Geometric Volume of 1 Fermenter
Geometric Volume of 1 Fermenter
V= 2
480=
Dt3
3
2 Dt
Dt3 = 305.73
Dt = 6.73 7 m
Ht = 27=14 m
Dt 1
Diameter of Impeller ( Di = 3 = 3 =2.33 m=Di
I=
Dt 7
= =0.58 m 0.6
12 12
K=
Dt 7
= =0.14 m=K
50 50
80
(WL)=479.394 KL
100
Dw=
Di 2.33
=
=0.466 m 0.5 m
5
5
D b=
Di 2.33
=
=0.562 m 0.6 m=D b
4
4
Dd =
67
D=1.56 m=Dd
100
E=
Dt
=2.33m= E
3
4
D s= Di =1.864=2 m=D s
5
Ls =
19
D i =1.77 m=Ls
25
GL=
V=
2
26.633+ 26.633=31.95 32
100
3
2 Dt
Dt3 = 20.371
Dt = 2.731m 3 m
Ht = 6 m
Di = 1 m
I = 0.25 m
K = 0.06 m
Dw = 0.2 m
Db = 0.25 m
Dd = 0.67 m
10
266.33=26.633
100
E= 1 m
Ds = 0.8 m
Ls = 0.76 m
95% of x = 3T
95
x=3000
100
x=
3000100
=3157.894 Kg
95
1g
3157.894 Kg
30.4103 g
3
103.8710 Kg . COW
1.3 g biomass 1 L
3
103.8710 Kg
1L
3
103.87 10 Kg
3
1.310 mg
= 7990000 L
= 7990 KL broth/ month
Total cycle time =
Number of fermenters=
30
=2.5batches /month
12
7990 KL
=3196 KL /batch
2.5
t p +t d +t f 1+10+1
=
=12 fermenter
td
1
WorkingVolume of 1 fermenter =
3196
=266.33 KL
12
20
266.4
100
= 319.6 KL 320 KL
Number of storage tank = 2
Rotary Vacuum Filter = 20 KL/hr.
2 Vacuum Filter in parallel operation
40 KL/hr.
Time=
320
=8 hrs .
40
Extraction
600266.4
3
10
2
= 79.920 KL
80 KL
Total=266.4+ 80=346.4 KL
Number of Extractor = 1
Working Volume of Extractor = 346.4 347 KL
Extractor=347+
20
347=416.4 420 KL
100
Drying
Volume of Spray Drier = 20 KL/hr.
Number of Driers = 2
40 KL/hr.
80 KL
=2 hr .
KL
40
hr
g
266.495
l
0.395
=99.96 Kg
100
Dd =
67
67
D i=
1.18=0.7906 m=D d
100
100
5.6
=4 impellers
1.18
4
4
D s= Di = 1.18=0.944 m=D s
5
5
Ls =
19
19
Di = 1.18=0.8968 m=Ls
25
25
Number of fermenters=
Cost of 1
fermenter
2
2
=
=4
10.5 0.5
= KfVa
=12,025(70)0.5
= $ 10060.36
= .
60,36,502
Total cost of
fermenters
=
60,36,502*4
=Rs.
2,41,46,008
99.962
99.96
100
= 101.95 Kg
Lactonization
5
Amount of Benzene required= 101.95=127.43 L
4
Amount of TFA required = 2.54 L
Volume of Drying=101.95+127.43+2.54
= 231.9 L
232 L
Total Time
RUF
Extraction
Spray
Dryer
Lactonizat
ion
Spray
Dryer
Total
= 8 hr.
= 1 hr.
= 2 hr.
= 2 hr.
= 1 hr.
= 14
hr.
Dimensions of Extractor
Size = 420 KL = 420 m3
Height of Tank (Ht ) : Diameter of Tank (Dt ) = 2:1
Dt = 6.5 m
Ht = 13 m
Di 1
=
Dt 3
D i=
6.5
=2.166 m=Di
3
J
1
=
Dt 12
J=
6.5
=0.541 m=J
12
K 1
=
Dt 50
K=
6.5
=0.13 m=K
50
Dw 1
=
Di 5
Dw=
2.166
=0.43 m=D w
5
Db 1
=
Di 4
D b=
2.166
=0.54 m=D b
4
D d 67
=
Di 100
Dd =
67
2.166=1.45 m=Dd
100
E 1
=
Dt 3
E=
6.5
=2.166 m=E
3
Ht = 13 m
80% of Ht = 10.4
Number of impellers=
10.4
=4 impellers
2.166