Work Item
Unit
m2
nr
nr
nr
nr
Range (RM)
Average (RM)
28.70 - 28.70
28.70
Location
Range (RM)
Average (RM)
98000.00 - 98000.00
98000.00
Location
Range (RM)
Average (RM)
30.00 - 30.00
30.00
Location
Range (RM)
Average (RM)
1700.00 - 1700.00
1700.00
Location
Range (RM)
Average (RM)
450.00 - 450.00
450.00
Location
Range (RM)
Average (RM)
RM 28.70
RM 98000.00
RM 30.00
RM 1700.00
RM 450.00
RM 900.00
1 / 13
Work Item
Unit
Bearing Pad
Supply and install laminated rubber bearing, including
forming expandite or equivalent epoxy mortar as
shown in drawings
600mm x 350mm x 100mm thick IRHD60
STRUCTURE BRIDGE WORKS
NEW BRIDGES
Bearing Pad
Supply and install laminated rubber bearing, including
forming expandite or equivalent epoxy mortar as
shown in drawings
250mm x 50mm bearing strip for approach abutment
m3
m2
m2
900.00 - 900.00
900.00
Location
Range (RM)
Average (RM)
410.00 - 410.00
410.00
Location
Range (RM)
Average (RM)
9.84 - 9.84
9.84
Location
Range (RM)
Average (RM)
40.00 - 40.00
40.00
Location
Range (RM)
Average (RM)
700.00 - 700.00
700.00
Location
Range (RM)
Average (RM)
35.00 - 35.00
35.00
RM 410.00
RM 9.84
RM 40.00
RM 700.00
RM 35.00
2 / 13
Work Item
Unit
m2
m2
no
m3
m2
Range (RM)
Average (RM)
25.00 - 25.00
25.00
Location
Range (RM)
Average (RM)
12.00 - 12.00
12.00
Location
Range (RM)
Average (RM)
35.00 - 35.00
35.00
Location
Range (RM)
Average (RM)
10.00 - 10.00
10.00
Location
Range (RM)
Average (RM)
9.84 - 9.84
9.84
Location
Range (RM)
Average (RM)
RM 25.00
RM 12.00
RM 35.00
RM 10.00
RM 9.84
RM 15.00
3 / 13
Work Item
Unit
Earthwork
Supply and paint 2 coats of bitumenous paint behind
abutments as shown in drawings.
STRUCTURE BRIDGE WORKS
NEW BRIDGES
In-situ concrete
Crusher run base
150mm thick crusher run below pile caps
m2
nr
nr
nr
15.00 - 15.00
15.00
Location
Range (RM)
Average (RM)
11.40 - 11.40
11.40
Location
Range (RM)
Average (RM)
1000.00 - 1000.00
1000.00
Location
Range (RM)
Average (RM)
1000.00 - 1000.00
1000.00
Location
Range (RM)
Average (RM)
2500.00 - 2500.00
2500.00
Location
Range (RM)
Average (RM)
RM 11.40
RM 1000.00
RM 1000.00
RM 2500.00
RM 450.00
4 / 13
Work Item
Unit
m3
nr
450.00 - 450.00
450.00
Location
Range (RM)
Average (RM)
30.00 - 30.00
30.00
Location
Range (RM)
Average (RM)
355.00 - 355.00
355.00
Location
Range (RM)
Average (RM)
410.00 - 410.00
410.00
Location
Range (RM)
Average (RM)
25.00 - 25.00
25.00
Location
Range (RM)
Average (RM)
700.00 - 700.00
700.00
Location
Range (RM)
Average (RM)
RM 30.00
RM 355.00
RM 410.00
RM 25.00
RM 700.00
RM 160.00
5 / 13
Work Item
Unit
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Fabricate and install pipe joints to incompletely driven
piles as approved by P.P including supply, cutting and
welding of steel plates
STRUCTURE BRIDGE WORKS
BRIDGE WORKS
NEW BRIDGES
Precast Post-Tensioned Beams
Launching the existing 40.00m precast post tensioned
Grade 50 concrete T-Beams
nr
nr
m2
nr
m2
160.00 - 160.00
160.00
Location
Range (RM)
Average (RM)
22000.00 - 22000.00
22000.00
Location
Range (RM)
Average (RM)
30000.00 - 30000.00
30000.00
Location
Range (RM)
Average (RM)
1.80 - 1.80
1.80
Location
Range (RM)
Average (RM)
30.00 - 30.00
30.00
Location
Range (RM)
Average (RM)
RM 22000.00
RM 30000.00
RM 1.80
RM 30.00
RM 12.00
6 / 13
Work Item
Unit
tonne
tonne
m2
m3
nr
nr
12.00 - 12.00
12.00
Location
Range (RM)
Average (RM)
3200.00 - 3200.00
3200.00
Location
Range (RM)
Average (RM)
3200.00 - 3200.00
3200.00
Location
Range (RM)
Average (RM)
40.00 - 40.00
40.00
Location
Range (RM)
Average (RM)
190.00 - 190.00
190.00
Location
Range (RM)
Average (RM)
10000.00 - 10000.00
10000.00
Location
Range (RM)
Average (RM)
RM 3200.00
RM 3200.00
RM 40.00
RM 190.00
RM 10000.00
RM 100.00
7 / 13
Work Item
Unit
tonne
m3
tonne
nr
m2
100.00 - 100.00
100.00
Location
Range (RM)
Average (RM)
3200.00 - 3200.00
3200.00
Location
Range (RM)
Average (RM)
350.00 - 350.00
350.00
Location
Range (RM)
Average (RM)
3200.00 - 3200.00
3200.00
Location
Range (RM)
Average (RM)
230.00 - 230.00
230.00
Location
Range (RM)
Average (RM)
12.00 - 12.00
12.00
Location
Range (RM)
Average (RM)
RM 3200.00
RM 350.00
RM 3200.00
RM 230.00
RM 12.00
RM 50.00
8 / 13
Work Item
Unit
m3
m3
m3
nr
nr
nr
50.00 - 50.00
50.00
Location
Range (RM)
Average (RM)
26.00 - 26.00
26.00
Location
Range (RM)
Average (RM)
350.00 - 350.00
350.00
Location
Range (RM)
Average (RM)
50.00 - 50.00
50.00
Location
Range (RM)
Average (RM)
3000.00 - 3000.00
3000.00
Location
Range (RM)
Average (RM)
30.00 - 30.00
30.00
Location
Range (RM)
Average (RM)
RM 26.00
RM 350.00
RM 50.00
RM 3000.00
RM 30.00
RM 30.00
9 / 13
Work Item
Unit
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Handle and pitch raked piles of 6.00m long
STRUCTURE BRIDGE WORKS
NEW BRIDGES
In-situ concrete
Polythene Sheet
0.25mm thick polyethelene sheet on top of crusher run
base
m2
sum
nr
30.00 - 30.00
30.00
Location
Range (RM)
Average (RM)
8.00 - 8.00
8.00
Location
Range (RM)
Average (RM)
9000.00 - 9000.00
9000.00
Location
Range (RM)
Average (RM)
30.00 - 30.00
30.00
Location
Range (RM)
Average (RM)
48.00 - 48.00
48.00
Location
Range (RM)
Average (RM)
30.00 - 30.00
30.00
RM 8.00
RM 9000.00
RM 30.00
RM 48.00
RM 30.00
10 / 13
Work Item
Unit
m3
m3
nr
m3
nr
Range (RM)
Average (RM)
8.50 - 8.50
8.50
Location
Range (RM)
Average (RM)
2.70 - 2.70
2.70
Location
Range (RM)
Average (RM)
35.50 - 35.50
35.50
Location
Range (RM)
Average (RM)
2500.00 - 2500.00
2500.00
Location
Range (RM)
Average (RM)
14.76 - 14.76
14.76
Location
Range (RM)
Average (RM)
RM 8.50
RM 2.70
RM 35.50
RM 2500.00
RM 14.76
RM 3100.00
11 / 13
Work Item
Unit
NEW BRIDGES
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Supply, transport and store initial piles of 12.00 m
lenght including x-pointed m.s shoes
STRUCTURE BRIDGE WORKS
NEW BRIDGES
Reinforcement
High Yield Steel
20mm diameter
STRUCTURE BRIDGE WORKS
NEW BRIDGES
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Handle and pitch raked piles of 12.00m long
tonne
nr
3100.00 - 3100.00
3100.00
Location
Range (RM)
Average (RM)
3200.00 - 3200.00
3200.00
Location
Range (RM)
Average (RM)
30.00 - 30.00
30.00
RM 3200.00
RM 30.00
12 / 13
Nota
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur
Catatan
13 / 13