You are on page 1of 54

4.

Providing and laying in position cement concrete of specified grade excluding the cost of
centering and shuttering - All work up to plinth level :

4.1.8

1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size).
For Footing foundation

F11
F12
F13
F14
F15
F16
F17
F18
F19

9
7
13
2
4
2
2
2
2
1
12
15
2
4
2
2
4
2
7

Total

94

F1
F2
F3
F4
F5
F6
F7
F8
F9
F10

2.450
1.950
2.150
2.350
2.550
1.800
2.050
1.600
2.650
2.500
2.150
1.700
2.050
2.200
1.950
1.550
2.000
2.800
1.400

2.90
2.40
2.60
2.35
2.55
2.25
2.50
1.85
3.10
2.50
2.60
1.70
2.05
2.45
2.20
1.70
3.05
2.80
1.40

0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100

4.3

Centering and shuttering including strutting, proppingetc. and removal of form work for :

4.3.1

Foundations, footings, bases for columns.


For Footing foundations
Acadamic Block
F1 (No's X
2(L+B) X D
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F13
F14
F15
F16
F17
F18
F19

9
7
13
2
4
2
2
2
2
1
12
15
2
4
2
2
4
2
7

Total

94

2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2
2

2.450
1.950
2.150
2.350
2.550
1.800
2.050
1.600
2.650
2.500
2.150
1.700
2.050
2.200
1.950
1.550
2.000
2.800
1.400

2.90
2.40
2.60
2.35
2.55
2.25
2.50
1.85
3.10
2.50
2.60
1.70
2.05
2.45
2.20
1.70
3.05
2.80
1.40

0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100
0.100

2.27

Supplying & Filling in Plinth with Jamuna River sand under floors including watering,raming
consolidating and dressing complete
Class Room
-4 D1D2,G5-G6
E1-E6 PB13
F1-F5 PB13
Class Room
-3 J1J5,K1-K5
J1-J5 PB13
K1-K5 PB13

1
-1
-1

1
1
1

7.760
7.760
7.760

10.640
0.230
0.230

0.10
0.10
0.10

1
-1
-1

1
1
1

7.760
7.760
7.760

10.640
0.230
0.230

0.10
0.10
0.10

1
-1
-1

1
1
1

10.640
7.760
7.760

7.760
0.230
0.230

0.10
0.10
0.10

1
-1
-1
1

1
1
1
1

10.640
7.760
7.760
28.350

7.760
0.230
0.230
2.490

-1
-1
-1
-1
1
1
1
-1
-1
1
-1
-1
-1
1
-1
1
-1
1
1
1
1
-1

7
2
1
1
1
1
1
1
1
1
6
4
1
1
1
1
1
1
1
1
1
2

2.34
2.34
2.34
2.34
2.755
3.60
3.37
8.74
2.70
28.26
2.34
2.34
2.34
4.26
2.40
4.26
2.40
3.44
3.44
5.115
7.80
7.80

0.23
0.23
0.23
0.23
3.6
5.4
6.07
0.23
0.23
2.49
0.23
0.23
0.34
2.4
0.34
2.4
0.34
3.765
3.765
3.44
7.8
0.23

0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10
0.10

Class Room
-1 T9T12,P12-P9
T10-P10 PB1
P11-T11 PB1
Class Room
-2 P13P16,T16T13
T14-P14 PB1
T15-P15 PB1
Passage D5PB14
PB16
PB11
PB11
Passage at L
Passage at M
Passage M6-M
PB11 at N
PB11 tt M
N7-N16 to P1
PB14
PB16
PB2
T12-T13 to P
PB8 at P12/1
G3-G5,H5-H3
Beam at G5,H
Assistant Pr
Assosiate Pr
Professor Ro
ENT.Lobby N
PB12

Total
4.1

4.1.10

Providing and laying in position cement concrete of specified grade excluding th


centering and shuttering - All work up to plinth level :

1:5:10 (1 cement : 2 coarse sand : 10 graded stone aggregate 40 mm nomina


Class Room -4
D1-D2,G5-G6
E1-E6 PB13
F1-F5 PB13
Class Room -3
J1-J5,K1-K5
J1-J5 PB13
K1-K5 PB13
Class Room -1
T9-T12,P12-P9
T10-P10 PB13
P11-T11 PB13
Class Room -2
P13-P16,T16-T13
T14-P14 PB13
T15-P15 PB13
Passage D5-D6-M6PB14
PB16
PB11
PB11
Passage at L4-M5 t
Passage at M4-M6 t
Passage M6-M7 to
PB11 at N
PB11 tt M
N7-N16 to P16-P7
PB14
PB16
PB2
T12-T13 to P13-P12
PB8 at P12/13
G3-G5,H5-H3
Beam at G5,H5 PB8
Assistant Professor
Assosiate Professo
Professor Room M1
ENT.Lobby N2-N6,T
PB12

1
-1
-1

1
1
1

7.760
7.760
7.760

10.640
0.230
0.230

1
-1
-1

1
1
1

7.760
7.760
7.760

10.640
0.230
0.230

1
-1
-1

1
1
1

10.640
7.760
7.760

7.760
0.230
0.230

1
-1
-1
1

1
1
1
1

10.640
7.760
7.760
28.350

7.760
0.230
0.230
2.490

-1
-1
-1
-1
1
1
1
-1
-1
1
-1
-1
-1
1
-1
1
-1
1
1
1
1
-1

7
2
1
1
1
1
1
1
1
1
6
4
1
1
1
1
1
1
1
1
1
2

2.34
2.34
2.34
2.34
2.755
3.60
3.37
8.74
2.70
28.26
2.34
2.34
2.34
4.26
2.40
4.26
2.40
3.44
3.44
5.115
7.80
7.80

0.23
0.23
0.23
0.23
3.6
5.4
6.07
0.23
0.23
2.49
0.23
0.23
0.34
2.4
0.34
2.4
0.34
3.765
3.765
3.44
7.8
0.23

11.38

Providing and laying Ceramic glazed floor tiles 300x300 mm (thickness to be specifie
manufacturer) of 1st quality conforming to IS : 15622 of approved make in all colours
execpt White, Ivory, Grey, Fume Red Brown, laid on 20 mm thick Cement Mortar 1:4
: 4 Coarse sand) including pointing the joints with white cement and matching
etc., complete.
He Toilet
Deduct Walls
Physically Challenge
Deduct Duct
She Toilet
Deduct Walls
Physically Challenge
Deduct Duct

1
-4
1
-1
1
-4
1
-1

Asst Proffesor Toilet


Associate Proffesor
Proffesor Toilet

1
1
1

First Floor
He Toilet
WC
Jani.
Physically Challenge
Deduct Duct
She Toilet
WC
Jani.
Physically Challenge
Deduct Duct
Asst Proffesor Toilet
Asst Proffesor Toilet

Acdamic Block-D3
0.5
1
1
1
0.5
1
1
1

9.000
2.250
2.144
2.000
9.000
2.250
2.144
2.000

9.000
0.115
2.000
2.400
9.000
0.115
2.000
2.400

1
1
1

1.535
1.535
1.535

2.470
2.415
2.415

1
-3
-1
1
-1

0.5
1
1
1
1

9.823
1.500
1.500
2.144
2.888

9.412
1.200
1.000
2.000
2.418

1
-3
-1
1
-1
1
1

0.5
1
1
1
1
1
1

9.823
1.500
1.500
2.144
2.888
1.535
1.535

9.412
1.200
1.090
2.000
2.418
2.415
2.415

11.36

Providing and fixing 1st quality ceramic glazed wall tiles conforming to IS : 15622 (thic
specified by the manufacturer) of approved make in all colours, shades except burgu
green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps
over 12 mm thick bed of cement Mortar 1:3 (1 cement : 3 coarse sand) and jointing
cement slurry @ 3.3kg per sqm including pointing in white cement mixed with pi
matching shade complete.

Ground Floor
He Toilet
Front walls of toilets
Steel door Jams
Jani
Jams
WC
Jams
Deduct D3
Steel door

1
1
1
1
1
1
1
-2
-1

1
1
1
1
1
3
3
4
1

17.800
8.935
5.070
4.640
4.950
5.280
4.950
0.750
0.870

She Toilet
Front walls of toilets
Steel door Jams
Jani
Jams
WC
Jams
Deduct D3
Steel door

1
1
1
1
1
1
1
-2
-1

1
1
1
1
1
3
3
4
1

17.800
8.935
5.070
4.640
4.950
5.280
4.950
0.750
0.870

Asst Proffesor Toilet


Door D3
Associate Proffesor
Door D3

1
-1
1
-1

1
1
1
1

1.535
0.750
1.535
0.750

2.470
2.415

Proffesor Toilet

1.535

2.415

First Floor
He Toilet
Front walls of toilets
Steel door Jams

1
1
1

1
1
1

17.800
8.935
5.070

Jani
Jams
WC
Jams
Deduct D3
Steel door
She Toilet
Front walls of toilets
Steel door Jams
Jani
Jams
WC
Jams
Deduct D3
Steel door

1
1
1
1
-2
-1
1
1
1
1
1
1
1
-2
-1

1
1
3
3
4
1
1
1
1
1
1
3
3
4
1

4.640
4.950
5.280
4.950
0.750
0.870
17.800
8.935
5.070
4.640
4.950
5.280
4.950
0.750
0.870

Asst Proffesor Toilet


Door D3

1
-1

1
1

1.535
0.750

2.415

Asst Proffesor Toilet


Door D3
SV2
GF PC Toilets
FF PC Toilets

1
-1
-1
2
2

1
1
13
1
1

1.535
0.750
1.2
6.91
6.91

2.415

5.33

Providing and laying in position machine batched, machin


and machine vibrated design mix cement concrete of s
grade for reinforced cement concrete work including pum
concrete to site of laying but excluding the cost of c

Nos.
Length
Breadth
Particulars
V = [L X B X d] + h / 3 [ A1 + A2 + ROUTE UNDER A1 A2 ]
F1
A1=2.15x2.60=5.59
A2=0.45x0.90=0.40
5
(2.15*2.6*0.45)+
((0.3/3)*(5.59+0.40
5+
(SQRT(5.59*0.405)
)))=3.265

3.265

F2
A1=1.65x2.10=3.46
5
A2=0.45x0.90=0.40
5
(1.65*2.1*0.3)+
((0.3/3)*(3.465+0.4
05+
(SQRT(3.465*0.405
))))=1.545

1.545

F3
A1=1.85x2.30=4.25
5

13

2.055

A2=0.45x0.90=0.40
5
(1.85*2.3*0.38)+
((0.22/3)*(4.255+0.
405+
(SQRT(4.255*0.405
))))=2.055
F4
A1=2.05x2.05x.75=
3.152

3.152

F5
A1=2.25x2.25=5.06
2
A2=0.45x0.90=0.40
5
(2.25*2.25*0.3)+
((0.38/3)*(5.062+0.
405+
(SQRT(5.062*0.405
))))=2.393

2.393

F6
A1=1.50x1.95=2.92
5
A2=0.45x0.90=0.40
5
(1.5*1.95*0.3)+
((0.15/3)*(2.925+0.
405+
(SQRT(2.925*0.405
))))=1.098

1.098

F7
A1=1.75x2.20=3.85

1.867

0.678

A2=0.45x0.90=0.40
5
(1.75*2.2*0.38)+
((0.22/3)*(3.85+0.4
05+
(SQRT(3.85*0.405)
)))=1.867
F8
A1=1.30x1.55=2.01
5
A2=0.38x0.60=0.22
8

(1.3*1.55*0.23)+
((0.22/3)*(2.015+0.
228+
(SQRT(2.015*0.228
))))=0.678
F9
A1=2.35x2.80=6.58

4.254

2.380

2.172

2.172

15

0.670

1.132

A2=0.45x0.90=0.40
5
(2.35*2.8*0.45)+
((0.45/3)*(6.58+0.4
05+
(SQRT(6.58*0.405)
)))=4.254
F10
A1=2.2x2.20=4.84
A2=0.775x0.90=0.6
975
(2.2*2.2*0.38)+
F11
((0.22/3)*(4.84+0.6
A1=1.85x2.30=4.25
975+
5
(SQRT(4.84*0.6975
A2=0.45x0.90=0.40
))))=2.38
5
(1.85*2.3*0.3)+
((0.45/3)*(4.255+0.
405+
(SQRT(4.255*0.405
))))=2.172
F11
A1=1.85x2.30=4.25
5
A2=0.45x0.90=0.40
5
(1.85*2.3*0.3)+
((0.45/3)*(4.255+0.
405+
(SQRT(4.255*0.405
))))=2.172
F12
A1=1.40x1.40=1.96
A2=0.53*0.53=0.28
09
(1.4*1.4*0.23)+
((0.22/3)*(1.96+0.2
809+
(SQRT(1.96*0.2809
))))=0.670
F13
A1=1.75x1.75=3.06
A2=0.53*0.53=0.28
09

(1.75*1.75*0.3)+
((0.15/3)*(3.06+0.2
809+
(SQRT(3.06*0.2809
))))=1.132
F14
A1=1.90x2.15=4.08
5
A2=0.49x0.60=0.29
4
(1.9*2.15*0.38)+
((0.22/3)*(4.085+0.
294+
(SQRT(4.085*0.294
))))=1.954

1.954

F15
A1=1.65x1.90=3.13
5
A2=0.49x0.60=0.29
4
(1.65*1.9*0.3)+
((0.23/3)*(3.135+0.
294+
(SQRT(3.135*0.294
))))=1.277

1.277

2.134

F17
A1=1.70x2.75=4.67
5
A2=0.74x1.55=1.28
65
(1.7*2.75*0.3)+
((0.3/3)*(4.675+1.2
865+
(SQRT(4.675*1.286
5))))=2.244

2.244

F18
Cone
Footing

2.500

A2=0.49x0.60=0.29
4
(1.25*1.4*0.23)+
((0.22/3)*(1.75+0.2
94+
(SQRT(1.75*0.294)
)))=0.605
F17
A1=1.70x2.75=4.67
5
A2=0.49x1.55=0.75
95
(1.7*2.75*0.3)+
((0.3/3)*(4.675+0.7
595+
(SQRT(4.675*0.759
5))))=2.134

Column

2.50

F19
A1=1.10x1.10=1.21

0.374

A2=0.45x0.45=0.20
25
(1.1*1.1*0.23)+
((0.15/3)*(1.21+0.2
025+
(SQRT(1.21*0.2025
))))=0.374
94

5.9

Centering and shuttering including strutting, propping etc. and removal of

5.9.1

Foundations, footings, bases of columns, etc. For mass concret


Particulars
F1
F2
F3
F4
F5
F6
F7
F8
F9
F10
F11
F12
F13

no.

Total No.
9
7
13
2
4
2
2
2
2
1
12
15
2

2
2
2
2
2
2
2
2
2
2
2
2
2

B
2.15
1.65
1.85
2.05
2.25
1.50
1.75
1.30
2.35
2.20
1.85
1.40
1.75

2.60
2.10
2.30
2.05
2.25
1.95
2.20
1.55
2.80
2.20
2.30
1.40
1.75

F14
F15
F16
F17
F18
F19

4
2
2
4
2
7

2
2
2
2
2
2

1.90
1.65
1.25
1.70
2.50
1.10

2.15
1.90
1.40
2.75
2.50
1.10

94
TOTAL

22.7

22.7.1

Providing and laying integral cement based water proofing treatment includ
preparation
of surface
as mortar
required
for treatment
of roofs, balconies,
terraces
b)
Laying brick
bats with
using
broken bricks/brick
bats 25 mm
to 11
consisting
of
following
operations:
a)
Applying
a
slurry
coat
of
neat
cement
withAfter
50%two
of cement
(1 cement
with
wa
"c)
days of mortar
proper 1:5
curing
applying: 5
a coarse
secondsand)
coat admixed
of cement
slurr
kg/sqm.
cement
admixed
withtowater
proofing
compound
conforming
to IS
proofing of
compound
conforming
IS
: 2645
and
approved
by Engineer-in2.75kg/
sqm
of cement
admixed
with
water
proofing
compound
conformin
and
by Engineer-in-charge
theofRCC
including
adjoining
over
20
thick
layer
of cement over
mortar
mixslab
1:5 (1
cement
:5 with
coarse
2645approved
andmm
approved
by
Engineer-in-charge.d)
Finishing
the
surface
2w
300mm
height
including
cleaning
the
surface
before
treatment.
admixed
with
water
proofing
compound
conforming
to
IS
:
2645
and
approv
thick jointless cement mortar of mix 1:4 (1 cement :4 coarse sand) adm
Engineer-in-charge
to required
slopetoand
water
proofing compound
conforming
IS : treating
2645 andsimilarly
approvedthe
by adjoinin
Enginee
upto 300
mm height
including
rounding
junctions of
walls in
and
charge
including
laying
glass fibre
cloth of approved
quality
topslabs.
layer of p
and finally finishing the surface with trowel with neat cement slurry and ma
pattern of 300x300 mm square 3mm deep. e) The whole terrace so finishe
flooded with water for a minimum period of two weeks for curing and for fin
above operations to be done in order and as directed and specified by the E
in-Charge :

"With average thickness of 120mm and minimum thickness at khurra as 65


"

Area T9-N9- P16-N Sqmt

T9-T11-N9-N11
P11-P12-T11-T12
R12-R13-N12-N13
P11-P12-N11-N12
T13-T16-N13-N16
Total

7.04
8.26
6.55
3.9
10.64

11.07
3.9
2.50
2.45
11.10

1
1
1
1

2.45
7.84
14.67
11.07

1.49
1.69
14.67
3.25

1
1
1

11.07
6.25
11.07

10.64
2.86
10.64

Sqmt

Area Entrace Lobby


N8-N9-P8-P9

N7-N8-S7-S8
T1-T7-M1-M7
M1-M6-L1-L6
Total
Sqmt
Area L1-L6-D1-D6
L1-L6-H1-H6

H3-H6-G3-G6
G1-G6-D1-D6

1
1
1
1
1

Total
Sqmt
Total
This Bill Qty
Lower Terrace-Main Head Room
Above stair case Near
0.5
1
D30-A28-H6
Above stair case Near
0.5
1
N12-A25-A23
Total
PH & He/She Toilet & With Connecting corridor
A34-A31-C1/P22-T1
2
0.5
C3-D3-D6-C5'/N16-P'17-R16'-R17
Rectangular Portion
2
1
Traingular Portion
2
0.5
Total

9.5
9.5

9.10

9.10

5.10
1.50

2.10
2.10

excluding the cost of


el :

m nominal size).

6.395
3.276
7.267
1.105
2.601
0.810
1.025
0.592
1.643
0.625
6.708
4.335
0.841
2.156
0.858
0.527
2.440
1.568
1.372
46.143

oval of form work for :

9.630
6.090
12.350
1.880
4.080
1.620
1.820
1.380
2.300
1.000
11.400
10.200
1.640
3.720
1.660
1.300
4.040
2.240
3.920
82.270

ding watering,raming

8.26
-0.18
-0.18

8.26
-0.18
-0.18

8.26
-0.18
-0.18

8.26
-0.18
-0.18
7.06
-0.38
-0.11
-0.05
-0.05
0.99
1.94
2.05
-0.20
-0.06
7.04
-0.32
-0.22
-0.08
1.02
-0.08
1.02
-0.08
1.30
1.30
1.76
6.08
-0.36

61.16

cified grade excluding the cost of


to plinth level :

ggregate 40 mm nominal size)

0.15
0.05
0.05

12.38
-0.09
-0.09

0.15
0.05
0.05

12.38
-0.09
-0.09

0.15
0.05
0.05

12.38
-0.09
-0.09

0.15
0.05
0.05
0.15

12.38
-0.09
-0.09
10.59

0.05
0.05
0.05
0.05
0.15
0.15
0.15
0.05
0.05
0.15
0.05
0.05
0.05
0.15
0.05
0.15
0.05
0.15
0.15
0.15
0.15
0.05

-0.19
-0.05
-0.03
-0.03
1.49
2.92
3.07
-0.10
-0.03
10.56
-0.16
-0.11
-0.04
1.53
-0.04
1.53
-0.04
1.94
1.94
2.64
9.13
-0.18

Total

95.16

hickness to be specified by the


ved make in all colours shades,
Cement Mortar 1:4 (1 Cement
ement and matching pigment

40.50
-1.04
4.29
-4.80
40.50
-1.04
4.29
-4.80
3.79
3.71
3.71

46.22
-5.40
-1.50
4.29
-6.98
46.22
-5.40
-1.64
4.29
-6.98
3.71
3.71
TOTAL

169.65

orming to IS : 15622 (thickness to be


urs, shades except burgundy, bottle
in skirting, risers of steps and dados
coarse sand) and jointing with grey
cement mixed with pigment of
.

2.25
2.25
0.05
2.25
0.085
2.25
0.085
2.1
2.1

40.05
20.10
0.25
10.44
0.42
35.64
1.26
-12.60
-1.83

2.25
2.25
0.05
2.25
0.085
2.25
0.085
2.1
2.1

40.05
20.10
0.25
10.44
0.42
35.64
1.26
-12.60
-1.83

2.25
2.1
2.25
2.1

18.02
-1.58
17.78
-1.58

Total

2.25

17.78

2.25
2.25
0.05

40.05
20.10
0.25

2.25
0.085
2.25
0.085
2.1
2.1
2.25
2.25
0.05
2.25
0.085
2.25
0.085
2.1
2.1

10.44
0.42
35.64
1.26
-12.60
-1.83
40.05
20.10
0.25
10.44
0.42
35.64
1.26
-12.60
-1.83

2.25
2.1

17.78
-1.58

2.25
2.1
0.33
2.25
2.25

17.78
-1.58
-5.15
31.10
31.10
495.98

chine batched, machine mixed


cement concrete of specified
ete work including pumping of
xcluding the cost of centeri
Depth

Qty

29.39

10.81

26.71

6.30

9.57

2.20

3.73

1.36

8.51

2.38

19.55

6.52

10.04

2.26

7.82

2.55

4.27

4.49

0.680

8.50

2.62

TOTAL

170.79

ng etc. and removal of form for :

etc. For mass concrete.


D

QTY
0.450
0.300
0.380
0.750
0.300
0.300
0.380
0.230
0.450
0.380
0.300
0.230
0.300

38.475
15.750
41.002
12.300
10.800
4.140
6.004
2.622
9.270
3.344
29.880
19.320
4.200

0.380
0.300
0.230
0.300
0.680
0.230

12.312
4.260
2.438
10.680
13.600
7.084

TOTAL

247.481

ofing treatment including


ofs,
terraces
etc size
rickbalconies,
bats 25 mm
to 115mm
y
coat
of
neat
cement
using
2.75
sand)
with
water
coat admixed
of cement
slurry
using
ound
conforming
to
IS.
2645
by Engineer-in-charge
goved
compound
conforming to IS :
b
including
adjoining
walls
upto
5
(1
cement
:5 with
coarse
sand
)
g the surface
20
mm
oreatment.
IS
:
2645
and
approved
by
:4 coarse sand) admixed with
walls
dsimilarly
approvedthe
by adjoining
Engineer-inf walls in
and
quality
topslabs.
layer of plaster
cement slurry and making
hole terrace so finished shall be
s for curing and for final test. All
and specified by the Engineer-

kness at khurra as 65 mm.

77.93
32.21
16.38
9.56
118.10
254.18

3.6505
13.2496
215.2089
35.9775
268.09

117.7848
17.88
117.7848
253.44
775.71
775.71
13.5

64.125

13.5

64.125
128.250
82.81
21.42
3.15
107.380

Sl.No

BOQ No

17.10

17.1.1

17.3

17.3.1

Particulars

Details of Actual Measurements


No's

Providing and fixing water closet squatting pan (Indian type W.C. pan )w
100mm sand cast Iron P or S trap, 10 litre low level white P.V.C. flush
cistern with manually controlled device (handle lever) conforming to I
7231, with all fittings and fixtures complete including cutting and mak
good the walls and floors wherever required
White Vitreous china Orissa pattern W.C. pan of size 580x440mm with integ
type foot rests.
Acadamic Block
Ground Floor
She Toilet
1
He Toilet
1
First Floor
She Toilet
1
He Toilet
1

Providing and fixing


white vitreous china pedestal
type wate
closet(European type) with seat and lid, 10 litre low level white vitreous ch
flushing cistern & C.P. flush bend with fittings & C.I.brackets, 40mm flu
bend, overflow arrangement with specials of standard make and mosqui
proof coupling of approved municipal design complete including paint
of fittings and brackets, cutting and making good the walls and flo
wherever required
W.C. pan with ISI marked white solid plastic seat and lidfoot rests.
Acadamic Block
Ground Floor
She Toilet
2
Physicallu challenged toil
1
He Toilet
2
Physicallu challenged toil
1
Professor
1
Asst Professor
1
Associate Professor
1
First Floor
She Toilet
2
Physicallu challenged toil
1
He Toilet
2
Physicallu challenged toil
1
Asst Professor
1
Asst Professor
1

TOTAL

17.5

17.5.1

17.7

17.7.1

Providing and fixing white vitreous china flat back half stall urinal of s
580x380x350mm with white PVC automatic flushing cistern, with fittin
standard size C.P. brass flush pipe, spreaders with unions and clamps (all
C.P. brass) with waste fitting as per IS : 2556, C.I. trap with outlet grating a
other couplings in C.P. brass including painting of fittings and cutting a
making good the walls and floors wherever required
Single half stall urinal with 5 litre P.V.C. automatic flushing cistern.
Acadamic Block
Ground Floor
He Toilet
4
First Floor
He Toilet
4
TOTAL

Providing and fixing wash basin with C.I. brackets, 15 mm C.P. brasspill
taps,32 mm C.P. brass waste of standard pattern, includingpainting
fittings and brackets, cutting and making good the wallswherever require
White Vitreous China Wash
brass pillar taps.
Acadamic Block
Ground Floor
She Toilet
Physicallu challenged toil
He Toilet
Physicallu challenged toil
Professor
Asst Professor
Associate Professor
First Floor
She Toilet
Physicallu challenged toil
He Toilet
Physicallu challenged toil
Asst Professor
Asst Professor

basin size 630x450 mm with apair of 15 mm C.P

3
1
3
1
1
1
1
3
1
3
1
1
1

100 mm dia.

17.35.1

Centrifugally cast (spun) iron socketed pipe as per IS: 3989.

17.35.1.2

Acadamic Block {Internal}


Ground Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
Assistant Prooffesor Toilet-1
Associate Prooffesor Toilet-2
Prooffesor Toilet
First Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
Assistant Prooffesor Toilet-1
Prooffesor Toilet
External

21.88
20.03
1.38
1.38
1.32
20.9
21.55
1.38
1.32

He Toilet
-External

10.00

She ToiletExternal

10.00

Professor
ToiletExternal

13.28

Associate
Professor
ToiletExternal

10.85

17.35.2.

75 mm dia.

17.35.2.2.

Centrifugally cast (spun) iron socketed pipe as per IS: 3989.

Acadamic Block {Internal}


Ground Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
Assistant Prooffesor Toilet-1
Associate Prooffesor Toilet-2
Prooffesor Toilet
First Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
Assistant Prooffesor Toilet-1
Prooffesor Toilet
External

26.6
29.14
2.85
2.73
2.96
23.05
21.67
2.85
2.96

He Toilet
-External

10.29

She ToiletExternal

10.29

Professor
ToiletExternal

1.86

Associate
Professor
ToiletExternal

11.84

17.39

Providing and fixing plain bend of required degree.

17.39.1

100 mm

17.39.1.2

Centrifugally cast (spun) iron socketed pipe as per IS: 3989.


Acadamic Block {Internal}
Ground Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
Assistant Prooffesor Toile
Associate Prooffesor Toile
Prooffesor Toilet
First Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
Assistant Prooffesor Toile
Prooffesor Toilet
External
He Toilet
External
SHe Toilet
External
Professor
ToiletExternal

7
7
1
1
1
7
7
1
1

Associate
Professor
ToiletExternal

17.39
17.39.2.
17.39.2.2

Providing and fixing plain bend of required degree.


75 mm
Centrifugally cast spun iron S&S as per IS - 3989
Acadamic Block
Ground Floor
He Toilet & PC Toilet
8
She Toilet & PC Toilet
9
Assistant Prooffesor Toile
2
Associate Prooffesor Toile
2
Prooffesor Toilet
1
FirstFloor
He Toilet & PC Toilet
8
She Toilet & PC Toilet
9
Assistant Prooffesor Toile
2
Prooffesor Toilet
1
External
He Toilet
External
SHe Toilet
External
Professor
ToiletExternal

Associate
Professor
ToiletExternal

17.44

Providing and fixing single equal plain junction of required degree :(Y)

17.44.1

100x100x100 mm

17.44.1.2

Centrifugally cast spun iron S&S as per IS - 3989


Acadamic Block
Ground Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
First Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
External
He Toilet
External
SHe Toilet
External
Associate
Professor
ToiletExternal

5
3
5
3

17.44

Providing and fixing single equal plain junction of required degree :(Y)

17.44.2.
17.44.2.2

75X75X75 mm
Centrifugally cast spun iron S&S as per IS - 3989
Acadamic Block
Ground Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
Assistant Prooffesor Toile
Associate Prooffesor Toile
Prooffesor Toilet
First Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
Assistant Prooffesor Toile
Prooffesor Toilet
External

17.58

He Toilet
External

SHe Toilet
External

Associate
Professor
ToiletExternal

6
6
1
1
1
6
6
1
1

Providing lead caulked joints to centrifugally cast (spun) iron pipes and fittings
diameter:(Lead Joint)

17.58.1

100 mm

Acadamic Block
Ground Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
Assistant Prooffesor Toile
Associate Prooffesor Toile
Prooffesor Toilet
First Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
Assistant Prooffesor Toile
Prooffesor Toilet
External
He Toilet
External

12

28
23
2
2
2
28
23
2
2

SHe Toilet
External

17.58

12

Professor
ToiletExternal

12

Associate
Professor
ToiletExternal

15

Providing lead caulked joints to centrifugally cast (spun) iron pipes and fittings
diameter:(Lead Joint)

17.58.2

75 mm

Acadamic Block
Ground Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
Assistant Prooffesor Toile
Associate Prooffesor Toile
Prooffesor Toilet
First Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
Assistant Prooffesor Toile

39
42
10
8
8
39
42
10

Prooffesor Toilet
He Toilet
External
SHe Toilet
External

17.60.

8
13

13

Professor
ToiletExternal

Associate
Professor
ToiletExternal

18

Providing and fixing trap of self cleansing design with screwed down orhinged
grating with or without vent arm complete, including cost ofcutting and making
good the walls and floors :
100 mm inlet and 100 mm outlet

17.60.1

Acadamic Block
Ground Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
First Floor
He Toilet & PC Toilet
She Toilet & PC Toilet

18.9.

1
1
1
1

Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes,having


thermal stability for hot & cold water supply including all CPVC plain & brass threaded
fittings .This includes jointing of pipes & fittings with one step CPVC solvent cement
,trenching ,refilling & testing of joints complete as per direction of Engineer in Charge.

18.9.5.

40mm nominal inner dia .Pipes

Acadamic Block
Ground Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
Assistant Prooffesor Toilet-1
Associate Prooffesor Toilet-2
Prooffesor Toilet
First Floor
He Toilet & PC Toilet

6.12
1.83
0.8
0.85
0.85
6.12

She Toilet & PC Toilet


Assistant Prooffesor Toilet-1
Prooffesor Toilet

18.9.6.

50mm nominal inner dia .Pipes

Acadamic Block
Ground Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
First Floor
He Toilet & PC Toilet
She Toilet & PC Toilet

18.1

1.83
0.8
0.85

3.35
2.27
3.35
2.27

Providing and fixing G.I. pipes (Medium class) complete with G.I. fittings and
clamps, including cutting and making good the walls etc.
Internal work - Exposed on wall

18.10.1

15 mm dia. nominal bore

Acadamic Block-D1
Ground Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
Assistant Prooffesor Toilet-1
Associate Prooffesor Toilet-2
Prooffesor Toilet
First Floor
He Toilet & PC Toilet
She Toilet & PC Toilet

5.7
6.74
4.42
3.11
3.89
5.7
6.74

Assistant Prooffesor Toilet-1


Prooffesor Toilet

4.42
3.89

Professor
Toilet

0.8

Associate
professor
Toilet

3.7

18.10.2

20mm dia. nominal bore


He Toilet
External
3.4
She Toilet
External

18.10.3

11.2

25 mm dia. nominal bore

Acadamic Block
Ground Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
First Floor
He Toilet & PC Toilet
She Toilet & PC Toilet

Acadamic Block
Ground Floor
He Toilet & PC Toilet

7.4
2.53
7.4
2.53

6.4

She Toilet & PC Toilet


First Floor
He Toilet & PC Toilet
She Toilet & PC Toilet
External
He Toilet

2.2

She Toilet

2.2

Professor
Toilet

7.2

Associate
professor
Toilet
Terrace

7.3
2.65

6.6
6.4
6.6

Unit Wt

Contents
Area

an (Indian type W.C. pan )with


low level white P.V.C. flushing
ndle lever) conforming to IS :
including cutting and making

f size 580x440mm with integral

1.00
1.00

TOTAL

1.00
1.00
4.00

na pedestal
type water
e low level white vitreous china
s & C.I.brackets, 40mm flush
standard make and mosquito
gn complete including painting
ng good the walls and floors

stic seat and lidfoot rests.

2.00
1.00
2.00
1.00
1.00
1.00
1.00
2.00
1.00
2.00
1.00
1.00
1.00

17.00

t back half stall urinal of size


flushing cistern, with fittings,
with unions and clamps (all in
C.I. trap with outlet grating and
ng of fittings and cutting and
uired
tic flushing cistern.

4.00
4.00
8.00

ckets, 15 mm C.P. brasspillar


pattern, includingpainting of
the wallswherever require
mm with apair of 15 mm C.P.

3.00
1.00
3.00
1.00
1.00
1.00
1.00

TOTAL

3.00
1.00
3.00
1.00
1.00
1.00
21.00

d pipe as per IS: 3989.

21.880
20.030
1.380
1.380
1.320
20.900
21.550
1.380
1.320

10.00

10.00

13.28

10.85

TOTAL

135.270

pipe as per IS: 3989.

26.600
29.140
2.850
2.730
2.960
23.050
21.670
2.850
2.960

10.29

10.29

1.86

11.84

TOTAL

149.090

f required degree.

d pipe as per IS: 3989.

7.00
7.00
1.00
1.00
1.00
7.00
7.00
1.00
1.00

2.00

2.00

1.00

3.00

TOTAL

41.00

f required degree.
as per IS - 3989

8.00
9.00
2.00
2.00
1.00
8.00
9.00
2.00
1.00

2.00

2.00

1.00

3.00

TOTAL

50.00

on of required degree :(Y)

as per IS - 3989

5.00
3.00
5.00
3.00

1.00

1.00

1.00

TOTAL

19.00

on of required degree :(Y)

as per IS - 3989

6.00
6.00
1.00
1.00
1.00
6.00
6.00
1.00
1.00

1.00
1.00

1.00

TOTAL

32.00

t (spun) iron pipes and fittings of


nt)

28.00
23.00
2.00
2.00
2.00
28.00
23.00
2.00
2.00

12.00

12.00

12.00

15.00

TOTAL

163.00

t (spun) iron pipes and fittings of


nt)

39.00
42.00
10.00
8.00
8.00
39.00
42.00
10.00

8.00
13.00

13.00

4.00

18.00

TOTAL

254.00

with screwed down orhinged


ing cost ofcutting and making

m outlet

1
1
1
1

TOTAL

oride (CPVC) pipes,having


all CPVC plain & brass threaded
ne step CPVC solvent cement
direction of Engineer in Charge.

.Pipes

6.120
1.830
0.800
0.850
0.850
6.120

1.830
0.800
0.850

TOTAL

20.050

.Pipes

3.350
2.270
3.350
2.270

TOTAL

11.240

mplete with G.I. fittings and


alls etc.
on wall

ore

5.700
6.740
4.420
3.110
3.890
5.700
6.740

4.420
3.890

0.80

3.70

TOTAL

49.110

bore

3.40

11.20

Total

14.60

ore

7.400
2.530
7.400
2.530
TOTAL

19.860

6.400

6.600
6.400
6.600
2.20
2.20
7.20

7.30

2.65
TOTAL

47.550

You might also like