You are on page 1of 14

SAN PEDRO LANDFILL GAS

RECOVERY AND POWER


GENERATION PROJECT

Contents

The 4-MW Landll Methane Recovery


and Power Genera9on Project is
located in San Pedro, Laguna. It is
18km from Maka9 City


- Owned and operated by


Pilotage Trading and
Construc7on
- The San Pedro Sanitary
Landll has been receiving
waste since 2003
- Cell 1-5 = 18 Has
- Currently receiving waste
from Municipalites of
Laguna

- BEI has installed 84
collec7ng wells throughout
cell 1-4

Installed Capacity

4,212 MW (4MW)

Engine Specs

4 Jenbacher Gas Engines (J320) each with a design capacity of


1053 kW (1MW), contained in 20S containers

Engine Eciency

40.32%

Fuel Gas LHV

100% (Full
load)

75% (Par7al
load)

50% (Half
load)

Gas Volume

Nm3

679

528

376

Electrical
output

kW

1053

789

523

MILESTONE

DATE

Incorpora9on of BEI

July 2007

Commenced Drilling of Wells

November 2007

Approval of Loan from DBP

June 2009

Onsite Groundbreaking for construc9on of Power Plant

November 2009

Comple9on of PDD (for CDM)

December 2009

Received ECC from DENR

June 25 2009

Awarded a Biomass RE Opera9ng Contract from DOE

February 1 2010

Signed a Power Purchase Agreement with MERALCO

November 12 2010

Comple9on of Plant Commissioning

December 13 2010

Received COC from ERC

Jan 31 2011

Received Le`er of Approval from Host DNA (DENR)

March 7 2011

Start of Commercial Opera9on

March 15 2011

[clean]

LAND FILLING

END USERS

GAS WELL DRILLING &


INSTALATION

ELECTRIC DISTRIBUTION TO
THE GRID

LFG PROCESSING &


EXTRACTION UNIT

LFG POWER
GENERATION

BALANCING THE GAS FIELD


Involves Balancing ow, oxygen, methane and pressure

Primary Considera7ons in Managing Landll Gas Extrac9on:
Mi9ga9on Escape of GHG
Maximize u9lisa9on of CH4 (CH4 50 %volume)
Minimize O2 levels (O2%volume)

Classied as a Clean Development Mechanism Project (CDM) and is



expected
to receive cer9ed emission reduc9on (CER) cer9cates
from:

1) The Collec9on and Destruc9on of methane generated from the
landll
2) The Displacement of pollu9ng fuel sources used in electricity
genera9on.

Expected to generate upto 130,000 tCO2e over a 10 year Credi9ng
period

PDD

BEI

Host Country
Approval

DENR

Valida9on of Project SIRIM QAS


Submission of
Valida9on Report
and PDD

We are Here!

CDM Execu9ve
Board

Registra9on of CDM CDM Execu9ve


project
Board
Verica9on and
Cer9ca9on

DOE

Issuance of CERS to
BEI