You are on page 1of 44

Servicing the World of Construction

PT. MULTI ADVERINDO

Contents
1.

Words From The Board

2.

Company Details

3.

Professional Team

4.

List of Equipments

5.

Reference List of Major Projects

6.

Company Policy in Quality Assurance

7.

Company Policy in Health, Safety and Environmental

8.

Certificates

9.

Documentation

Words from the Board


In servicing the world of construction, PT Multi Adverindo
was established in 2003. In our very early stage, we even
started with only old and used machines. We believe our
solid team work determines our own and the future of the
company.
In the period of only five years since the establishment, PT Multi Adverindo has
expanded the range of activities and performed numerous of projects in the wide scope
of civil construction for and on the satisfaction of States Own and Private Clients.
Such performed has been accompanied by corresponding accumulation of :
Professional staffs in engineering, surveyors, mechanics, logistic and HSE staff
Equipments and fleet development and innovation.
Since the beginning, we maintain an extensive inventory of equipment and is
constantly being increased and upgraded. Our extensive inventory of well-maintained
and work ready equipment which allows us to perform to client's expectations and
beyond on both small and large projects. We realizes that equipment requires
continual reinvestment for maximum efficiency with minimal downtime on our
projects.
We focus on state-of-the-art technology, safety and productivity, and we offer a degree
of professionalism and quality unmatched by our competition. Looking toward the
future, we will continue our commitment to provide the best in construction, safety
and environmental contracting services.
In PT Multi Adverindo, we are ready in servicing the world of construction and expects
continuous growth in the years to come. We invite you to experience the satisfaction of
working with PT Multi Adverindo and in assisting you to realize your goals.

Ir. Askaris Chioe


President Director

Company Profile

Servicing the World


of Construction

Company Name

PT MULTI ADVERINDO

Head Office

Jl. Mawar No. 5 Perumahan Cemara Asri


Medan 20371
Phone
: +62 61 6631666, 6638666
Facsimile : +62 61 6630666, 6631590
Email
: multi_adverindo@multiadverindo.com

Workshop

Bengkel GM
Jl. Sisingamangaraja KM.12 No. 88 Medan

Deed of Establishment
( Akte Pendirian )

No. 15 dated 11 August 2003

Other Certificate
( Akte Perubahan )

No. 110 dated 20 November 2007


No. 13 dated 5 November 2008

Registration of Companys
Certifcates

C-21394 HT.01.01.TH.2003 dated 9 September 2003


C-07712 HT.01.04.TH.2007 dated 27 December
2007

( Pengesahan Akte )

AHU-90128.AH.01.02.Tahun2008 dated 26 Nov 2008

Tax Register Identification


( NPWP )

01.516.976.6-123.000

Trading Business Permit


( SIUP )

No. 503.570/1977/02.13/PB/III/2009
dated 12 September 2008

License of Business Palace


( Surat Domisili )

No. 470/2079/2008
dated 20 October 2008

License of Construction Permit

( SIUJK )

No.1.127349.1212.2.00223/2009
dated 14 April 2009

Company Registration
( TDP )

No. 021315101238
dated 19 March 2009

Construction Firm Certificate No. 0152/GAPEKSINDO/02/03/10


( SBU )
dated 05 March 2010
License of Mining Permit
( SIUJP )

No.658.K/30/DJB/2012
dated 12 June 2012

Classification

Grade 7

ISO 9001 : 2008

16 100 0678

Board Management
President Director

Ir. Askaris Chioe

Technical Director

Ir. Rudy Bokslag

Operational Director

Henry, SE.

Marketing Director

Sarung, ST., MT.

Commercial Director

Besdy, SE.

Engineering Manager

Litto Thamsir, ST., M.Eng.

Finance Manager

Drs. Koko Wijaya

Servicing the World


of Construction

Professional Staff
No

Department

Number of personnels

Finance

5 persons

Procurement

4 persons

Logistic

Tax & Accounting

Engineer & Site Engineer

13 persons

Human Resources

10 persons

Technical Administration

10 persons

QC/QA & HSE

20 persons

Surveyor

10 persons

Electric & Mechanic

45 persons

10

Servicing the World


of Construction

10 persons
7 persons

List of Equipment
No
1

No

54 units

PC 200-7
2Komatsu
Bulldozer

143 HP 38 units 6 unit

PCTruck
350LC-6
3Komatsu
Dump

232 HP 148 units 1 unit

300-8
4Komatsu
HeavyPC
Duty
Dumper

260 HP 18 units 3 unit

ZX Grader
330
5Hitachi
Motor

247 HP 8 units 5 unit

Bulldozer
6
Compactor

14 units

D31P-18
7Komatsu
Crawler
Crane

D85A-21
8Komatsu
Self Loader

225 HP 2 units 1 unit

9Komatsu
WheelD85ESS-2
Loader

200 HP 4 units 9 unit

Komatsu
D31P-20E
10
Rough
Terrain Crane

71 HP

71 HP

Dump
11 Truck
Vibro Hammer

8 units 1 unit

4 units 1 unit
6 units

HinoFuel
FM 260
JD
12
Truck

26 ton

4 units 2 unit

FAWCrawler
CA3256P2K15
13
Rock Drill

20 ton

4 units 20 unit

FAWCompressor
HD 360 DT
14

30 ton

2 units 2 unit

Mitsubishi
PS 125
15
Rock Breaker

10 ton

4 units 8 unit

Mitsubishi
16
Trado PS 120

10 ton

4 units 1 unit

HD17
Truck
Tug Boat 450HP

CapacityTotal Total

1
Excavator
Excavator

Type Type

Servicing
Servicing
the
the
World
World
of of
Construction
Construction

Komatsu
DTBoat
HD 605-5
18
Anchor
340 HP

2 units
739 HP 2 units 4 unit

Motor Grader

Komatsu GD 511 A

135,4 HP

2 unit

Mitsubishi MG 330

130 HP

1 unit

List of Equipment
No
6

No

Hamm 3410
2VibroBulldozer

134 HP 38 units 3 unit

SV 515
TF-H
3Sakai
Dump
Truck

115 HP 148 units 2 unit

SV 515
D-H
4Sakai
Heavy
Duty
Dumper

121 HP 18 units 3 unit

BWGrader
211D-40
5Bomag
Motor

132 HP 8 units 3 unit

Crane
6

Compactor

14 units

QUY55
7XCMG
Crawler
Crane

55 ton

8 units 1 unit

QUY50-76
8Zoomlion
Self Loader

50 ton

2 units 1 unit

9Zoomlion
WheelQUY50-50
Loader

50 ton

4 units 1 unit

Crawler
10 Tractor
Rough Terrain Crane
JohnVibro
DeereHammer
760 J
11

4 units
157 HP 6 units 3 unit

Fuel
12Tank
Fuel Truck
HinoCrawler
FM 260Rock
JD Drill
13

4 units
26 ton

Water
14 Tank
Compressor

11

54 units

10

CapacityTotal Total

1
Excavator
Compactor

Type Type

Servicing
Servicing
the
the
World
World
of of
Construction
Construction

Nissan
CWBreaker
520 H
15
Rock

2 units
7 ton

Wheel
16 Loader
Trado

Furukawa
230-1
17
Tug Boat
450HP
18

Anchor Boat 340 HP

4 units 1 unit
4 units 1 unit
4 units

2,5 m3

2 units 1 unit
2 units

List of Equipment
No

No
1

12

13

Type Type

Servicing
Servicing
the
the
World
World
of of
Construction
Construction

CapacityTotal Total

Excavator

54 units

Vibro2Hammer
Bulldozer

38 units

Vibro
Hammer
FAV 600
3
Dump
Truck

Tomen
VM2-40000E
4
Heavy
Duty Dumper

Nisha
SVS 80
5
Motor
Grader

Mixer6

148 units 1 unit


18 units 1 unit
8 units 1 unit

Compactor

14 units

Mitsubishi
F415
J
7
Crawler
Crane

5 m3

8 units 1 unit

FAW
FW
R
8
Self 86
Loader

5 m3

2 units 1 unit

Wheel Loader

4 units

10

Rough Terrain Crane

4 units

11

Vibro Hammer

6 units

12

Fuel Truck

4 units

13

Crawler Rock Drill

4 units

14

Compressor

2 units

15

Rock Breaker

4 units

16

Trado

4 units

17

Tug Boat 450HP

2 units

18

Anchor Boat 340 HP

2 units

Reference List of

Servicing
Servicing
thethe
World
World
of Construction
of Construction

Major Project
No
1

Contract
No
Description
ofSLOPE
Works
Location
Commissioned
1
REINFORCEMENT
ON
AT RIGHT
North
Sumatera
Metropolitan Medan
Description
ofWORKS
Works
Location
Commissioned
Urban Development Project
SIDE OF DELI RIVER IN MEDAN, NORTH SUValue

MATERA
No. : HK.02.07.06.07/01
REINFORCEMENT
North Sumatera
Metropolitan Medan
Rp 3,497,432,400
Dated WORKS
: AugustON
23,SLOPE
2002 AT RIGHT
Urban Development Project
SIDE OF DELI RIVER IN MEDAN, NORTH SUMATERA
No. : HK.02.07.06.07/01
PT. SAC Nusantara
2
BADERA RIVER IMPROVEMENT AND FLOOD CONNorth Sumatera
Date : AugustTROL
23, 2002
WORKS
No. : 02/SPBP/SACNA/FC-104/XII/03
Dated : December 22, 2003
PT. SAC Nusantara
BADERA RIVER IMPROVEMENT
North Sumatera
Rp 9,596,367,000
AND FLOOD CONTROL WORKS
No. : 02/SPBP/SACNA/FC-104/XII/03
PT. Siak Prima Sakti
3
EARTHWORKS, CUT & FILL WORKS AT PKS PT. SIAK
Buatan,
Date : December
22,SAKTI
2003 IN DESA PANGKALAN PISANG, KEC.
PRIMA
Riau
KOTO GASIT, KAB. SIAK INDRAPURA, RIAU
No. : 001/KONTRAK/SPS/MA/DESEMBER 2004
PT. Siak Prima Sakti
EARTHWORKS,
CUT
& FILL WORKS
Buatan,
Rp 3,448,181,000
Dated
: December,
2004
AT PKS PT. SIAK PRIMA SAKTI IN DESA PANGKALAN
Riau
PISANG, KEC. KOTO GASIT, KAB. SIAK INDRAPURA,
RIAU 4
NAD Resources Irrigate
BEACH PRESERVATION WORKS IN UJUNG KARANG
Sabang,
No. : 001/KONTRAK/SPS/MA/DESEMBER
2004
Public Work Dept BRR
LENGTH 550 METERS IN SABANG
Nanggroe Aceh
Date : December,
NAD Nias
No. 2004
: 11/KPTS/BRR PBPP/2005
Darrusalam
Dated : October 19, 2005
NAD Resources Irrigate
BEACH PRESERVATION WORKS IN UJUNG KARANG
Sabang,
Rp
Public Work Dept BRR
LENGTH
550
METERS
IN
SABANG
Nanggroe
Aceh
PT. Sarana
5
CONSTRUCTION OF TRESTLE, SECONDARY JETTY,
Kuala Tanjung,
NAD Nias Industama
No. : 11/KPTS/BRR
DarrusalamNorth Sumatera
TANKERPBPP/2005
BARGE JETTY AND PIPE RACK IN KUALA
Date : October
19, 2005
Perkasa
TANJUNG

2,333,059,000

No. B.01.11/2.2/1205 (Joint Operation)


5

PT. Sarana
CONSTRUCTION OF TRESTLE, SECONDARY JETTY,
Kuala Tanjung,
Rp 54,500,000,000
Industama
TANKER
BARGE
JETTY
AND
PIPE
RACK
IN
KUALA
North
Sumatera
PT. Pembangunan
6
EARTHWORKS OF SUMPUR MAIN CANAL AND TAMPanti Rao,
PerkasaPerumahan Divisi
TANJUNG BANGAN SECONDARY CANAL AT PANTI RAO IRRIWest Sumatra
No. : B.01.11/2.2/1205
(Joint
Operation)
Operasi I (Pesero)
GATION PROJECT
No. : 06/SPS/RAO/DVO-I/III/2007
Dated : March 09, 2007
PT. Pembangunan
EARTHWORKS OF SUMPUR MAIN CANAL
Panti Rao,
Rp 4,457,188,836
Perumahan Divisi
AND TAMBANGAN SECONDARY CANAL
West Sumatra
Operasi I (Pesero)
AT PANTI
IRRIGATION
PROJECT
PT. Manunggal
7 RAO
SITE
LEVELLING
& GRADING WORK FOR 2x135 MW
Kuala Tanjung,
No. : 06/SPS/RAO/DVO-I/III/2007
Engineering
IPP COAL FIRED POWER PLANT IN KUALA TANJUNG
North Sumatera
Date : March09,
2007 SUMATERA
NORTH
No. : ME-C001/KLT-1007 (Joint Operation)
Dated : October 26, 2007
PT. Manunggal
SITE LEVELLING & GRADING WORK FOR 2x135 MW
Kuala Tanjung,
Rp 54,300,000,000
Engineering
IPP COAL FIRED POWER PLANT IN KUALA TANJUNG
North Sumatera
NORTH
PT. Saipem Indonesia
SAIPEM KARIMUN YARD CONSTRUCTION PROJECT
8 SUMATERA
Karimun,
No. : ME-C001/KLT-1007
Operation)
IN KARIMUN (Joint
ISLAND
INDONESIA
Kepulauan Riau
Date :: October
26,: 2007
Date
February 20, 2008
Contract Revision : Work Contract Variation014
No. : 338649
PT. Saipem Indonesia
SAIPEM KARIMUN
CONSTRUCTION
Karimun,
USD 24,984,303.74
Dated YARD
: December
09, 2010 PROJECT
IN KARIMUN ISLAND INDONESIA
Kepulauan Riau
No. : 338649
Date : February
20, 2008
NINDYA SEJATI JO
CONSTRUCTION
OF LOADING HARBOUR
9
Sabang,
Contract Revision
: Work Contract Variation014
IN SABANG
Nanggroe Aceh
Date : December
2010
No. 09,
: 01/NS-SBG/SPK/XI/2007
Darrusalam
Dated : November 05, 2007

NINDYA SEJATI JO
CONSTRUCTION OF LOADING HARBOUR
Sabang,
Rp
423,500,000
IN SABANG
Nanggroe
Aceh
NINDYA
SEJATI
JO
CONSTRUCTION OF LOADING HARBOUR IN SA10
Sabang,
No. : 01/NS-SBG/SPK/XI/2007
DarrusalamNanggroe Aceh
BANG
Date: November
05,
2007
No. : 02/NS-SBG/SPK/XI/2007
Darrusalam
Dated : November 05, 2007

10

CONSTRUCTION OF LOADING HARBOUR


IN SABANG
No. : 02/NS-SBG/SPK/XI/2007
Date: November 05, 2007

Sabang,
Nanggroe Aceh
Darrusalam

NINDYA SEJATI JO

Rp

3,540,400,000

Reference List of
Major Project
No
11

12

13

No Description
Description
of Worksof Works
11
CONSTRUCTION OF LOADING HARBOUR IN
BANG
CONSTRUCTION
OF LOADING HARBOUR IN SABANG
No. : 01/NS-SBG/SPK/IV/2008
No. : 01/NS-SBG/SPK/IV/2008
Dated
Date: April 28,
2008: April 28, 2008
12
CONSTRUCTION OF LOADING HARBOUR
IN SABANG
CONSTRUCTION
OF LOADING HARBOUR IN SABANG
No. : 02/NS-SBG/SPK/IV/2008
No. : 02/NS-SBG/SPK/IV/2008
Dated
Date: April 28,
2008: April 28, 2008
13
CONSTRUCTION OF COAL HAULING ROAD
No.4OF
Part
3A HAULING ROAD
CONSTRUCTION
COAL
No.4 Part 3ANo. : 059-2009-TCM
Dated : December 01. 2009
No. : 059-2009-TCM

Servicing
Servicing
the
the
World
World
ofof
Construction
Construction

Contract
Commissioned
LocationLocation
Commissioned
Value
SA-

Sabang,
NINDYA SEJATI JO
Sabang, Nanggroe Aceh
NINDYA SEJATI JO
Rp 8,426,132,000
Nanggroe AcehDarrusalam
Darrusalam
Sabang,
NINDYA SEJATI JO
Nanggroe Aceh
Sabang, Darrusalam
NINDYA SEJATI JO
Rp 5,070,151,500
Nanggroe Aceh
Darrusalam
Melak,
PT. TRUBAINDO COAL
East Kalimantan
MINING
A subsidiary
of
ITM 4,735,453.66
Melak,
PT. TRUBAINDO
COAL
USD

East Kalimantan

MINING
A subsidiary of ITM

Date: December 01. 2009


PT. BHARINTO EKATAMA
CONSTRUCTION OF STOCKPILE AND ROM STOCK
Melak,
A subsidiary of ITM
No.
:
001_BRT/LGL/10
East
Kalimantan
PT. BHARINTO EKATAMA
CONSTRUCTION OF STOCKPILE AND ROM STOCK
Melak,
USD
302,654.07
Dated : January 29, 2010
A subsidiary of ITM
No. : 001_BRT/LGL/10
East Kalimantan
Date : January 29, 2010

14

14

15

15

CONSTRUCTION OF PERAK BRIDGE


No. OF
: 045-2010-TCM
CONSTRUCTION
PERAK BRIDGE
Dated : February 01, 2010
No. : 045-2010-TCM
Date : February 01, 2010

16

17

18

19

20

21

22

PT. TRUBAINDO COAL


Melak,
MINING
East
Kalimantan
PT.
TRUBAINDO
COAL
Melak,
USD
A subsidiary of
ITM 3,118,757.57
MINING
East Kalimantan
A subsidiary of ITM

PT. SUKAJADI SAWIT


16
LAND RECOVERY AT PT. SUKAJADI SAWIT MEKAR
Sampit,
MEKAR
PROJECT
Central
PT. SUKAJADI SAWIT
LAND RECOVERY
AT PT. SUKAJADI SAWIT MEKAR
Sampit,
Rp 17,000,000,000
No
:
006/SSM-SMPT/PEK.PNMBNAN/VII/2010
Kalimantan
MEKAR
PROJECT
Central
Dated : July 13, 2010
No. : 006/SSM-SMPT/PEK.PNMBNAN/VII/2010
Kalimantan
Date : July 13, 2010
PT. SUKAJADI SAWIT
17
SHORE PROTECTION AT PT. SUKAJADI SAWIT
Sampit,
MEKAR
MEKAR PROJECT
Central
PT. SUKAJADI SAWIT
SHORE PROTECTION
AT PT. SUKAJADI SAWIT
Sampit,
Rp 1,500,000,000
No.
:
007/SSM-SMPT/PEK.JLN.CONBLOCK/
Kalimantan
MEKAR
MEKAR PROJECT
Central
XII/2010
No. : 007/SSM-SMPT/PEK.SHRE.PRTCTN/IX/2010
Kalimantan
Dated15,
: September
15, 2010
Date : September
2010
PT. SUKAJADI SAWIT
18
CONBLOCK
WORKS
AT PT.SAWIT
SUKAJADI
SAWIT
Sampit,
PT. SUKAJADI SAWIT
CONBLOCK
WORKS
AT PT.
SUKAJADI
MEKAR
Sampit,
MEKARRp 4,842,200,000
MEKAR
PROJECT
Central
MEKAR
PROJECT
Central
No : 008/SSM-SMPT/PEK.JLN.CONBLOCK/ Kalimantan Kalimantan
No. : 008/SSM-SMPT/PEK.JLN.CONBLOCK/
IX/2010
XII/2010
Dated
December 1, 2010
Date : December
1, :2010
PT. SUKAJADI SAWIT
TRENCH
WORKS
& FENCE FOUNDATION
AT PT. Sampit,
19 WORKS
Sampit,
PT. SUKAJADI SAWIT
TRENCH
& FENCE
FOUNDATION
AT PT.
MEKARRp 6,674,800,000
SUKAJADI
SAWIT
MEKAR PROJECT
Central
MEKAR
SUKAJADI SAWIT
MEKAR
PROJECT
Central
No. : 009/SSM-SMPT/PEK.PRT&POND.PGR/ Kalimantan Kalimantan
No. : 009/SSM-SMPT/PEK.PRT&POND.PGR/
XII/2010
XII/2010
Dated
December 1, 2010
Date : December
1, :2010
PT. Saipem Indonesia
FABRICATION
OF PROTECTION
CONCRETE PROTECTION
PRE- Batam,
20
Batam,
PT. Saipem Indonesia
FABRICATION
OF CONCRETE
PREUSD
MIER
OIL
GAJAH
BARU
PROJECT
Pekanbaru
MIER OIL GAJAH BARU PROJECT
Pekanbaru
No. : 572050
No. : 572050
Dated
: February 2, 2011
Date : February
2, 2011
LAND MATURATION
AND SOIL INVESTIGATION
AT
LAND 21
MATURATION
AND SOIL INVESTIGATION
AT
Bekasi,
PT. MUSIM
MAS FUJI PROJECT
PT. MUSIM MAS
FUJI PROJECT
West Java
No. : 004/III/MMF-MA/GA/11
No. : 004/III/MMF-MA/GA/11
: March 10, 2011
Date : MarchDated
10, 2011

13,000

PT. MUSIM MAS FUJI


Bekasi,
PT. MUSIM MAS FUJI
Rp.
623,900,000
West Java

Saipem Asia
Omati,
PNG Branch
OMATI
LANDFALL
OPERATION
FOR
PNG
LNG
EPC2
22
Papua
New
Saipem
Asia
OMATI LANDFALL OPERATION FOR PNG LNG EPC2
Omati,
USD
OFFSHORE
PIPELINE PROJECT
Guinea PNG Branch
OFFSHORE PIPELINE
PROJECT
Papua New
No.
:
602357
No. : 602357
Guinea
Dated
: June 24, 2011
Date : June 24,
2011

2,545,650

Reference List of

Servicing
Servicingthe
theWorld
World
ofofConstruction
Construction

Major Project
No
23

No

Contract
Description of Works
Location
Commissioned
Description of Works
Location
Commissioned
Value

23
LOAD AND HAUL OF BLASTED ROCKS IN
LOAD AND HAUL
OF BLASTED
ROCKS
P. KARIMUN
BESAR
, RIAUIN
P. KARIMUN Dated
BESAR: June
, RIAU30, 2011
Date : June 30, 2011

Karimun,
PT. Pacific Granitama
Karimun, Kepulauan
PT.Riau
Pacific Granitama
USD
934,742.57
Kepulauan Riau

24

CUT &24
FILL DIGESTER
WORKS
AT PT.
Sebabi,
PT. SUKAJADIPT.
SAWIT
Rp.
2,879,231,360
CUT & FILLPOND
DIGESTER
POND
WORKS AT PT.
Sebabi,
SUKAJADI
SAWIT
SUKAJADI SAWIT
MEKAR
PROJECT
Central
MEKAR
SUKAJADI
SAWIT
MEKAR PROJECT
Central
MEKAR
No. : 001/PKS
Kalimantan Kalimantan
No.SSM1-BIO/VII/2011
: 001/PKS SSM1-BIO/VII/2011
Date : July 7,Dated
2011 : July 7, 2011

25

SAIPEM
YARD
CONSTRUCTION
PROJECT
Karimun,
PT. Saipem Indonesia
USD
1,850,000
25KARIMUN
SAIPEM
KARIMUN
YARD CONSTRUCTION
PROJECT
Karimun,
PT. Saipem Indonesia
Karimun Camp
Extension
Kepulauan Riau
Karimun
Camp Extension
Kepulauan Riau
No. : 626437
No. : 626437
Date : July 25,
2011: July 25, 2011
Dated

26

EARTHWORKS
(CUT & FILL)(CUT
MILL&AREA
PMKS
PT. IN PMKS
Bengalon,
PT.Kutim,
Tunas Harapan
Rp. 2.039.000.000
26
EARTHWORKS
FILL)IN
MILL
AREA
PT. Kutim,
Bengalon,
PT. Baru
Tunas Harapan
KEMILAU INDAH
NUSANTARA
East Kalimantan
KEMILAU
INDAH NUSANTARA
East Kalimantan
Baru
No : 051/THB-SPB/SUB/XII/11
No. : 051/THB-SPB/SUB/XII/11
Date : December
19,: December
2011
Dated
19, 2011

27

HAULING
& INFRASTRUCTURE
PT. GUNUNGPT. GUNUNG
Melak,
PT. Gunung Bara
Utama Bara
Rp. Utama
164.345.274.951
27 ROAD
HAULING
ROAD & INFRASTRUCTURE
Melak,
PT. Gunung
BARA UTAMABARA UTAMA
East Kalimantan
East Kalimantan
No. : GBU-C004/HR-0112
No. : GBU-C004/HR-0112
Date : January
26, 2012
Dated
: January 26, 2012

28

CUT &28
FILL DIGESTER
WORKS
AT PT.
Sebabi,
PT. SUKAJADIPT.
SAWIT
Rp.
2.201.697.750
CUT & FILLPOND
DIGESTER
POND
WORKS AT PT.
Sebabi,
SUKAJADI
SAWIT
SUKAJADI SAWIT
MEKAR
PROJECT
Central
MEKAR
SUKAJADI
SAWIT
MEKAR PROJECT
Central
MEKAR
No. : 001/PKS
Kalimantan Kalimantan
No.SSM2-BIO/III/2012
: 001/PKS SSM2-BIO/III/2012
Date : MarchDated
20, 2012
: March 20, 2012

39

EARTHWORKS
(CUT & FILL)(CUT
EFFLUENT
IN
Kurun,KualaPT.
Tunas Harapan
Rp. 1.421.152.000
29
EARTHWORKS
& FILL)POND
EFFLUENT
POND Kuala
IN
Kurun,
PT. Baru
Tunas Harapan
PMKS PT. KALIMAN
RIAKALIMAN
SEJAHTERA
Central
PMKS PT.
RIA SEJAHTERA
Central
Baru
No : 010A/THB-SPB/SUB/III/12
Kalimantan Kalimantan
No. : 010A/THB-SPB/SUB/III/12
Date : MarchDated
05, 2012
: March 05, 2012

30

PT. Tunas Harapan Baru


EARTHWORKS
(CUT & FILL)(CUT
EFFLUENT
IN
Bengalon,
Kutim,
Rp.
3.565.685.000
30
EARTHWORKS
& FILL)POND
EFFLUENT
POND
IN
Bengalon, Kutim,
PT. Tunas Harapan
PMKS PT. KEMILAU
INDAH
NUSANTARA
East Kalimantan
PMKS PT.
KEMILAU
INDAH NUSANTARA
East Kalimantan
Baru
No : 012/THB-SPB/SUB/III/12
No. : 012/THB-SPB/III/12
Date : MarchDated
20, 2012
: March 20, 2012

31

EARTHWORKS
(POND EMBANKMENT)
IN PMKS
Kuala Kurun,KualaPT.
Tunas Harapan
Rp.
33.959.000
31
EARTHWORKS
(POND EMBANKMENT)
IN PMKS
Kurun,
PT. Baru
Tunas Harapan
KALIMAN RIAKALIMAN
SEJAHTERA
Central
RIA SEJAHTERA
Central
Baru
No : 028B/THB-SPB/SUB/V/12
Kalimantan Kalimantan
No. : 028B/THB-SPB/SUB/V/12
Date : May 2012
Dated : May 2012

32

EARTHWORKS
(CUT & FILL)(CUT
EFFLUENT
IN
Bengalon,
Kutim,
PT.Kutim,
Tunas Harapan
Rp.
720.900.000
32
EARTHWORKS
& FILL)POND
EFFLUENT
POND
IN
Bengalon,
PT. Baru
Tunas Harapan
PMKS PT. KEMILAU
INDAH
NUSANTARA
East Kalimantan
PMKS PT.
KEMILAU
INDAH NUSANTARA
East Kalimantan
Baru
No : 030/THB-SPB/SUB/V/12
No. : 030/THB-SPB/SUB/V/12
Date : June 01,
2012
Dated
: June 01, 2012

33

RESERVOIR
WORKS IN PMKS
PT. IN
KEMILAU
INDAH
Bengalon, Kutim,
PT.Kutim,
Tunas Harapan
Rp.
3.406.913.000
33
RESERVOIR
WORKS
PMKS PT.
KEMILAU INDAH
Bengalon,
PT. Baru
Tunas Harapan
NUSANTARA NUSANTARA
East Kalimantan
East Kalimantan
Baru
No : 049/THB-SPB/SUB/VIII/12
No. : 049/THB-SPB/SUB/VIII/12
Date : AugustDated
08, 2012
: August 08, 2012

Reference List of

Servicing
Servicingthe
theWorld
World
ofofConstruction
Construction

Major Project
No
34

35

36

37

38

39

40

Contract
No Description
Description
Commissioned
of Worksof Works LocationLocation
Commissioned
Value
34
EARTHWORKS ACCESS ROAD & WOODEN PILE
Bengalon, Kutim,
PT. Tunas Harapan
EARTHWORKS
& WOODEN
PILE
Bengalon, Kutim,
PT. Tunas Harapan Baru
114.722.000
IN ACCESS
PKMS PTROAD
KEMILAU
INDAH NUSANTARA
East Kalimantan
Baru Rp
IN PKMS PT KEMILAU
INDAH NUSANTARA
East Kalimantan
No. : 060D/THB-SPB/THB/IX/2012
No.060D/THB-SPB/THB/IX/2012
Dated : September 15,2012
Date : September 15,2012
35
LAND CLEARING AND FILLING WORKS AT SIDE B
Bagendang,
PT Sukajadi Sawit
LAND CLEARING
FILLING
WORKS
AT SIDE
B
Bagendang,Sampit, Central
PT Sukajadi Sawit MekarRp
3.025.000.000
AREAAND
AT PT
SUKAJADI
SAWIT
MEKAR
AREA AT PT SUKAJADI
SAWIT MEKAR
Sampit
Mekar
No. : 001/SSM-SMPT-ST.B/PRJ/2013
Kalimantan
No.001/SSM-SMPT-ST.B/PRJ/2013
Central
Dated : January 21, 2013
Date : January 21, 2013
Kalimantan
36
PAVING BLOCK AND KERB INSTALLATION
PAVING BLOCK
AND KERB
PROJECT
AT PTINSTALLATION
SUKAJADI SAWIT MEKAR
PROJECT ATNo.
PT SUKAJADI
SAWIT MEKAR
: 003/SSM-SMPT/PRJ/I/2013
No.003/SSM-SMPT/PRJ/I/2013
Dated : January 21, 2013
Date : January 21, 2013

Bagendang,
PT Sukajadi Sawit
Bagendang Sampit,
,
PT Sukajadi Sawit MekarRp.
295.900.000
Central
Sampit,
Mekar
Kalimantan
Central
Kalimantan

37
LAND CLEARING, FILLING, GEOTEXTILE AND BASE
Bagendang,
PT Sukajadi Sawit
LAND CLEARING,
FILLING,
GEOTEXTILE
AND BASE
Bagendang Sampit,
,
PT Sukajadi Sawit MekarRp. 3.729.000.000
COURSE
AT SIDE
B AREA PROJECT
Central
COURSE AT SIDE
AREA PROJECT
Sampit,
Mekar
AT PTBSUKAJADI
SAWIT MEKAR
Kalimantan
AT PT SUKAJADI
MEKAR
Central
No. SAWIT
: 003/SSM-SMPT-ST.B/PRJ/I/2013
No.003/SSM-SMPT-ST.B/PRJ/I/2013
Kalimantan
Dated : January 21, 2013
Date : January 21, 2013
Bengalon, Kutim,
PT. Tunas Harapan
38
SLOPING ACCESS ROAD AND AREA WATER
East Kalimantan
Baru
SLOPING ACCESS
ROAD AND
AREA
WATER
Bengalon, Kutim,
PT. Tunas Harapan Baru
Rp.
135.034.000
TREATMENT
PLANT
WORKS
AT
TREATMENTPKMS
PLANTPT
WORKS
East Kalimantan
TUNASAT
HARAPAN BARU
PKMS PT KEMILAU
INDAH NUSANTARA
No. : 010/THB-SPB/SUB/II/2013
No.010/THB-SPB/SUB/II/2013
Dated : February 07, 2013
Date : February 07, 2013
39
DRAINAGE, FENCING, GEOTEXTILE, WOODEN PILE
Bagendang,
PT Sukajadi Sawit
DRAINAGE, FENCING,
WOODEN
,
PT Sukajadi Sawit MekarRp.
1.791.900.000
AND BASEGEOTEXTILE,
COURSE AT AREA
SIDEPILE
B PROJECTBagendang
AT
Sampit,
Central
AND BASE COURSE
AREA SIDE
B PROJECT
Sampit,
Mekar
PKMS PTAT
SUKAJADI
SAWIT
MEKAR AT
Kalimantan
PKMS PT SUKAJADI
SAWIT MEKAR
Central
No. : 005/SSM-SMPT-ST.B/PRJ/IV/2013
No.005/SSM-SMPT-ST.B/PRJ/IV/2013
Kalimantan
Dated : April 02, 2013
Date : April 02, 2013
40
Cut & Fill Digester Pond Biogas Plant
ROAD PREPARATION
WORK ATGIN1-BIO/IV/2014
BIOGAS PLANT AREA
No.
: 001/PKS
AND PREPARATION
HDPE
PIPELINE ON
Dated :OF
April
08, 2014
DIGESTER POND AT PKMS PT SUKAJADI SAWIT
MEKAR
No. 41
: 006/PKS-SSM1
Earthworks BIO/V/2013/
Dated : May No.
01, 2013
: 048/THB-SPB/SUB/VI/2014
Dated : June 17, 2014

41

CONCRETE BEAM DEVELOPMENT WORK AT PKMS


PT SUKAJADI SAWIT MEKAR
No.
: 009/SSM-SMPT/PRJ/V/2013
Dated : May 20, 2013

42

CUT & FILL ON EMBANKMENT POND AT DIGESTER


POND AREA ON PKMS PT . SUKAJADI SAWIT MEKAR
No.
: 008/PKS SSM2-BIO/VI.2013
Dated : June 18, 2013

43

CUT & FILL DIGESTER POND BIOGAS PLANT ON


PKMS PT. GUNTUNG IDAMANUSA
No.
: 001/PKS GIN1-BIO/IV/2014
Dated : April 08, 2014

44

EARTHWORKS AT PKMS PT ADITYA AGRINDO


No
: 048/THB-SPB/VI/2014
Dated : June 17, 2014

Sampit
Central
Kalimantan

Indragiri Hilir,
PT GIN
Rp.
Riau PT Sukajadi Sawit
Mekar

40,000,000

PKMS
PT Tunas Harapan Baru
PT Aditya Agro
Indo
Ketapang,
Sampit, West Kalimanta
PT Sukajadi Sawit
Rp.
62,700,000
Central
Mekar
Kalimantan

Sampit,
Central
Kalimantan

PT Sukajadi Sawit
Mekar

Rp.

21,420,000

Indragiri Hilir
Riau

PT Guntung Idamanusa

Rp.

2,083,236,295

Ketapang
West Kalimantan

PT Tunas Harapan Baru

Rp.

9,228,728,000

Reference List of

Servicing
Servicingthe
theWorld
World
ofofConstruction
Construction

Major Project
No
45

46

47

Contract
No Description
Description
Commissioned
of Worksof Works LocationLocation
Commissioned
Value
34
EARTHWORKS ACCESS ROAD & WOODEN PILE
Bengalon, Kutim,
PT. Tunas Harapan
PILING INSTALLATION
WORK
(DRIVEN
PILES)
Karimun,East Kalimantan
PT Saipem IndonesiaBaru USD
IN PKMS PT
KEMILAU
INDAH
NUSANTARA
No
: 949498
Kepulauan Riau
No. : 060D/THB-SPB/THB/IX/2012
Dated : July 01,
2014
Dated
: September 15,2012

140,000

CONCRETE WORKS FOR YARD DEVELOPMENT


Karimun,
PT Saipem Indonesia
USD
1,485,000
PROJECT
Kepulauan
RiauBagendang,
35
LAND CLEARING AND FILLING WORKS AT SIDE
B
PT Sukajadi Sawit
No
: 956103
AREA AT PT SUKAJADI SAWIT MEKAR
Sampit, Central
Mekar
Dated : July No.
17, 2014
: 001/SSM-SMPT-ST.B/PRJ/2013
Kalimantan
Dated : January 21, 2013
CUT & FILL DIGESTER POND BIOGAS PLANT
Desa Rambah,
PT Indomakmur Sawit
Rp
1,300,000,000
No
: 001/PKS ISB-BIO/IX/2014
Kec. Rambah Hilir,
Berjaya
Dated 36
: September
15,BLOCK
2014 AND KERB INSTALLATION Kab Rokan Hulu
PAVING
Bagendang,
PT Sukajadi Sawit
PROJECT AT PT SUKAJADI SAWIT MEKAR
Sampit, Central
Mekar
No. : 003/SSM-SMPT/PRJ/I/2013
Kalimantan
Dated : January 21, 2013
37

LAND CLEARING, FILLING, GEOTEXTILE AND BASE


COURSE AT SIDE B AREA PROJECT
AT PT SUKAJADI SAWIT MEKAR
No. : 003/SSM-SMPT-ST.B/PRJ/I/2013
Dated : January 21, 2013

Bagendang,
Sampit, Central
Kalimantan

PT Sukajadi Sawit
Mekar

38

SLOPING ACCESS ROAD AND AREA WATER


TREATMENT PLANT WORKS AT
PKMS PT TUNAS HARAPAN BARU
No. : 010/THB-SPB/SUB/II/2013
Dated : February 07, 2013

Bengalon, Kutim,
East Kalimantan

PT. Tunas Harapan


Baru

39

DRAINAGE, FENCING, GEOTEXTILE, WOODEN PILE


AND BASE COURSE AT AREA SIDE B PROJECT AT
PKMS PT SUKAJADI SAWIT MEKAR
No. : 005/SSM-SMPT-ST.B/PRJ/IV/2013
Dated : April 02, 2013

Bagendang,
Sampit, Central
Kalimantan

PT Sukajadi Sawit
Mekar

40

Cut & Fill Digester Pond Biogas Plant


No.
: 001/PKS GIN1-BIO/IV/2014
Dated : April 08, 2014

Indragiri Hilir,
Riau

PT GIN

41

Earthworks
No.
: 048/THB-SPB/SUB/VI/2014
Dated : June 17, 2014

PKMS
PT Aditya Agro
Indo
Ketapang,
West Kalimanta

PT Tunas Harapan Baru

Quality Policy
The quality policy of PT Multi Adverindo is to deliver to clients design and
construction services which meet the contract and statutory requirements.
EMPLOYEES
All employees of PT Multi Adverindo are guided by our Quality Policy in all
decisions and actions on a daily basis. To realize the Quality Policy, all
employees shall set up detail execution plan in their working fields and control
as the personal objectives for clients satisfaction.
THE POLICY GOALS
Our goals are to provide the following:
A product, service, or solution which meets or exceeds our clients
expectations
Conscientious, responsive, and professional efforts
A highly trustworthy and ethical work environment that provides long-term
employment, development, and growth for all employees.
Continuous improvement in all that we do
THE POLICY GOALS
To accomplish this policy, PT Multi Adverindo establishes the following
objectives:
1. PT Multi Adverindo requires all employees to work to the clients requirements, which is in terms of attendance, workmanship quality and completion
timing.
2. Prepares and uses a Project Quality Management Plan to plan, do, check, act
both works and materials, for every ground engineering contract and
statutory requirements which PT Multi Adverindo undertakes.
3. Maintains core employee, selects and maintains qualified suppliers and subcontractors, and give effective instructions and feedback so that client
requirements are met effectively and efficiently.
To ensure a complete and responsible approach to the Project Management
Team, our system also includes separate policies for Health and Safety and
Environmental management.
PT Multi Adverindo will not compromise the integrity of our services in an
attempt to satisfy short-term goals. We are committed to long-term growth,
profitability and employment of our personnel and which encompasses an
attitude of Quality First.

Ir. Askaris Chioe


President Director

HEALTH, SAFETY,
AND ENVIRONMENTAL POLICY
PT Multi Adverindo is fully committed to provide and maintain a safe and healthy
working environment as the first consideration in all work and for employees.
The goal is to conduct all activities in the project in order to achieve:
1. Zero Lost Time Accident
2. Zero Occupational Illness
3. Zero effect to the Environment
PT Multi Adverindo committed to do continuous improvements in the HSE
practices and performances. All activities shall be fully compliant with all
applicable laws, statutory, and standards to be insured all the time.
PT Multi Adverindo Management shall take all reasonable steps in order to ensure
employees understand HSE policy through instruction, training, and information.
All staff is required to respect and implement the entire HSE requirement set by
employer and encouraged to report and consult with management on HSE issues.
PT Multi Adverindo is fully committed for implementing the project contract
requirement set by Client. No alcohol and drugs must be taken into any worksites.
PT Multi Adverindo recognizes this can be put at risk by those who misuse alcohol
or drugs to such an extent that it may affect their health, performance, conduct,
and safety, or the safety of others whilst in the worksites.
The application of this policy is direct responsibility of Project Management Team
(PMT), line management, all employees, and sub-contractors involved in its day-today application.
The top management of Multi Adverindo fully supports this policy and
encourages employees to take pro-active approach with respect to HSE
matters in executing their duties.

Ir. Askaris Chioe


President Director

Certificates

Servicing the World


of Construction

LEADERSHIP IN SAFETY
ENVIROMENT FRIENDLY OPERATION
QUALITY FIRST

Certificates

ISO 9001 : 2008

Servicing the World


of Construction

Certificates

ISO 14001 : 2004

Servicing the World


of Construction

Certificates

OHSAS 18001 : 2007

Servicing the World


of Construction

Documentation

Servicing the World


of Construction

Emergency and medical

response drill twice a month

Tool Box Talk everyday before


starting to work

Mass meeting every week

HSE DRILL & MEETING

Documentation

Servicing the World


of Construction

Training at home office

On site workshop

WORKSHOP & TRAINING

Documentation

Servicing the World


of Construction

Dredging by floating excavator or cutter suction

Gabion mass and armour rock protection

IRRIGATION AND DRAINAGE CONSTRUCTION


Flood Control Project in Badera River

Documentation

Special handling equipment

Servicing the World


of Construction

Special handling and method in marine environment

1400 mm diameter steel spun pipe with 38 m length without joint

OFFSHORE PILING AND MARINE CONSTRUCTION


Construction of Loading Harbour
in Sabang - Nanggroe Aceh Darrusalam

Documentation

Servicing the World


of Construction

Steel structure fabrication and erection

INDUSTRIAL BUILDING AND ITS FACILITIES


Erection Works at Bleaching Earth Factory

Documentation

Servicing the World


of Construction

Harvesting of chip wood for pulp and paper industry

FORESTRY AND PLANTATION SECTOR PROJECT


PT Riau Andalan Pulp and Paper Project
in Pangkalan Kerinci - Riau

Documentation

Servicing the World


of Construction

Planning and Construction of mining road, mine operation and transport

MINING AND HAULING OF BENTONITE


Bentonite Mining and Transporting
from Sipirok to Dumai Port - Riau

Documentation

Servicing the World


of Construction

Back filling according to specification

Excavation to design elevation

EARTHWORKS FOR PALM OIL INDUSTRY


Cut and Fill Works for Palm Oil Factory of PT Siak Prima

Documentation

Servicing the World


of Construction

Vertical well to collect consolidated air and water

Preloading with backfilling for

consolidation

Vertical drain Installation


and preloading

EARTHWORKS & SOIL IMPROVEMENT FOR POWER PLANT


Site Levelling and Grading Work
for 2 x 135 MW IPP Coal Fired Power Plant
in Kuala Tanjung - North Sumatera

Documentation

Servicing the World


of Construction

MARINE STRUCTURE CONSTRUCTION


Dumai Portland Reclamation Project
for PT Adei Plantation and Industry

Documentation

Servicing the World


of Construction

2.5 KM of bridge way and jetty

Supply of construction material at marine environment

OFFSHORE STRUCTURE CONSTRUCTION


Construction of Trestle, Secondary Jetty, Tangker Barge Jetty and Pipe Rack
in Kuala Tanjung - North Sumatera

Documentation

Servicing the World


of Construction

Managing handling of 2.5 KM


harbor construction material

Fabrication and erection of


2.5 KM steel girder

Logistic supply and handling in


offshore operation

OFFSHORE STRUCTURE CONSTRUCTION


Construction of Trestle, Secondary Jetty, Tangker Barge Jetty and Pipe Rack
in Kuala Tanjung - North Sumatera

Documentation

Servicing the World


of Construction

Fabrication and erection of small rig for oil and gas industry

OFFSHORE & UNDERWATER CONSTRUCTION


Laying Underwater Pipes Works
in Pangkalan Susu - North Sumatera

Documentation

Servicing the World


of Construction

Armour rock protection for tsunami relieve

MARINE STRUCTURE CONSTRUCTION


Revetment Project
in Uleule - Nanggroe Aceh Darrusalam

Documentation

Servicing the World


of Construction

Site preparation and mass construction of


housing for tsunami victims

MASS HOUSING CONSTRUCTION AND FACILITIES


Construction of houses in Leupung - Aceh Besar,
Nanggroe Aceh Darrusalam

Documentation

Servicing the World


of Construction

Long range excavation

Rock breaking

Excavation of swampy area

COAST LINE EARTHWORKS


SAIPEM Karimun Yard Construction
in Karimun, Kepulauan Riau

Documentation

Servicing the World


of Construction

Installation of geotextile

Backfill and compaction

EMBANKMENT WITH SOIL STABILIZATION


SAIPEM Karimun Yard Construction
in Karimun - Kepulauan Riau

Documentation

Servicing the World


of Construction

Large volume of earthwork operation

PRELOADING AND RECLAIMED MARINE SAND


SAIPEM Karimun Yard Construction
in Karimun - Kepulauan Riau

Documentation

Servicing the World


of Construction

Drilling and installation

engineed

..and blasting

ROCK DRILLING AND BLASTING WORKS


SAIPEM Karimun Yard Construction
in Karimun - Kepulauan Riau

Documentation

Servicing
Servicing
thethe
World
World
of Construction
of Construction

Over burden removal

Cut and fill earthwork

Land preparation for

crushing plan

Hauling of material

EARTHWORKS FOR COAL MINING INDUSTRY


EARTHWORKS
FOR COAL MINING INDUSTRY
Melak , East Kalimantan
Melak , East Kalimantan

Documentation

Servicing the World


of Construction

70 m prestressed concrete girder bridge

Borepile construction and testing

Engineered and
designed formwork

Launching by special equipment

ENGINEERING DESIGN, PROCUREMENT AND


CONSTRUCTION OF BRIDGE
Construction of Perak Bridge
West Kutai - East Kalimantan

Documentation

Servicing the World


of Construction

400 KM away to nearest town


without road / land access

Pipe tie in preparation at landfall area

REMOTE AREA OPERATION


PNG LNG EPC2 OFFSHORE PIPELINE PROJECT
Port Moresby-Papua New Guinea

Documentation

Servicing the World


of Construction

Load and Haul of Blasted Rocks


PT. Pacific Granitama
Pulau Karimun Besar, Riau

Documentation

Servicing the World


of Construction

Hauling Granite
PT. Kawasan Dinamika Harmonika
Pulau Karimun Besar, Riau

You might also like