CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Bituminous Pavement Courses
50mm thick asphaltic concrete wearing course

m2

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Precast Post-Tensioned Beams
Supply and launch new 40.00m precast post tensioned
grade 50 concrete T-Beams as specified in drawings
leading to the final completed stage fully integrated to
the bridge deck and diaphragm beam

nr

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Handle and pitch vertical piles of 12.00m long

nr

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Supply, transport and store extension piles of 6.00 m
lenght including x-pointed m.s shoes

nr

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Bridge parapet
Construction precast concrete parapet including metal
railing and c/w 150mm dia P.V.C for services ducting
and vertical expansion joints as shown on drawing

STRUCTURE BRIDGE WORKS


NEW BRIDGES

nr

Overall Average (RM)


Location

Range (RM)

Average (RM)

28.70 - 28.70

28.70

Location

Range (RM)

Average (RM)

98000.00 - 98000.00

98000.00

Location

Range (RM)

Average (RM)

30.00 - 30.00

30.00

Location

Range (RM)

Average (RM)

1700.00 - 1700.00

1700.00

Location

Range (RM)

Average (RM)

450.00 - 450.00

450.00

Location

Range (RM)

Average (RM)

RM 28.70

RM 98000.00

RM 30.00

RM 1700.00

RM 450.00

RM 900.00

1 / 13

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

Bearing Pad
Supply and install laminated rubber bearing, including
forming expandite or equivalent epoxy mortar as
shown in drawings
600mm x 350mm x 100mm thick IRHD60
STRUCTURE BRIDGE WORKS
NEW BRIDGES
Bearing Pad
Supply and install laminated rubber bearing, including
forming expandite or equivalent epoxy mortar as
shown in drawings
250mm x 50mm bearing strip for approach abutment

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Earthwork
Excavate at abutments and stockpile and reuse as
directed by the S.O. inclusive of planking, shuttering,
dewatering, trimming and etc.

m3

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Formwork
Class F3
Sides of abutments

m2

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Expansion Joints
Supply and fix 90mm elastomeric fabric reinforced
Expansion Joint for the bridge deck or equivalent as
shown in drawings

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Formwork
Class F1
Sides of pile caps

m2

Overall Average (RM)


F

900.00 - 900.00

900.00

Location

Range (RM)

Average (RM)

410.00 - 410.00

410.00

Location

Range (RM)

Average (RM)

9.84 - 9.84

9.84

Location

Range (RM)

Average (RM)

40.00 - 40.00

40.00

Location

Range (RM)

Average (RM)

700.00 - 700.00

700.00

Location

Range (RM)

Average (RM)

35.00 - 35.00

35.00

RM 410.00

RM 9.84

RM 40.00

RM 700.00

RM 35.00

2 / 13

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Coating
Apply two coats of silane-siloxane based primer and
two coats of solvent based methacrylated pigmented
top coat to all exposed concrete surface of T beam &
abutment

m2

STRUCTURE BRIDGE WORKS


In-situ concrete
Blinding concrete
Grade 15
50mm thick under approach slab

m2

STRUCTURE BRIDGE WORKS


Drainage works
Supply and lay precast drain cover as shown in
drawings
Scupper drain
400mm x 780mm x 75mm thick

no

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Miscellaneous
Shape Polystyrene
Shape polystyrene or approved equivalent between
T10a beam bottom flanges

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Earthwork
Excavate to form river channel other than rock and
transport to tip-off site provided by the contractor for
disposal

m3

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES

m2

Overall Average (RM)


Location

Range (RM)

Average (RM)

25.00 - 25.00

25.00

Location

Range (RM)

Average (RM)

12.00 - 12.00

12.00

Location

Range (RM)

Average (RM)

35.00 - 35.00

35.00

Location

Range (RM)

Average (RM)

10.00 - 10.00

10.00

Location

Range (RM)

Average (RM)

9.84 - 9.84

9.84

Location

Range (RM)

Average (RM)

RM 25.00

RM 12.00

RM 35.00

RM 10.00

RM 9.84

RM 15.00

3 / 13

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

Earthwork
Supply and paint 2 coats of bitumenous paint behind
abutments as shown in drawings.
STRUCTURE BRIDGE WORKS
NEW BRIDGES
In-situ concrete
Crusher run base
150mm thick crusher run below pile caps

m2

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Miscellaneous
Brass Plaque
Brass plaque to bridge

nr

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
To supply and place infill concrete grade 40/20 to the
internal core of spun pile for 3000 length c/w HT bars
tack welded to 6mm thick m.s plate, 7 nos. T20 vertical
bars and links all other items as shown on the drawing

nr

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Piling
Provide pile driving analysis (PDA) to 2 times of
working capacity i.e 2600kN and providing all
necessary materials, equipment, labour, records and
submission of records.

nr

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Bridge parapet
Construction cast insitu concrete parapet including
metal railing and c/w 150mm dia. P.V.C for services

Overall Average (RM)


F

15.00 - 15.00

15.00

Location

Range (RM)

Average (RM)

11.40 - 11.40

11.40

Location

Range (RM)

Average (RM)

1000.00 - 1000.00

1000.00

Location

Range (RM)

Average (RM)

1000.00 - 1000.00

1000.00

Location

Range (RM)

Average (RM)

2500.00 - 2500.00

2500.00

Location

Range (RM)

Average (RM)

RM 11.40

RM 1000.00

RM 1000.00

RM 2500.00

RM 450.00

4 / 13

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

ducting along wing wall


STRUCTURE BRIDGE WORKS
NEW BRIDGES
Miscellaneous
Cork Filler
12mm thick cork filler between approach slabs and
abutments headwalls

STRUCTURE BRIDGE WORKS


NEW BRIDGES
In-situ concrete
Grade 40/20 for superstructural
Pilecap

m3

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Bearing Pad
Supply and install laminated rubber bearing, including
forming expandite or equivalent epoxy mortar as
shown in drawings
250mm x 50mm bearing strip for approach slab

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Bearing Pad
Supply and install laminated rubber bearing, including
forming expandite or equivalent epoxy mortar as
shown in drawings
Filter and sealant joint as shown on drawings

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Expansion Joints
Supply and fix 65mm elastomeric fabric reinforced
Expansion Joint for the bridge deck or equivalent as
shown in drawings

STRUCTURE BRIDGE WORKS


NEW BRIDGES

nr

Overall Average (RM)


F

450.00 - 450.00

450.00

Location

Range (RM)

Average (RM)

30.00 - 30.00

30.00

Location

Range (RM)

Average (RM)

355.00 - 355.00

355.00

Location

Range (RM)

Average (RM)

410.00 - 410.00

410.00

Location

Range (RM)

Average (RM)

25.00 - 25.00

25.00

Location

Range (RM)

Average (RM)

700.00 - 700.00

700.00

Location

Range (RM)

Average (RM)

RM 30.00

RM 355.00

RM 410.00

RM 25.00

RM 700.00

RM 160.00

5 / 13

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Fabricate and install pipe joints to incompletely driven
piles as approved by P.P including supply, cutting and
welding of steel plates
STRUCTURE BRIDGE WORKS
BRIDGE WORKS
NEW BRIDGES
Precast Post-Tensioned Beams
Launching the existing 40.00m precast post tensioned
Grade 50 concrete T-Beams

nr

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Piling
Piles load test to 2 times of working capacity i.e.
2600kN and providing all necessary materials,
equipments, labour, records and submission of
records.
Vertical piles

nr

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Bituminous Pavement Courses
Supply and lay bituminous prime coat, or approved
equivalent on bridge deck

m2

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Handle and pitch vertical piles of 6.00m long

nr

STRUCTURE BRIDGE WORKS


In-situ concrete
Blinding concrete
Grade 15

m2

Overall Average (RM)


F

160.00 - 160.00

160.00

Location

Range (RM)

Average (RM)

22000.00 - 22000.00

22000.00

Location

Range (RM)

Average (RM)

30000.00 - 30000.00

30000.00

Location

Range (RM)

Average (RM)

1.80 - 1.80

1.80

Location

Range (RM)

Average (RM)

30.00 - 30.00

30.00

Location

Range (RM)

Average (RM)

RM 22000.00

RM 30000.00

RM 1.80

RM 30.00

RM 12.00

6 / 13

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

50mm thick under abutments


STRUCTURE BRIDGE WORKS
NEW BRIDGES
Reinforcement
High Yield Steel
12mm diameter

tonne

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Reinforcement
High Yield Steel
32mm diameter

tonne

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Formwork
Class F3
Sides of piers

m2

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Gabion Toe Wall, Mattress & Rubble pitching
Construct abutment base topping and 900mm wide
rubble pitching for bridge inspection access c/w railing
& steps to details etc

m3

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Precast Post-Tensioned Beams
Restress the exiting 40m precast post-tensioned
Grade 50 concrete T-Beams launched in deck position
leading to the final completed stage fully integrated to
the bridge deck and diaphragm beam.

nr

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Piling

nr

Overall Average (RM)


F

12.00 - 12.00

12.00

Location

Range (RM)

Average (RM)

3200.00 - 3200.00

3200.00

Location

Range (RM)

Average (RM)

3200.00 - 3200.00

3200.00

Location

Range (RM)

Average (RM)

40.00 - 40.00

40.00

Location

Range (RM)

Average (RM)

190.00 - 190.00

190.00

Location

Range (RM)

Average (RM)

10000.00 - 10000.00

10000.00

Location

Range (RM)

Average (RM)

RM 3200.00

RM 3200.00

RM 40.00

RM 190.00

RM 10000.00

RM 100.00

7 / 13

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

Cut piles to the levels and provide pile head


connection, including M.S plates, anchorage bars, etc.
as specified in drawings
STRUCTURE BRIDGE WORKS
NEW BRIDGES
Reinforcement
High Yield Steel
16mm diameter

tonne

STRUCTURE BRIDGE WORKS


NEW BRIDGES
In-situ concrete
Grade 40/20 for superstructural
Piers

m3

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Reinforcement
High Yield Steel
25mm diameter

tonne

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Miscellaneous
Dowel Bars
Supply and fix twin 40mm dia. 850mm long galvanised
H.Y dowel bars, including M.S 60mm I.D x 10mm thick
x 220mm long galvanised M.S sleeve, compressible
material, 60mm ruubble dowel caps, etc. for fixed end
as shown in drawings

nr

STRUCTURE BRIDGE WORKS


In-situ concrete
Blinding concrete
Grade 15
50mm thick under pile cap

m2

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Drainage works

Overall Average (RM)


F

100.00 - 100.00

100.00

Location

Range (RM)

Average (RM)

3200.00 - 3200.00

3200.00

Location

Range (RM)

Average (RM)

350.00 - 350.00

350.00

Location

Range (RM)

Average (RM)

3200.00 - 3200.00

3200.00

Location

Range (RM)

Average (RM)

230.00 - 230.00

230.00

Location

Range (RM)

Average (RM)

12.00 - 12.00

12.00

Location

Range (RM)

Average (RM)

RM 3200.00

RM 350.00

RM 3200.00

RM 230.00

RM 12.00

RM 50.00

8 / 13

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

Supply and lay perforated PVC wrapped in approved


geotextile c/w crushed rock packing, behind
abutments as shown in drawings.
150mm diameter
STRUCTURE BRIDGE WORKS
BRIDGE WORKS
NEW BRIDGES
Earthwork
Selected filter material behind abutments including
weep holes, where applicable.

m3

STRUCTURE BRIDGE WORKS


NEW BRIDGES
In-situ concrete
Grade 40/20 for superstructural
Capping beam

m3

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Earthwork
Granular backfill between wingwalls.

m3

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Supply, transport and store extension piles of 12.00 m
lenght including x-pointed m.s shoes

nr

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Handle and pitch raked piles of 9.00m long

nr

STRUCTURE BRIDGE WORKS


NEW BRIDGES

nr

Overall Average (RM)


F

50.00 - 50.00

50.00

Location

Range (RM)

Average (RM)

26.00 - 26.00

26.00

Location

Range (RM)

Average (RM)

350.00 - 350.00

350.00

Location

Range (RM)

Average (RM)

50.00 - 50.00

50.00

Location

Range (RM)

Average (RM)

3000.00 - 3000.00

3000.00

Location

Range (RM)

Average (RM)

30.00 - 30.00

30.00

Location

Range (RM)

Average (RM)

RM 26.00

RM 350.00

RM 50.00

RM 3000.00

RM 30.00

RM 30.00

9 / 13

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Handle and pitch raked piles of 6.00m long
STRUCTURE BRIDGE WORKS
NEW BRIDGES
In-situ concrete
Polythene Sheet
0.25mm thick polyethelene sheet on top of crusher run
base

m2

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Piling
Allow for mobilization and demobilization of all labour,
plants piling, equipments, etc on site for proposed
piling works

sum

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Handle and pitch vertical piles of 9.00m long

nr

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Drive vertical piles to the required set or penetration

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Drainage works
Supply and install UPVC bridge deck drainage as
shown in drawings
100mm diameter

Overall Average (RM)


F

30.00 - 30.00

30.00

Location

Range (RM)

Average (RM)

8.00 - 8.00

8.00

Location

Range (RM)

Average (RM)

9000.00 - 9000.00

9000.00

Location

Range (RM)

Average (RM)

30.00 - 30.00

30.00

Location

Range (RM)

Average (RM)

48.00 - 48.00

48.00

Location

Range (RM)

Average (RM)

30.00 - 30.00

30.00

RM 8.00

RM 9000.00

RM 30.00

RM 48.00

RM 30.00

10 / 13

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Earthwork
Excavate, load, haul and dispose any material except
rock to Contractor's dump site as approved by
S.O/P.D*

m3

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Earthwork
Backfill with suitable materials below and above
pilecaps and adjacent to structures, including
transportation

m3

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Drive raked piles to the required set or penetration

STRUCTURE BRIDGE WORKS


NEW BRIDGES
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Supply, transport and store extension piles of 9.00 m
lenght including x-pointed m.s shoes

nr

STRUCTURE BRIDGE WORKS


BRIDGE WORKS
NEW BRIDGES
Earthwork
Excavate at abutments and stockpile and disposal of
surplus excavated material to contractor's own dump
site.

m3

STRUCTURE BRIDGE WORKS

nr

Overall Average (RM)


Location

Range (RM)

Average (RM)

8.50 - 8.50

8.50

Location

Range (RM)

Average (RM)

2.70 - 2.70

2.70

Location

Range (RM)

Average (RM)

35.50 - 35.50

35.50

Location

Range (RM)

Average (RM)

2500.00 - 2500.00

2500.00

Location

Range (RM)

Average (RM)

14.76 - 14.76

14.76

Location

Range (RM)

Average (RM)

RM 8.50

RM 2.70

RM 35.50

RM 2500.00

RM 14.76

RM 3100.00

11 / 13

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Work Item

Unit

NEW BRIDGES
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Supply, transport and store initial piles of 12.00 m
lenght including x-pointed m.s shoes
STRUCTURE BRIDGE WORKS
NEW BRIDGES
Reinforcement
High Yield Steel
20mm diameter
STRUCTURE BRIDGE WORKS
NEW BRIDGES
Piling
600mm Diameter pretension high strenght Grade 80
concrete spun piles
Handle and pitch raked piles of 12.00m long

tonne

nr

Overall Average (RM)


F

3100.00 - 3100.00

3100.00

Location

Range (RM)

Average (RM)

3200.00 - 3200.00

3200.00

Location

Range (RM)

Average (RM)

30.00 - 30.00

30.00

RM 3200.00

RM 30.00

12 / 13

Portal RATOL & Rates PreMo


CAWANGAN KONTRAK DAN UKUR BAHAN 02.03.2015

Nota
Sekiranya anda mempunyai sebarang pertanyaan, sila hubungi:
Ketua Penolong Pengarah Kanan
Bahagian Perolehan dan Khidmat Kos
Cawangan Kontrak dan Ukur Bahan
Ibu Pejabat JKR Malaysia
Tingkat 19, Menara Tun Ismail Mohamed Ali
No 25, Jalan Raja Laut
50582 Kuala Lumpur

Catatan

u.p: En Husnan Husin


Tel: 03-26161111
Email: husnan@jkr.gov.my

13 / 13