Initial filling pump-1


Initial filling pump-2
BFP-1
BFP-2
BFP-3
HP dosing pump-1,2&3
HP dosing tank and its straier-1&2
LP dosing pump-1&2
HP dosing tank and its straier-1&2
Unit # 1 ID Fan
Unit # 2 ID Fan
Unit # 1 FD Fan
Unit # 2 FD Fan
Unit # 1 SA Fan
Unit # 2 SA Fan
Unit # 1 ESP Collecting Plate Raping System - 1,2&3
Unit # 1 ESP Emitting Plate Raping System - 1,2&3
Unit # 2 ESP Collecting Plate Raping system - 1,2&3
Unit # 2 ESP Emitting Plate Raping System -1,2&3
Unit # 1 ESP ash conveying system-1,2&3
Unit # 2 ESP ash conveying system-1,2&3
Ash Condisenear
Ash Bulk Loader and Purging Air Compressor
Lime Stone Hopper RAV-1
Lime Stone Hopper RAV-2
Air Compressor-1,2&3
Air Dryer-1&2
Unit # 1 Rotory Bad Ash cooler
Unit # 2 Rotory Bad Ash cooler
Bed Ash belt conveyor
Bed ash elevator

9 10 11 12 13

Boiler, Turbine, CHP, AHP and

32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

Bed ash hopper RAV


Unit # 1 Coal feeder-1,2&3
Unit # 2 Coal feeder-1,2&3
Unit # 1 Bed material Elevator
Unit # 1 Bed material Screw Feeder
Unit # 2 Bed material Elevator
Unit # 2 Bed material Screw Feeder
Unit # 1 Oil Burner-1&2
Unit # 2 Oil Burner-1&2
Unit # 1 Rotory Soot blower-D1,D2,D3&D4
Unit # 1 LRSB-L1,L2,L3,L4,L5&L6
Unit # 2 Rotory Soot blower-D1,D2,D3&D4
Unit # 2 LRSB-L1,L2,L3,L4,L5&L6
Coal Feeding Vibro Feeder
BC-1
Coal Crusher
Coal Screen
BC-2
BC-3
Ferrow Type Damper-1,2&3
Dust Extraction System-1&2
Unit # 1 CEP pump-1&2
Unit # 2 CEP pump-1&2
Unit # 1 Water Condensor
Unit # 1 Condensor Cleaning System
Unit # 2 Water Condensor
Unit # 2 Condensor Cleaning System
Oil centrifuse
Unit # 1 Oil cooler-1&2
Unit # 2 Oil cooler-1&2
Unit # 1 Service Oil Pump
Unit # 1 Auxillary Oil Pump
Unit # 1 Emergency Oil Pump (DC pump)
Unit # 1 Lube Oil Filter-1&2
Unit # 1 Control Oil filter-1&2
Unit # 2 Service Oil Pump
Unit # 2 Auxillary Oil Pump

69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104

Unit # 2 Emergency Oil Pump (DC pump)


Unit # 2 Lube Oil Filter-1&2
Unit # 2 Control Oil filter-1&2
Unit # 1 Ejector Water Jet Pump-1&2
Unit # 2 Ejector Water Jet Pump-1&2
Unit # 1 GVC blower-1&2 and gland steam condensor
Unit # 2 GVC blower-1&2 and gland steam condensor
Main Cooling tower fan-1,2,3&4
Main cooling Water Pump-1,2&3
Main cooling Water Pump-4&5
MCW Pump Auto-stainer-1,2,3,4&5
Auxillary Cooling Tower Fan-1&2
Auxillary Cooling Water pump-1&2
Auxillary Cooling Tower Make-up Pump-1&2
Fire Frightining Hydrant Pump
Fire Frightining Diesel Hydrant Pump
Fire Frightining Jockey Pump
Fire Frightining Sprinkler Pump-1&2
Row Water Intake Pump-1,2&3
Row Water Dosing Pump-1,2,3&4
Clearifier Tank Air blower
Row Water Transfer Pump-1,2&3
Main cooling Tower Make-up Pump-1&2
Row Water Feed Pump (MMF)-1&2
MMF Back Wash Pump-1
UFO Back Wash Pump-1
RO Feed Pump-1&2
High Pressure Pump (Sea Water)-1&2
High Pressure Pump (Back Riskh Water)
SW Rinse Water Pump-1
DM plant dosing pumps
DM Transfer Pump-1&2
RO Cleaning Pump
RO & DM Plant Compressor
Pure Water Pump-1&2
Regeneration Pump-1

105 Steam Header Unit # 1 Inlet & Outlet MOV


106 Steam Header Unit # 2 Inlet & Outlet MOV
107 Steam Header Unit # 1 & Unit # 2 Interconnection MOVs
108 Unit # 1 IBD & CBD MOVs
109 Unit # 2 IBD & CBD MOVs
110 Unit # 1 Feed Water Control and Bypass Valve
111 Unit # 2 Feed Water Control and Bypass Valve
112 Unit # 1 Attemprator MOV-1,2&3
113 Unit # 1 Attemprator Bypass and Isolation Valves
114 Unit # 2 Attemprator MOV-1,2&3
115 Unit # 2 Attemprator Bypass and Isolation Valves
116 Unit # 1 Drum-Economiser Circulation Valve
117 Unit # 2 Drum-Economiser Circulation Valve
118 Unit # 1 Main Steam Stop Valve
119 Unit # 2 Main Steam Stop Valve
120 Unit # 1 Start-up Vent Valve
121 Unit # 2 Start-up Vent Valve
122 Unit # 1 Steam Line Safety Valve
123 Unit # 2 Steam Line Safety Valve
124 Unit # 1 Drum Safety Valve-1&2
125 Unit # 2 Drum Safety Valve-1&2
126 Steam Line Pagging PRDS Control Valve
127 Bleed Line PRDS Control Valve
128 Dereator Level Control Valve
129 Dereator Safety Valve
130 Unit # 1 Turbine Steam Stop Valve
131 Unit # 2 Turbine Steam Stop Valve
132 Unit # 1 HP Heater All Valves
133 Unit # 2 HP Heater all Valves

134 Unit # 1 LP Heater all Valves


135 Unit # 2 LP Heater all Valves
136 Unit # 1 Ejector-1&2
137 Unit # 2 Ejector-1&2
138 Unit # 1 Shoot blower line main isolation valve &
bypass valve
139 Unit # 1 Shoot blower Drain Valve
140 Unit # 2 Shoot blower line main isolation valve &
bypass valve
141 Unit # 2 Shoot blower Drain Valve
142 EOT crane

Note: 1. Physically Inspection shall be done by Respective incharge on daily basis.


2. DO Work with Proper isolation and with work Permit.

Dept. HOD

ICAL DEPEARTMENT

INTENANCE SCHEDULE
14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Technician

HP and DM plant Equipments

Remark

Bandan, Sultan

Plant Manager

You might also like