[Speed Time Work] Two Men can nish a work, A is 3x more ecient
than B, B leaves before completion & variety of cases
1.
2.
Case: A started work, B joined after 4 days, how days work lasted?
3.
4.
5.
Raja
14
21
Kalmadi + Raja
Speed
Time
Distance
Raja
Time
14
21
Distance
42
42
Kalmadi + Raja
Speed
Raja
Kalmadi + Raja
Speed
Time
14
21
Distance
42
42
Raja
Kalmadi + Raja
Speed
3+2=5
Time
14
21
??
Distance
42
42
??
BUT we dont know for how many days did they work together?
So we cannot find how many seats they fixed. (STD formula requires two known values!)
So leave the (Kalmadi+Raja) column and move ahead.
Raja
Kalmadi + Raja
Raja alone
Speed
3+2=5
Time
14
21
??
Distance
42
42
??
So, how many seats did Raja fix in last three days?
Speed x time = distance
2 x 3 = 6. ; Because Rajas speed Is 2 and he works for 3 days.
Raja
Kalmadi + Raja
Raja alone
Speed
3+2=5
Time
14
21
??
Distance
42
42
36
Again STD formula to find how many days did they work together ?
Speed (Kalmadi + Raja) x Time = Distance
5 x Time = 36
Time = 36/5=7.2
Thus, our final table looks like this
Speed
Kalmadi
Raja
Kalmadi + Raja
Raja alone
3+2=5
Time
14
21
7.2
Distance
42
42
36
Case: A started work, B joined after 4 days, how days work lasted?
Abdul and Bhide can do a piece of work in 20 days and 12 days respectively. Abdul started
the work alone and then after 4 days Bhide joined him till the completion of the work.
How long did the work last?
Bhide
20
12
Speed
x Time
= distance
LCM (20,12)
in other words, which is the first number that comes in multiplication table of both 12 and 20?
Well, we know that
12 x 5 =60 and
20 x 3 = 60
Therefore, 60 is the least common multiple of (12, 20)
Assume total distance = 60
Update table
Abdul
Bhide
Time
20
12
distance
60
60
Speed
Bhide
Speed
x Time
20
12
= distance
60
60
in the exam, just do it in your head. you took LCM so youd already know that 203=60 and
125=60 so automatically 3:5 is the ratio
Bhide
Abdul started
Speed
Time
20
12
distance
60
60
34=12
Bhide
Abdul started
Abdul + Bhide
Speed
3+5=8
Time
20
12
??
distance
60
60
34=12
48
Bhide
Abdul started
Abdul + Bhide
Speed
3+5=8
Time
20
12
distance
60
60
34=12
48
Abdul
Bhide
Abdul starts
Abdul+Bhide
Speed
(6+5)=11
Time
10
12
6 days
??
Distance
60
36
(60-36)=24
In the first 6 days, Abdul finished 6 x 6 = 36 kilometers. Hence remaining work= 60 minus 36= 24
This 24 kilometers were done by Abdul+Bhide together. (last column)
Run the STD on last column
Speed x time = distance
11 x Time =24
Time =24/11= approx. 2.18
Final answer: Bhide worked for 2.18 days.
Bhide
only Bhide
Speed
3+2=5
xTime
15
10
??
Distance
30
??
15
Speed
3b
Time
(t-60)
distance
Speed
3b
Time
90-60=30
90
distance
In Bs column apply STD formula so you get
b x 90 =90b that is our total distance.
When A+B work together, theyve to cover the same distance (90b)
A
A+B
Speed
3b
3b+b=4b
Time
90-60=30
90
??
b x 90=90b
90b
distance
Apply STD in last column
4b x time =90b
Mrunal recommends
maths-medium-low-priority-topics-sample-questions-free-studymaterial-part3-3.html)
[Studyplan] CSAT Aptitude Paper 2: Comprehension & Reasoning, analysis,
previous papers, free studymaterial, cutoffs (part 1 of 3)
(http://mrunal.org/2014/06/studyplan-csat-aptitude-paper-2-comprehensionreasoning-analysis-previous-papers-free-studymaterial-cutoffs-part-1-2.html)
[Reasoning] Calendar Questions: Finding day or date, concepts, shortcuts
explained (http://mrunal.org/2013/08/reasoning-calendar-questions-findingday-or-date-concepts-shortcuts-explained.html)
[Trigonometry] Finding Minimum Maximum Values for SSC CGL Made Easy
without differentiation (http://mrunal.org/2013/07/trigonometry-findingminimum-maximum-values-for-ssc-cgl-made-easy-withoutdifferentiation.html)
Print | PDF (need Chrome) (http://mrunal.org/2012/11/speed-time-work-twomen-can-finish-work-3x-efficient-b-b-leaves-completion-varietycases.html/print/)
Get notified whenever I post new article!
(http://feedburner.google.com/fb/a/mailverify?uri=CivilServiceExam)
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=204895#RESPOND)
SHOURABH JOSHI
Thank you so much for ur constructive support and all ur efforts
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=204896#RESPOND)
ashish
I think answer to 1st case,1 subquestion I.e Kalamadi left the work 3days
before should be..12.9 days.
Check and correct me , if I m wrong
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-BLEAVES-COMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=204952#RESPOND)
Akhil
@Ashish, you have mis-read the question, like I did in first attempt
and ended up with the same answer. You must have calculated
total time as 42/5 and substracted 3 from that. There is the
problem, the time is given considering he already left 3 days
before. So equation would be like this,
[(t-3)/14]+[t/21] = 1
t = 10.2
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=204920#RESPOND)
Basist
the answer (10.2) is correct.
If raja goes to jail, the answer would be 9.6 days
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=204951#RESPOND)
Rajesh
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=209552#RESPOND)
Arun
A does half as much work as B in three fourth of the time. IF together
they take 18 days to complete the work, how much time shall B take to
do it?
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=211122#RESPOND)
anand kumar
time 2.18 of q 3 is of both not only of bhind
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=217866#RESPOND)
sunny kumar
kindly help with below questionmy answer- 48.
actual answer-24
twenty four men can complete a work in 16 days.
thirty two women can complete the same work in 24 days.
sixteen men & sixteen women started working and worked for twelve
days
how many more men are to be added to complete the remaining work in
2 days?
thanks.
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-BLEAVES-COMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=219424#RESPOND)
Ron
it will be better if u could also write ur procedure of solving this Q.
Nevertheless,I think u made mistake by not subtracting 48(men req
to complete work in 4 days)-24(men already present)=24(men req)
.hope this will help
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENTB-B-LEAVES-COMPLETION-VARIETY-CASES.HTML?
REPLYTOCOM=247340#RESPOND)
sunny kumar
24M*16=32W*24
M=2W
So 16*2W+16W = 48(Total work)
w= 1
m=2
now no work left to be done as m again getting 48.
please help
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3XEFFICIENT-B-B-LEAVES-COMPLETION-VARIETY-CASES.HTML?
REPLYTOCOM=326427#RESPOND)
divya
M=2W
16M+16W=24M
we already know 24M can complete work in 16 days
24M work for only for 12days and remaining needs to
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=219412#RESPOND)
Lakhan Jadeja
A B C together do work in 10 days. B C together work thrice as much as A
and A and B together work four time as much as C in what time thay can
do each other ?
sir i follow your method to solve time work quesiton but in this method
how to put your method plz guide me
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=228587#RESPOND)
AJ
How to solve this one with STD approach:
A pump can fill a tank with water in 2 hours. Because of a leak, it took 2
hours to fill the tank. The leak can drain all the water of the tank in:
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-BLEAVES-COMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=228595#RESPOND)
AJ
How to solve this one also with STD approach:
A tank is filled by three pipes with uniform flow. The first two pipes
operating simultaneously fill the tank in the same time during
which the tank is filled by the third pipe alone. The second pipe fills
the tank 5 hours faster than the first pipe and 4 hours slower than
the third pipe. The time required by the first pipe is:
A. 6 hours B. 10 hours
C. 15 hours D. 30 hours
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=228589#RESPOND)
AJ
How to solve this one with STD approach:
A pump can fill a tank with water in 2 hours. Because of a leak, it took
(7/3) hours to fill the tank. The leak can drain all the water of the tank in:
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=228596#RESPOND)
AJ
How to solve this one also with STD approach:
A tank is filled by three pipes with uniform flow. The first two pipes
operating simultaneously fill the tank in the same time during which the
tank is filled by the third pipe alone. The second pipe fills the tank 5
hours faster than the first pipe and 4 hours slower than the third pipe.
The time required by the first pipe is:
A. 6 hours B. 10 hours
C. 15 hours D. 30 hours
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=231643#RESPOND)
Arya
I would like to ask one question, for which i am not able to get the
solution from above cases. Please help me in solving the question.
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-BLEAVES-COMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=247350#RESPOND)
Aanya
Suppose A alone can do the work in a days.
Suppose B alone can do the work in b days.
By First statement - 1/a + 1/b = 1/5
Second statement A works twice as efficiently as he did means if
earlier he was taking a days now he will take only a/2 days.
Similarly B will take 3b days .
Thus,
2/a + 1/(3b) = 1/3
Solve above two to get value of a.
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-BLEAVES-COMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=247352#RESPOND)
Aanya
Suppose A alone can do the work in a days.
Suppose B alone can do the work in b days.
By First statement - 1/a + 1/b = 1/5
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=233684#RESPOND)
Preeti
Thanks Mrunal
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=233761#RESPOND)
Sajal Sinha
person A can do a job in x days
person B can do a job in y days
part of job done by person A alone in one day is 1/x th part
part of job done by person B alone in one day is 1/y th part
part of job done by A and B together in one day is 1/x + 1/y th part
So total days required to do the job is 1/(1/x +1/y) { Suppose I can do
1/5th part of job in one day so I will need 1/(1/5) days i.e 5 days to
complete the job}
This is the only theory there are no other rules or tricks
The origin to this theory is that you cannot add inversely proportional
relations
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=246039#RESPOND)
sneha
mukul and vipin together do a work in 6 days. if mukul does 1/5 part of
the work in 2 days, in how many days will vipin alone do the remaining
work ?
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-BLEAVES-COMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=246065#RESPOND)
Ravi
Mukul does 1/5 work in 2days therefore in one day he can do 1/10
work. So he alone can complete work in 10 days
Vipin and mukul together= 1/6
Vipin alone= 1/6 1/10 = 1/15
So vipin alone can do in 15 days.
But 1/5 work has already been done by Mukul so the remaining
work is 4/5
Vipin does 1 work in 15 days.
He can do 4/5 work in 15X4/5 days = 12 days
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-BLEAVES-COMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=246137#RESPOND)
Abhay
12??
Total combined efficiency= 100/6= 16.67
Mukul can do 100 percent wrk in = 5*2=10
Mukul efficiency= 100/10=10
therefore Vipin efficiency= 16.67-10= 6.67
Work left=4/5=80%
therefore numberbof days for vipin to complete= 80/6.67= 12
days??
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-BLEAVES-COMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=246145#RESPOND)
Praveen
ms 1day work= 1/10
(m+v)s 1day work=1/6
vs 1day work= 1/6-1/10 = 4/60
v takes to complete the work alone= 60/4=15 days.
hope im clear
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-BLEAVES-COMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=266457#RESPOND)
ASHISH
i think 7 days
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=247236#RESPOND)
sunny kumar
The shape of a garden is rectangular in the middle and semi circular
at the both ends . Find the area and the perimeter
of this garden.
total length of garden- 20 m
bredth of garden- 7 m
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-BLEAVES-COMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=247345#RESPOND)
Aanya
You are getting the area right so you are clear that garden is a
rectangle of 7*13 and 2 semi circles of radius 3.5 . These semi
circles are adjacent to the sides of length 7.
Now perimeter 13*2 (free sides) + 2*22/7*3.5 (2*22/7*r) = 48
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=247339#RESPOND)
sunny kumar
24M*16=32W*24
M=2W
So 16*2W+16W = 48(Total work)
w= 1
m=2
now no work left to be done as m again getting 48.
please help
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=247399#RESPOND)
kiran
sunny complete que liko plz y tnw ka
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=248779#RESPOND)
sunny kumar
got it.i was double counting the perimeter.
thanks!
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-BLEAVES-COMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=328973#RESPOND)
niharika
permiter of the garden is 76m
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=248780#RESPOND)
sunny kumar
1 more for youkindly help with below questionmy answer- 48.
actual answer-24
twenty four men can complete a work in 16 days.
thirty two women can complete the same work in 24 days.
sixteen men & sixteen women started working and worked for twelve
days
how many more men are to be added to complete the remaining work in
2 days?
thanks.
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=248784#RESPOND)
Anurag
16x24M=32x24W => M=2W .Now the total work is 16x24M .
16M+16W = 24M work completed 24x12M remaining 24x4M means
96M work still remaining , 24M can do 24M work per day,means they will
complete 48M work,remaining is 48M it needs 24 more Men or 48 more
women.
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=251977#RESPOND)
shivangi
can any1 plzz help me with this ques?
20 women can finish a job in 20 days.after each day, a woman is replaced
by a man and a man is twice as efficient as a woman.on which day does
the job get completed?
ans is 18th day.
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-BLEAVES-COMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=266175#RESPOND)
rahul
In question, 20 women can finish a job in 20 days. assume every
women has 2 units then total unit of work is 20*2*20=800 unit(20
women has 2 unit each and work for 20 days).
Second term of question, After each day a women is replaced by a
man and a man is twice as efficient as a women,
hence, man unit is 4 (because it is twice as efficient as a women)
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=251978#RESPOND)
shivangi
sorry typeing errroranswer to above question is 14th day..
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=285064#RESPOND)
samikssha
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=285299#RESPOND)
rahul
in last question why a and b work together for 90 days,in rest of the
questions its not like that
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=295983#RESPOND)
Abhishek
Two pipes L and M can fill a tank in 15 and 12 h respectively and a 3rd
pipe N can empty it in 4 h. If the pipes are opened at 8 am 10 am and 11
am respectively find the time the tank will be emptied.
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=311938#RESPOND)
San
the answer is 16.50.
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=319666#RESPOND)
murali
thanku mrunal sir
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=321310#RESPOND)
mrunal fan
Bhai thanks
Itna bhadiya concept samjhane k liye
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=322331#RESPOND)
Anas M
Mrunal Bhai, I am expert in Time and Work type question. all because of
you.
Thank you so much.
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=325371#RESPOND)
Sai Datta
Mrunal sir.. Im deaf man. I understand your explanation clearly. Now Ive
some doubts. Please clear my doubts before having bank exam next
week.
Here some questions :
1) A and B can do a piece of work in 30 days, while B and C can do the
same work in 24 days and C and A in 20 days. They all work together for
10 days when B and C leave. How many days more will A take to finish
the work?
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=328298#RESPOND)
Parul
10 men and 15 women can finish a work in 6 days. One man can alone
finish a work in 100 days. In how many days will a woman finish the work
?
sir how will it be solved by Std table?
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=328727#RESPOND)
Rashi
Can someone solve this question with the above mentioned technique:
Two pipes A and B can fill a tank in 24mins and 32 mins. If both pipes are
opened together,after how much time B should be closed so that tank is
full in 18 mins. [Ans. 8mins]
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-BLEAVES-COMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=328731#RESPOND)
deepak
(18/24)+(x/32)=1
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-BLEAVES-COMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=328778#RESPOND)
vipin
its very easy. speed of a comes out to be 4 . speed of b= 3 . total
distance or time = 96. a+b = 7 . now take time of a+b = x and a
alone to be 18 x . now the equation will be 7x + 4 ( 18 x ) = 96 .
solve it and you will get the value of x = 8 min .
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENTB-B-LEAVES-COMPLETION-VARIETY-CASES.HTML?
REPLYTOCOM=328782#RESPOND)
vipin
total distance =96 and not time
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=328797#RESPOND)
rakesh
FOR MPPSC ADMIT CARD PLEASE GO TO APPLY ONLINE LINK CLICK
STATE SERVICES EXAM 2014 AMD DWLD ADMIT CARD
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=335713#RESPOND)
SANTHOSH S K
Sir, how to solve using STD table A can do a work in 15 days and B in 20
days. If they work on it together for 4 days, then the fraction of the work
that is left is?
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=337911#RESPOND)
siddharth
REPLY (/2012/11/SPEED-TIME-WORK-TWO-MEN-CAN-FINISH-WORK-3X-EFFICIENT-B-B-LEAVESCOMPLETION-VARIETY-CASES.HTML?REPLYTOCOM=338752#RESPOND)
tejaswi
A can do a piece of work in 80 days.he works at it for 10days and then B
alone finishes the remaining work in 42 days .in how much time will A
and B working together , finish the work????
pls solve this using STD method ..
ANS: 30 DAYS
Name?
Email ID?
What is your Message? Search before asking questions & confine discussions to exams
related matter only.
Post Message
Search B4 Asking
Type n Press Enter
4 Days : CMS-15
18 Days : CAPF-15
46 Days : SSC CGL15
60 Days : CSAT-15
101 Days : IBPS-PO-15
164 : IBPS-Clerk-15
177 Days : Mains-15
Recent Comments
DEVENDER { Mrunal, what about may, June current affairs series?? } [Economy Lecture]
GS2: UNFCCC Lima Summit, Paris Summit Post-2020... (http://mrunal.org/2015/06/economylecture-paris-summit-post-2020-climate-finance-framework.html/comment-page1#comment-340678)
ABHISHEK { now how many lecture still remain to complete the economic lecture. sir please
discuss } [Economy Lecture] GS2: UNFCCC Lima Summit, Paris Summit Post-2020...
(http://mrunal.org/2015/06/economy-lecture-paris-summit-post-2020-climate-financeframework.html/comment-page-1#comment-340641)
ISHU { THANKUUUUUU..SO MUCH SIR.. my economics was not so good and i have fear for that
but after listening to ur lectures all doubts are clear.... } [Economy Lecture] GS2: UNFCCC Lima
DWARIKA { in composition of the interior of the earth need updation in part of crust property
you are mentioned potassium is lowest in earth's crust ,... } [Geography Lecture1] Longitude,
ANN { Thanks for the MCQs on IYB :) } [Mock Test #3] India Yearbook Chapter 1 to 12:...
(http://mrunal.org/2015/06/upsc-mock-test-paper-1-india-yearbook.html/comment-page1#comment-340565)
VIMAL { product of two number is 600.Lcm of thease number 10.What is the HCF of those two
number? } [Aptitude] LCM, HCF, GCD: Basic concept, calculation, applications explained
(http://mrunal.org/2013/03/aptitude-lcm-hcf-gcd-basic-concept-calculation-applicationsexplained.html/comment-page-2#comment-340559)
HARSHADNARKAR { What is your Message? Search before asking questions & confine
discussions to exams related matter only. sir,history lectures kab honge. } [Economy Lecture]
JOHNSSWARGIARY { ist true that double the money plz ans me } [Financial Inclusion]
Kisan Vikas Patra (KVP): Features, Money Laundering,... (http://mrunal.org/2014/12/kisanvikas-patra-kvp-features-money-laundering-black-money-tax-benefit.html/comment-page1#comment-340548)
NAVEEN { Prateek even i got.....291 marks.....what about the reserved list??? Whts the
procedure?? } [CAPF-2014] Final result out, 105 selected, marksheets in 15...
(http://mrunal.org/2015/02/upsc-capf-2014-final-result-marksheet.html/comment-page2#comment-340545)
Vacancies
Entire List shifted to bottom. Scroll down
(http://www.alexa.com/siteinfo/mrunal.org)
Mega Jobs
23-Jul: IBPS Rural PO & Asst. (http://ibps.in/html/cwe_rrb.htm)
17-Aug: IGNOU PG Admission (https://onlineadmission.ignou.ac.in/Login.aspx)
17-Jul: NDA Officers (http://upsconline.nic.in/mainmenu2.php)
13-Jul: SSC 10+2 (http://www.ssconline.nic.in/)
09-Jul: APFC Provident Fund Comm.
(http://www.upsc.gov.in/recruitment/advt/2015/Spl.Advt.52-15%20Web%20Cell.pdf)
09-Jul: Punjab Corp Engineer (http://202.164.52.147/serv1/docs/dysecyrect121017527.pdf)
09-Jul: Punjab Corp Clerks (http://202.164.52.147/serv1/docs/dysecyrect121017527.pdf)
07-Jul: RBI Assistants (504) (https://opportunities.rbi.org.in/Scripts/bs_viewcontent.aspx?
Id=3024#AN)
02-Jul: FCI MT (1Lakh Bond,3yr) (https://fcijobsportal.com/fcimt2015/pages/index.aspx)
01-Jul: Haryana Health Services (http://haryanahealth.nic.in/)
Rural Banks
23-Jul: IBPS Rural PO & Asst. (http://ibps.in/html/cwe_rrb.htm)
25-Jun: Odisha Gramya (http://www.odishabank.in/Recruitment.aspx)
25-Jun: Assam Gramin (http://www.agvbank.co.in/recruitment.php)
24-Jun: Haryana Gramin Bank PO (http://www.shgb.co.in/RecruitmentsandPromotions)
IT Jobs
20-Jul: CDAC Noida (http://www.cdac.in/index.aspx?id=ca_noida_may_2015)
Engineers
02-Jul: BEL Ghaziabad (http://bel-india.com/recruitment)
02-Jul: ISRO Scientists (http://isro.gov.in/careers)
02-Jul: FCI Engg.Trainee (http://www.fcijobsportal.com)
30-Jun: Hindustan Latex Biomed. Engg (300) (http://www.hlfppt.org/)
26-Jun: RBI JE (https://rbi.org.in/scripts/Bs_viewcontent.aspx?Id=3020)
26-Jun: Bharat Dynamics (http://bdl.ap.nic.in/bdlrecruit.htm)
25-Jun: Raipur Civil Engg (http://www.aiimsraipur.edu.in/Career.aspx)
25-Jun: MP Electricity
(https://www.mponline.gov.in/Portal/Services/Recruit_MPKVV/Indore/notification.aspx)
24-Jun: KRIBHCO Noida (http://kribhco.indiainformative.com/Post4.aspx)
Legal
Specialists
31-Jul: IIIT Allahabad Gr. A & B (http://www.iiita.ac.in/announcements.php)
20-Jul: State Trading corp. (http://www.stc.gov.in/careers/current-openings.aspx)
20-Jul: NISER APO (http://www.niser.ac.in/drupal_new/)
15-Jul: Jammu Univ. (http://www.cujammu.ac.in//Default.aspx?
option=article&type=single&id=32&mnuid=734&prvtyp=site)
15-Jul: MoEF Scientists (http://envfor.nic.in/advertisements)
09-Jul: Allahabad Bank (https://www.allahabadbank.in/english/Recruitment.aspx)
12-Jul: Mumbai Metro (https://mmrda.maharashtra.gov.in/tenders-notices)
12-Jul: GBPUAT (http://www.gbpuat.ac.in/)
09-Jul: Punjab Corp Law (http://202.164.52.147/serv1/docs/dysecyrect121017527.pdf)
07-Jul: NBCC Building (http://www.nbccindia.com/nbccindia/nroot/njsp/Career.jsp)
01-Jul: NIELIT Spec. (http://www.nielit.gov.in/recruitments.aspx)
30-Jun: Rajendra Agro. (http://www.mangaldhwani.com/pusa/wpcontent/uploads/2014/09/Advt_-01_2015.pdf )
30-Jun: IIT Kanpur (http://www.iitk.ac.in/new/vacancies-in-administrative-and-technicalcadre )
28-Jun: ONGC Rajbhasha (NET)
(http://ongcindia.ongc.co.in/wps/wcm/connect/ongcindia/home/career/recruitment+notices/recru
of-olo-2015)
25-Jun: Raj. Industrial Development (http://www.riicorecruitment.org/)
25-Jun: HSCC Noida (http://www.hsccltd.com/)
24-Jun: Haryana Gramin Agro (http://www.shgb.co.in/RecruitmentsandPromotions)
24-Jun: Haryana Gramin Law Officer (http://www.shgb.co.in/RecruitmentsandPromotions)
Medics
14-Jul: MP medical officer (http://www.mppsc.nic.in/)
30-Jun: HAL Medical officer (http://www.halindia.com/Common/Uploads/Resumes/144_CareerPDF1_Med-advt-AC.pdf)
ParaMedics
Not At the moment
Deskjobs
05-Aug: NBE Assistants (http://natboard.edu.in)
31-Jul: IIIT Allahabad Gr.C (http://www.iiita.ac.in/announcements.php)
20-Jul: NISER Clerks (http://www.niser.ac.in/drupal_new/)
15-Jul: Jammu Univ. (http://www.cujammu.ac.in//Default.aspx?
option=article&type=single&id=32&mnuid=734&prvtyp=site)
07-Jul: NBCC Building (http://www.nbccindia.com/nbccindia/nroot/njsp/Career.jsp)
01-Jul: NIELIT Deskjobs (http://www.nielit.gov.in/recruitments.aspx)
13-Jun: Bank Note Press (http://www.jobapply.in/bnpdewas/)
30-Jun: Lucknow Law univ. (http://rmlnlu.ac.in/recruitment-notification-process.html)
30-Jun: Rashtriya Sanskrit Sansthan (http://sanskrit.nic.in/advt_22_05_2015.pdf)
25-Jun: Pawan Hans Limited (http://pawanhans.co.in/site/Careern.aspx)
24-Jun: SJVN (PH) (http://sjvn.nic.in/careerdetail.htm?10/jobdetail)
Faculty
31-Jul: IIIT Allahabad (http://www.iiita.ac.in/announcements.php)
20-Jul: Raipur Univ. (http://www.prsu.ac.in:8010/Univ_Req.aspx)
15-Jul: NIT Puducherry (http://www.nitpy.ac.in/assets/teaching.pdf)
16-Jul: RPSC Home Science (http://rpsconline.rajasthan.gov.in/)
15-Jul: Jammu Univ. (http://www.cujammu.ac.in//Default.aspx?
option=article&type=single&id=32&mnuid=734&prvtyp=site)
12-Jul: GBPUAT (http://www.gbpuat.ac.in/)
10-Jul: NITTTR Chandigarh (http://www.nitttrchd.ac.in )
07-Jul: Palampur, Himachal asst. (http://www.ihbt.res.in/recruit/recruitNotice.php)
06-Jul: PEC Chandigarh (http://pec.ac.in/~pecac/new/jobs)
03-Jul: SKHM Government Medical College (http://www.gmcmewat.ac.in)
30-Jun: IIT Roorkee (http://www.iitr.ernet.in/administration/pages/Openings+Faculty.html)
Uniform
19-Jul: Navy Officers (http://www.irfc-nausena.nic.in/hindi/join_indiannavy.htm)
17-Jul: NDA Officers (http://upsconline.nic.in/mainmenu2.php)
15-Jul: Army Dental (23) (http://indianarmy.nic.in)
10-Jul: Army 10+2 (http://joinindianarmy.nic.in/)
30-Jun: BSF Constable (http://bsf.nic.in/en/recruitment.html)
15-Jun: Navy Sailers (SSR) (http://nausena-bharti.nic.in/forthcomingSailor.php)
15-Jun: Daman Diu Constables (http://daman.nic.in/jobs/2015/616-12-05-2015.PDF)
B.Com,CA,HR,MBA
20-Jul: Pawan Hans Audit (http://pawanhans.co.in/site/Careern.aspx)
06-Jul: GBPUAT Accountant (http://www.gbpuat.ac.in/)
01-Jul: NIELIT Accounts (http://www.nielit.gov.in/recruitments.aspx)
25-Jun: MP Electricity Accounts
(https://www.mponline.gov.in/Portal/Services/Recruit_MPKVV/Indore/notification.aspx)
21-Jun: Lucknow Metro Accounts
(https://www.digialm.com/EForms/html/form2399/index.html)
RESULT /MARKSHEET
SSC 2014 T2
NCLAT
Hotel Management
TENTATIVE NOTIFICATIONS
IAS-IPS-IFoS: 16 May
IES: 7 Feb
SSC CGL: 2 May
SSC 10+2: 6 June
SSC Sub insp: 28 Mar
CAT: Aug 2015
RBI Officer / Assistant: ??
IBPS PO / Clerk / RRB: ??
ACIO 2015: ??
1. Online Form Part-I stops few days before deadline, so don't wait till last date. Dont forget
reg.id & roll no.Note'em in Google Drive (https://www.google.com/drive/)
2. I usually update vacancies every Monday.Purple link= newly added,Blue= existing.Last
updated Mon. Jun 22, at 9:04PM
(https://plus.google.com/10945534686828
(http://feedburner.google.c
(https://www.facebook.com/Mrunal.org)
(https://twitter.com/mrunal_patel)
rel=author)
(http://www.youtube.com/user/The
uri=CivilServiceExam)
HOME (HTTP://MRUNAL.ORG/) / ECONOMY (HTTP://MRUNAL.ORG/ECONOMY)
/ DOWNLOAD (HTTP://MRUNAL.ORG/DOWNLOAD) / CONTACT ME (HTTP://MRUNAL.ORG/CONTACT)
The work of Mrunal (http://mrunal.org/) is under the Creative Commons Attribution-Non Commercial-ShareAlike 4.0
License (http://creativecommons.org/licenses/by-nc-sa/4.0/deed.en_US).Permissions beyond the scope of this license
may be available at Mrunal.org/contact (http://mrunal.org/contact).