VIETNAM OIL AND GAS CORPORATION ( PETROVIETNAM )


DUNG QUAT REFINERY (DQR) PROJECT
2 A3-1

1160.13774

285.3

1445.4

149.1

2588.4

3
4
5
6
7

B-1
B-7
C1-1
C2-1
C3-1

1289.04193
1289.04193
1289.04193
1289.04193
1289.04193

1601.0
1601.0
1281.0
1281.0
1281.0

2890.0
2890.0
2570.0
2570.0
2570.0

0.0
90.0
0.0
150.0
149.1

-1555.5
-203.7
-1090.0
1163.0
1778.4

8 C3-9

1160.13774

1152.9

2313.0

149.1

1887.4

Hz
kN

Mx
kN-m

8.2.2

Transverse Direction
Wd
kN

V
kN

A2-3
A3-3
B-1
B-9
C1-1

1289.04193
1160.13774
1289.04193
1289.04193
1289.04193

317.0
285.3
1601.0
1601.0
1281.0

1606.0
1445.4
2890.0
2890.0
2570.0

150.0
149.1
0.0
90.0
0.0

2253.0
2868.4
0.0
1351.8
0.0

6 C2-5
7 C3-5
8 C3-13

1289.04193
1289.04193
1160.13774

1281.0
1281.0
1152.9

2570.0
2570.0
2313.0

150.0
149.1
149.1

2253.0
2868.4
2868.4

1
2
3
4
5

8.3

Total Vert.
kN

Lateral load capacity


H / n (n = no of piles)

A2-1
A3-1

Longitudinal
37.5
37.3

B-1
B-7
C1-1
C2-1
C3-1

0.0
22.5
0.0
37.5
37.3

C3-9
A2-3
A3-3
B-1
B-9
C1-1

37.3

C2-5
C3-5
C3-13
8.4

Transverse

Shear Capacity of
Pile (kN)
280
280

OK !
OK !

210
280
210
280
280

OK
OK
OK
OK
OK

!
!
!
!
!

37.5
37.3
0.0
22.5
0.0

280
280
280
210
280
210

OK
OK
OK
OK
OK
OK

!
!
!
!
!
!

37.5
37.3
37.3

280
280
280

OK !
OK !
OK !

Compression Capacity Check


Max Load on Pile Rp = N/n + Mo/Zp (kN)
Longitudinal

Transverse

Pile Capacity in
Compression (kN)

A2-1
A3-1

605.92
633.83

2267
2267

OK !
OK !

B-1
B-7
C1-1
C2-1
C3-1

558.78
701.07
527.78
764.93
829.71

1700
2267
1700
2267
2267

OK
OK
OK
OK
OK

!
!
!
!
!

C3-9
A2-3
A3-3
B-1
B-9
C1-1

776.94
852.1
935.0
722.5
992.9
642.5

2267
2267
2267
1700
2267
1700

OK
OK
OK
OK
OK
OK

!
!
!
!
!
!

1093.1
1216.2
1151.9

2267
2267
2267

OK !
OK !
OK !

C2-5
C3-5
C3-13

VIETNAM OIL AND GAS CORPORATION ( PETROVIETNAM )


DUNG QUAT REFINERY (DQR) PROJECT

8.5

Check Tension Force on Each Pile


Min Load on Pile Rp = N/n - Mo/Zp (kN)
Longitudinal

Pile Capacity in
Tension (kN)

Transverse

A2-1
A3-1
B-1
B-7
C1-1
C2-1

197.10
88.89
886.24
743.95
757.24
520.09

-670
-670
-670
-670
-670
-670

OK
OK
OK
OK
OK
OK

!
!
!
!
!
!

C3-1
C3-9
A2-3
A3-3
B-1

455.31
379.58
-49.1
-212.3
722.5

-670
-670
-670
-670
-670

OK
OK
OK
OK
OK

!
!
!
!
!

452.2
642.5
191.9
68.8
4.6

-670
-670
-670
-670
-670

OK
OK
OK
OK
OK

!
!
!
!
!

B-9
C1-1
C2-5
C3-5
C3-13
9.

DESIGN OF REINFORCEMENT

9.1

Factored Loading Combinations


A2-1

Erection with Wind

A3-1
B1-1
B1-7
C1-1
C2-1

Erection with Earthquake


Test without Wind
Test with Wind
Operating without Wind
Operating with Wind

C2-9
C3-1
C3-9
A2-3
A3-3
B1-1

Operating with Wind


Operating with Earthquake
Operating with Earthquake
Erection with Wind
Erection with Earthquake
Test without Wind

B1-9
C1-1
C2-5
C2-13
C3-5

Test with Wind


Operating without Wind
Operating with Wind
Operating with Wind
Operating with Earthquake

C3-13

Operating with Earthquake

9.2

Factored Load at Bottom of Footing

9.2.1

Longitudinal Direction
Wd
kN

V
kN

1 A2-1

1224.58983

301.2

2
3
4
5
6
7

A3-1
B1-1
B1-7
C1-1
C2-1
C2-9

1044.12396
1624.19283
1624.19283
1624.19283
1624.19283
1224.58983

256.8
2453.8
1683.4
1941.8
1363.4
1168.8

8 C3-1
9 C3-9

1804.6587
1044.12396

1542.8
989.4

Hx
kN

Mz
kN-m

1525.7

240.0

3309.3

1300.9
4078.0
3307.6
3566.0
2987.6
2393.3

210.0
0.0
144.0
0.0
240.0
240.0

3788.0
-2383.0
526.5
-1638.2
2433.9
2608.3

3347.4
2033.5

210.0
210.0

2716.5
3196.1

Total Vert.
kN

VIETNAM OIL AND GAS CORPORATION ( PETROVIETNAM )


DUNG QUAT REFINERY (DQR) PROJECT
9.2.2

9.3

Transverse Direction
Wd
kN

V
kN

Hz
kN

Mx
kN-m

1 A2-3
2 A3-3

1224.58983
1044.12396

301.2
256.8

1525.7
1300.9

240.0
210.0

3604.8
4040.0

3
4
5
6
7
8

B1-1
B1-9
C1-1
C2-5
C2-13
C3-5

1624.19283
1624.19283
1624.19283
1624.19283
1224.58983
1804.6587

2453.8
1683.4
1941.8
1363.4
1168.8
1542.8

4078.0
3307.6
3566.0
2987.6
2393.3
3347.4

0.0
144.0
0.0
240.0
240.0
210.0

0.0
2162.9
0.0
3604.8
3604.8
4040.0

9 C3-13

1044.12396

989.4

2033.5

210.0

4040.0

Total Vert.
kN

Pile Reaction Due to Factored Load


Max Rp = N/n + Mo/Zp
Min Rp = N/n - Mo/Zp

9.3.1

Longitudinal Direction

A2-1
A3-1
B1-1
B1-7
C1-1
C2-1
C2-9
C3-1
C3-9
9.3.2

9.4
9.4.1

Max Rp
kN
729.8
724.0

Min Rp
kN
33.1
-73.5

768.7
882.3
719.1
1003.1
872.9

1270.3
771.5
1063.9
490.7
323.8

A3-1
B1-1
B1-7
C1-1
C2-1
C2-9

1122.8
844.8

550.9
172.0

C3-1
C3-9

A2-1

Transverse Direction
Max Rp

Min Rp

A2-3
A3-3
B1-1
B1-9
C1-1

kN
1027.1
1069.0
406.0
838.6
406.0

kN
-339.5
-482.8
1019.5
394.3
891.5

A2-3
A3-3
B1-1
B1-9
C1-1

C2-5
C2-13
C3-5
C3-13

1127.0
1027.1
1259.2
1069.0

25.9
-122.6
28.9
-299.6

C2-5
C2-13
C3-5
C3-13

Bending Moment for Rebar Design


Longitudinal Direction

A2-1
A3-1

Rd
kN/m
182.1
155.3

Mf
kN-m
1097.3
1601.7

Max Mp
kN-m
1733.2
1719.4

Min Mp
kN-m
78.6
-174.6

Max Mu
kN-m
2830.5
3321.1

Min Mu
kN-m
1175.9
1427.1

B1-1
B1-7
C1-1
C2-1
C2-9

241.5
241.5
241.5
241.5
182.1

-5761.2
-2740.4
-4866.9
-955.2
-171.9

1825.6
2095.5
1707.8
2382.4
2073.1

3017.1
1832.3
2526.9
1165.4
769.0

-3935.6
-644.8
-3159.1
1427.2
1901.2

-2744.1
-908.1
-2340.0
210.2
597.1

C3-1

268.4

-1228.3

2666.7

1308.4

1438.4

80.1

C3-9

155.3

530.0

2006.4

408.4

2536.4

938.4

Max. for Top Reinforcement=


Max. for Bottom Reinforcement =
9.4.2

Transverse Direction

3321.1
-3935.6

VIETNAM OIL AND GAS CORPORATION ( PETROVIETNAM )


DUNG QUAT REFINERY (DQR) PROJECT
Rd

Mf

Max Mp

Min Mp

Max Mu

Min Mu

A2-3
A3-3
B1-1
B1-9

kN/m
273.2
232.9
362.3
362.3

kN-m
267.7
228.3
355.1
355.1

kN-m
410.8
427.6
162.4
335.4

kN-m
-135.8
-193.1
407.8
157.7

kN-m
143.1
199.4
-192.6
-19.6

kN-m
-403.5
-421.4
52.7
-197.3

C1-1

362.3

355.1

162.4

356.6

-192.6

1.5

C2-5
C2-13

362.3
273.2

355.1
267.7

450.8
410.8

10.4
-49.1

95.7
143.1

-344.7
-316.8

C3-5
C3-13

402.6
232.9

394.5
228.3

503.7
427.6

11.5
-119.8

109.1
199.4

-383.0
-348.1

Max. for Top Reinforcement=


Max. for Bottom Reinforcement =

10.

FOOTING SLAB DESIGN

10.1

Clearance of Footing Re-bar


Clearance for the re-bar of footing bottom (cfb)
Clearance for the re-bar of footing top (cft)
Clearance for the re-bar of footing side

10.2

Minimum and Maximum Ratio of Reinforcement


a = fc' / 4 fy
b = 1.4 / fy
min = Max (a, b )
t & s = for temperature & shrinkage reinforcement
used with gross area of footing
max = 0.75 x 0.85 1 fc'/fy 600 / (600+ fy)
Max. Bar Spacing =

10.3
10.3.1

10.3.2

199.4
-421.4

0.100 m
0.100 m
0.100 m

0.0030
0.0033
0.0033
0.0018
0.0190
250.0000 mm

Longitudinal Direction
Design of Bottom-bar
Max Mu (bottom)
Effective Depth of Footing (d)
b
Bottom-bar size (db)
Sectional area
Rn =
Mu / ( b d)
Required p =
0.85 fc' / fy (1 - (1 - 2 Rn / 0.85 fc'))
Calculated As
Min As
Max As

3935.6
0.688
4.500
25
491
2.056
0.0052
15958
10313
58698

number of re-bar
Bottom-bar pitch (S)
Total area of Bottom-bar (As)

36
125 mm
16199 mm

Design of Top-bar
Max Mu(top)
Effective depth of Footing (d)
b
Top-bar
Sectional area
Rn =
Mu / ( b d)
Required p =
0.85 fc' / fy (1 - (1 - 2 Rn / 0.85 fc'))
Calculated As
Min As
Max As

3321.1
0.688
4.500
25
491
1.735
0.0043
13349
10313
58698

number of re-bar
Top-bar pitch
Total area of Top-bar (As)

30
150 mm
13744 mm

OK !

6480 mm

OK !

Min As (by shrinkage and temperature reinforcement)

kN-m
m
m
mm
mm
N/mm
mm
mm
mm
cal. No
33
OK !

kN-m
m
m
mm
mm
N/mm
mm
mm
mm
cal. No
28

VIETNAM OIL AND GAS CORPORATION ( PETROVIETNAM )


DUNG QUAT REFINERY (DQR) PROJECT
10.4
10.4.1

10.4.2

Transverse Direction
Design of Bottom-bar
Max Mu (bottom)
Effective Depth of Footing (d)
b
Bottom-bar size (db)
Sectional area
Rn =
Mu / ( b d)
Required p =
0.85 fc' / fy (1 - (1 - 2 Rn / 0.85 fc'))
Calculated As
Min As
Max As

421.4
0.688
6.750
25
491
0.147
0.0004
1627
15469
88048

number of re-bar
Bottom-bar pitch (S)
Total area of Bottom-bar (As)

34
200 mm
15708 mm

Design of Top-bar
Max Mu(top)
Effective depth of Footing (d)
b
Top-bar
Sectional area
Rn =
Mu / ( b d)
Required p =
0.85 fc' / fy (1 - (1 - 2 Rn / 0.85 fc'))
Calculated As
Min As
Max As

199.4
0.688
6.750
25
491
0.069
0.0002
768
15469
88048

number of re-bar
Top-bar pitch
Total area of Top-bar (As)

34
200 mm
15708 mm

OK !

9720 mm

OK !

Min As (by shrinkage and temperature reinforcement)


10.5

kN-m
m
m
mm
mm
N/mm
mm
mm
mm
cal. No
32
OK !

kN-m
m
m
mm
mm
N/mm
mm
mm
mm
cal. No
32

Rebar Arrangement for Footing Slab


Longitudinal Direction
Bottom Rebar
Top Rebar

36 bars
30 bars

T 25
T 25

@ 125
@ 150

mm
mm

Transverse Direction
Bottom Rebar

34 bars

T 25

@ 200

mm

Top Rebar

34 bars

T 25

@ 200

mm

10.6

Check for Shear Strength

10.6.1

Punching Shear (Two-way action)


Around Padestal Perimeter

(Column/Pedestal location coefficient)


(Ratio of long side to short side of Column/Pedestal)
PEDESTAL # 1

Vu
bo
Vn1 = (1+2/)fc' b0d /6

10.6.2

30
1.0
PEDESTAL # 2

663.179 KN
6.902 m

2220.51 KN
10.082 m

11863 kN

17329 kN

Vn2 = (sd/bo+2)fc' b0d /12

9863 kN

11685 kN

Vn3 = fc' b0d /3

7909 kN

11553 kN

Vc = min(Vn1, Vn2, Vn3)

7909 kN

11553 kN

Vc

5932 kN

8665 kN

Around Pile Perimeter


Vu
Vu

Vertical Load due to Pile Reaction


Pile Reaction Force - Soil weight and Footing selfweight over the pile
1155.5 kN

OK !

VIETNAM OIL AND GAS CORPORATION ( PETROVIETNAM )


DUNG QUAT REFINERY (DQR) PROJECT

bo

(Column/Pedestal location coefficient)


(Ratio of long side to short side of Column/Pedestal)

Vc = fc' bod /3
Vc
10.6.3

5355 kN
4016 kN

OK !

1897.3 kN
3867 kN
2900 kN

OK !

Wide Beam Shear (One-way action)


Longitudinal Direction
Vu
Vc = fc Wx d / 6
Vc

11

PADESTAL DESIGN

11.1

Clearance of Pedestal Re-bar


Clearance of rebar from padestal bottom
Clearance of rebar from padestal top
Clearance of rebar from padestal side

11.2

40
4.673 m
1.0

0.05 m
0.05 m
0.05 m

Design of Rebar

PADESTAL # 1
Rebar Size
Sectional Area
Nu
Mu
r = h/H
Nu / Ag
Mu / Ag . H
p
Act
Rebar nos
As on both sides

20 mm
314 mm
131.1 KN
1120.0 KN-m

PADESTAL # 2
25 mm
491 mm
402.0 KN
3280 KN-m
0.96
0.06
0.18
0.003

0.93
0.05
0.28
0.004
5630.4 mm

6955.2 mm

18
10053 mm

15
12763 mm

0.005
11965 mm

0.005
32458 mm

8
48 mm
14476 mm

16
56 mm
39408 mm

8617 mm

23457 mm

11965 mm
40
12566 mm

32458 mm
68
33379 mm

Minimum Reinforcement Ratio


Minimum p required
Required As
Reinforcement for Tension
Number of Anchor bolts
Anchor bolts size
Total area of anchor bolts (Ab)
Required As = fy(bolt)/fy * Ab
Governing As
Rebar nos provided
As provided
11.3

Check for Shear Strength


Vu
Ag
d

Vc = 0.75 x ( 1 + Nu/14Ag ) fc' Px dz/6

663.2 KN
2.39 m
1625 mm
1733 kN

2220.51 KN
6.49 m
2720 mm
4781 kN

OK !

VIETNAM OIL AND GAS CORPORATION ( PETROVIETNAM )


DUNG QUAT REFINERY (DQR) PROJECT
Vc = 0.75 x fc'^0.5 * Px dz / 6

1727 kN

Rebar Size
Rebar pitch
Sectional Area
Rebar nos

11.4

4760 kN

10 mm
150 mm
79 mm
11

10 mm
150 mm
79 mm
12

Rebar Arrangement for Padestal


Padestal # 1:
Main Bar
Link-x

40 bars
11 bars

T 20
T 10

@ 150

mm

68 bars
12 bars

T 25
T 10

@ 150

mm

Padestal # 2:
Main Bar
Link-x

OK !